Menu

Abdelhamid KARI

COURBEVOIE

En résumé

Expert Construction Ingénieur Piping , Pipeline, Génie Civil, Structure, Hydroteste, commissioning
Lead QAQC Ingénieur Projets Pétroliers
Spécialiste dans la gestion des projets industriels
Réduction cout du projet et respect des délais d'exécution

Mes compétences :
P&ID
Quality Control
Quality Assurance
Procurement
Provide engineering support
Technical support
Quality Management
Develop an oil field
Develop Quality Plan
TQM
Small Companies
Responsible for various Engineering
Responsible for Quality Control
Pipeline Quality Management
Manage the construction
Manage the CDC
Inspection experience
ISO 900X Standard
HANDBOOK PROJECT MANAGEMENT
Develop method statements
Design
Cathodic Protection
Traitement de texte
Flowlines
Wellheads
Gas Lift
Welding
Horizontal Wells
Develop the detail
Carbon steel
Assembly Plants

Entreprises

  • Total - Lead Pipeline Engineer Representative

    COURBEVOIE 2014 - maintenant TOTAL SONATRACH CEPSA JV Lead Pipeline Engineer SEOUL
    * Report to the Project Manager GTIM Seoul SOUTH KOREA ;
    * Lead Engineers from Samsung Engineering ;
    * Develop the detail Engineering for the Project in Timimoun Algeria ;
    * Representative of the client TOTAL at Samsung Engineering Center in Seoul South Korea ;
    * Review and Approve details calculations of Pipeline 260 Kms ( diameter 4'' , 6'', 8'', 10'', 12'' and 20 `' for Flowlines and Truncklines and Export Line ;
  • INVENSYS - QA/QC Manager

    Cergy 2012 - 2014 * Report to the Project Director of INVENSYS Hassi Messaoud Project Algeria ;
    * Manage the CDC ( Central Control Documents) ;
    * Develop QA system for tracking all activities of the Project ;
    * Conduct QA/QC issues for installation Network Connection of 750 wells by telemetry system ;
    * Prepare As Built of 750 Wells include Civil Works ;
    * Prepare Handover from INVENSYS to SONATRACH Hassi Messaoud.
  • GIP Gestion des installations Petrolieres - Lead Facilities Engineer

    2012 - 2012 GIP (Gestion Installations Pétrolières) Mauritanie Expert Engineer Engineering and Construction


    * Report to the owner Manager of GIP ;
    * Supervise the Studies of change many pipelines in Nouadhibou Port Pétrolier Mauritania.
    * Conduct construction and QA/QC issues for replacement many pipelines and structure already corroded.
    * Demolish many old facilities in Port included Structure, Pipelines, etc.
    * Review method statements for Welding, Hydro test , Lifting heavy equipment ,Commissioning, etc. ;
  • GOLDEN STONES - Various

    2011 - 2011 Various Companies- Algeria +Qatar Engineer Advisor
    * Report to the owner Manager of the company ;
    * Provide engineering support for various small company related Civil and Pipeline activities. ;
    * Conducted technical issues NCR, CAR etc...). ;
    * Re-wrote as-built P&ID'S and Isometrics in many facilities.
    * Develop method statements for Commissioning, Hydro test, Drying , Lifting heavy equipment etc ;
  • Addax Petroleum - Lead Pipeline Engineer

    Geneva 2009 - 2010 * Leading a staff of (02) Pipeline Engineers, (04) QA/QC Engineers, (01) Operator CAD and (04) Supervisors. ;
    * Report to Projects Manager of the company ;
    * Addax Petroleum is an upstream company which has to develop an oil field in Gabon. The role is to extract oil from the forest and transport it by canalizations from Wells to CPF then to expedition to port'
    * Fully conversant with relevant international standards
    * Develop MOC procedure, rewrote PID and Isometrics, develop Quality Plan.
    * Established Method Statements (Hydro tests, Gas Tests, Commissioning, Caliper, Intelligence Pigging, Drying and Hot Tapping works) then certification tests.
    * Execute technical support studies as requested. Provide engineering support to the construction / commissioning phases as necessary

    Mission: Design, Procurement and Construction (Pipelines + Manifolds) including Hydro test and Commissioning.
    * Pipelines; Concerned Pad lines, Flow lines, Gas lines, Gas lift Lines and Export Line.

    * 1. Pad lines (4)'': wellhead to Manifold on Pad. Number of Pad's = 12; Number of wells by Pad = 10 Horizontal Wells. Connections of 120 Wells are done...Total Length Pipes = 14 Kms
    Pad's are located in Three Areas : Obangue Centre, Obangue Est and Tsiengui
    In each area we have One CPF.All flow lines are connected to Manifolds Reception CPF's
    Pad lines are aboveground from Wellhead to cave then Underground from Caves to Manifolds.
    * 1. Flow lines (8'') and (4'') from Manifold Pad to Manifolds Reception at CPF's. Number of Flow lines = 12. Length of pipes 8'''= 36 Kms and pipes 4'' = 36 Kms. All flow lines are aboveground except Roads Crossing and Rivers Crossing.
    * 1. Gas line (6)'': Supply Gas from CPF Tsiengui to SHELL Stations. Length of Pipes = 7 Kms ;
    * 1. Gas lifts Lines (4)'' and (2)'': 4'' line is supplying Gas lift from CPF to Manifold Pad Gas lift. 2'' Gas lift line supply wells from Manifold. Total Length 4''' = 18 Kms and 2'' = 12 Kms
    All gas lines are underground.
    * 1. Export Line: Coucal to Rabi: Length of Pipes 12'': 39 Kms. This pipe is Underground
    Oil is coming from the CPF's ( Obangue Centre, Obangue Est and Tsiengui)
    This export line is connected to Shell Export Line 32'' from Rabi to Gamba Port.

    The total length of Pipes : 162 Kms

    * 1) Pipes 12'' = 39 Kms
    * 1) Pipes 8'' = 36 Kms
    * 1) Pipes 6'' = 7 Kms
    * 1) Pipes 4'' = 68 Kms
    * 1) Pipes 2'' = 12 kms

    * Manifolds : there are (03) types ( Manifold 10 Inputs 4'' on Pad and Manifold Reception 8''at CPF and Manifold Reception 12'' Export Line ) ;
    * 1. Manifold on Pad: each Pad has one manifold 10 Inputs 4''. The 10 wellheads on pad are connected to Manifold. Total Manifold Pad = 12
    From Manifold Pad the flow lines 4''' and 8''' will be connected to Manifold Reception at each CPF located. Total Manifold Reception = 3
    * 1. Manifold Reception 8'' at each CPF: received the Flow lines Production 8'' and the Flow lines 4'' Test.
    * 1. Manifold Reception 12''' for export line at Rabi

    Total Manifolds :15
  • ROUGE PIPELINE - Expert Engineer Commissioning

    2008 - 2009 * Leading a staff of 3 Commissioning Engineers and 8 Supervisors. ;
    * Report to Operations Manager of the company ;
    * This company is working for upstream activities the role is to connect pipeline from the wells to CPF
    * Established Method Statements (Hydro tests, Gas Tests, Caliper, Intelligence Pigging, Drying and Hot Tapping works) then certification tests.
    * Fully conversant with relevant international standards
    * Monitoring and analyze all Hydrostatic Tests and Commissioning Pipelines in accordance with Codes and Method Statements.
    PROJECT 1: OXY Oman Champ Mukhaizna (20 millions US$)
    Mission : Connection Wellheads to CPF including Hook-Up, Hydro test and Commissioning Pipelines and Gas Lift Lines :
    * Pipes ( Carbon Steel ) : 6 Kms (12)'' ; 3 Kms (6)'' ; 15 Kms (6)''; 10 Kms ( 2)'' ;
    * Rack Steel Structures are supporting pipes, cables, firewater lines... ;
    * Caracteristics : lengh : 1500 m, large 6m, heigh 4 m ; distance between columns 4m, ;
    * Most of the pipelines and gas lines are supported by sleepers d'huile et gaz lift sont portees ( zone pad's) other areas they are supported by Racks
    * Firewater Line 12'' and water utilities lines 6'' ; the different câbles for lights and substations.
    * Commissioning all the lines and start up in minimum timing

    PROJECT 2: PDO Gas Line Mukhaizna -Saddad ( 240 Kms)
    Mission : Realize and Supervise the drying of the Gas line 32'' : 240 kms with (05) intermediates stations .
    * Works done by specialized equipment rent from Norway . ;
    * This procedure prevent the gas line from explosion in contact with water. ;
  • Qatar Petroleum Engineering Major Projects - QA/QC Engineer

    2005 - 2008 * Majors Projects Dept is an upstream activities with the QP Organization ;
    * Report to the Project Manager of the company ;
    * Supervising and Monitoring activities of Installation GRP Pipe Line ( Ǿ up 4000 mm), in accordance with
    Standards, Drawings, Method Statements etc...
    * Supervising all Hydrostatic tests ( Cleaning, Filling, Pressurizing, Depressurizing, Dewatering and Commissioning)
    in accordance with Codes and Standards.
    * Supervise the construction and erection ( 08) Big Bridges Steel Structure for supporting 08 pipelines (Ǿ 3200 mm) ;
    * Manage MOC, NCR, PA/CA,CAR, etc... ;
    * Established WPS/PQR (API 1104 - ASME Volume V & Volume IX associated with AWS) ;
    * Responsible for Quality Control and Quality Assurance related for GRP Pipes issues (BS ISO 14692-1/2/3 & 4 ) ;
    * Good knowledge about ASME 31.3; 31.4 and 31.8 ( Thickness Pipe, Stress Analysis etc...) ;
    * Propose and approve solutions in order to get a good progress of construction works with high level of safety. ;
    * Execute technical support studies as requested. Provide engineering support to the construction / commissioning
    phases as necessary
    * Enforcing obedience to safety regulations.
    * Signing and reviewing all work permits.
    PROJECTS : Common Cooling Seawater Ras Laffan Qatar: Length of Pipe GRP diaméter ( 2.5 m up 4.0 m) : 92 Kms
    (1400 millions US$) : Cooling Seawater System for Gas Plants at Ras Laffan Industrial City according with standards and
    international codes .
    Mission : Supervision and quality contrôl of GRP Pipeline Works :
    * Construction and Commissioning of :
    1. 6 kms pipeline GRP (Ǿ 4000 mm )
    2. 72 kms pipeline GRP (Ǿ 3200 mm )
    3. 14 kms pipeline GRP (Ǿ 2500 mm )
    * Construction Steel Structure to support the 18 submersibles pumps ( 23 m3/s) each pump : height of pumps 12 m
    ; on average 25 tons by pump.
    * Concrete works for sleepers : total 12000 M3 to support the structure of saddles , pipe rack and Bridges. ;
    * Supervision of hydrotest and commissioning of pipelines. ;
    * Responsible Quality Control and Quality Assurance GRP Pipes by (BS ISO 14692-1/2/3 & 4 ) ;
    * Checking and approuve all modifications related for P&ID'S and Isometrics.
  • Sonatrach -British Petroleum J V - Senior Engineer

    1998 - 2005 * Leading a staff of (04) Field Engineers, (06) Supervisors, (01) Surveyor, (01)Operator CAD, and (03) Document
    Controllers
    * Report to Operations Manager of the company ;
    * Provide engineering support to maintenance and operations as requested. ;
    * Conducted technical issues in different areas (Wells , Plants, Manifolds etc...). ;
    * Calculation of thickness of piping , pipeline and manifolds ( stress Analysis etc..) ;
    * Re-wrote as-built P&ID'S and Isometrics. ;
    * Manage MOC, NCR, PA/CA,CAR, etc... ;
    * Established WPS/PQR (API 1104 - ASME Volume V & Volume IX associated with AWS) ;
    * Worked closely with Contractors in order to solve pertinent problems on site. ;
    * Analyzed, developed and recommend design approaches necessary to meet construction requirements for new
    and existing oil line in accordance with Q/A & Q/C procedures for all pipes ( Underground, Buried and
    Aboveground) .
    * Supervising and monitoring Hydrostatic tests ( Cleaning, Filling, Pressurizing, Depressurizing, Dewatering and Box
    Up) in accordance with Codes, Standards and Method Statements.
  • SARPI Sonatrach -Sadelmi - Senior Engineer

    1996 - 1997 * Leading a staff of (02) Field Engineers, (03) Supervisors, (01) Surveyor. ;
    * Report to Project Manager of the company ;
    * Provide engineering support to maintenance and operations as requested. ;
    * Conducted technical issues in different areas (Wells , Plants, Manifolds etc...). ;
    * Calculation of thickness of piping , pipeline and manifolds ;
    * Re-wrote as-built P&ID'S and Isometrics. ;
    * Established WPS/PQR (API 1104 - ASME Volume V & Volume IX associated with AWS) ;
    * Supervising and Monitoring Hydrostatic tests ( Cleaning, Filling, Pressurizing, Depressurizing, Dewatering and
    Commissioning ) in accordance with Codes and Standards.
    PROJECT: Gas line 48'' transmediterraneen Algeria -Spain ( section Hassi Messaoud to Hassi Rmel) Construction of (05)
    Switching Stations and Terminal Station at Hassi Rmel,
    * Inspecting & Monitoring all Fabshop works (Prefabrication Spools ,Hydrostatic tests, Sand Blasting, Painting etc..)
    in order to deliver on Sites.
    * Propose modifications on Isometrics and P&ID. ;
    * Pre-Commissioning & Commissioning the Piping and Pipelines ( Punch Lists, etc...) ;
    * Daily responsibilities involved supervising construction activities gas lines ( Civil and Mechanical) planning and
    checking weekly/monthly progress reports.
  • E.E.M - Project Manager

    1994 - 1995 Brega Lybia (Mechanical / Civil )

    * Leading a staff of 3 Field Engineers, 5 Supervisors, 01 Surveyor,1Operator CAD, 1 Safety Officer, and 2
    Technicians ( Planning , Cost Control).
    * Report to the General Manager of the company ;
    * Conducted technical issues in different areas (Civil,Steel Structure, Mechanical issues ). ;
    * Design and draw P&ID'S and Isometrics. ;
    * Established WPS/PQR (API 1104 - ASME Volume V & Volume IX associated with AWS) ;
    * Worked closely with the client ( Sirte Oil Company representative) to solve pertinent problems on site in order to
    get high quality and progress works.
    * Supervising and Monitoring Hydrostatic tests ( Cleaning, Filling, Pressurizing, Dewatering and Box Up) and
    Commissioning Pipelines in accordance with Codes and Method Statements.
    PROJECTS: Modification existing Oil Lines in Industrial Area (Sirte Oil Company) at Brega
    * Inspecting and Monitoring Fabshop activities (Welding pipes and steel structure , Hydrostatic tests, Sand Blasting,
    Painting etc..) in order to deliver on Sites.
    * Propose modifications on Isometrics for the Client. ;
    * Pre-Commissioning & Commissioning the Carbon Steel Piping and Pipelines . ;
    * Daily responsibilities involved supervising construction activities gas lines ( Civil and Mechanical) planning and
    checking weekly/monthly progress reports.
  • DVP ex SONACOME - Project Manager

    1986 - 1994 SONACOME ( National Production and Distribution Spare Parts
    (Civil / Mechanical )


    * Leading a staff of (02) Design Civil Engineers, (04) Supervisors,(01)Operator CAD, (01) Safety Officer, (01) Planner , (01) Cost Control and (01) Document Controller.
    * Report to the General Manager of the company ;
    * Conducted technical issues for civil and mechanical activities. ;
    * Conduct Evaluations of Tenders ;
    * Choose the EPC Contractor to build the factories. ;
    * Manage financial issues , contracts and procurement.
    PROJECTS: Construction (04) Fabrications Units :
    * 1. Bouira ( Center Algeria): 120 Kms from Algiers . Unit for fabrication Systems of Brakes for Cars ;
    * 1. Tiaret ( West Algeria): 300 Kms from Algiers .Unit for Fabrication of Dampers for Cars ;
    * 1. Sidi Bel Abbes ( West Algeria): 450 Kms from Algiers. Unit for fabrication of wheels for Trucks and Cars.
    * 1. Constantine ( East Algeria): 420 Kms from Algiers. Unit for distribution Spare Parts
    * Manage all modifications about ( Contracts, Design, Performance etc..)
    * Reviewed and Approve operating methods for the Construction Activities.
    * Analyze and correct the planning and the weekly/monthly progress reports in order to complete the job with good quality and saving money.
  • Sonatrach - Senior Construction Engineer

    1978 - 1986 (Pipe Line & Piping )


    * Leading a staff of (06) Constructions Engineers, (13) Supervisors, (02) Surveyors, (01) Safety Officer, and (02) Assistants ( Planning , Cost Control).
    * Report to Operations Manager of the company ;
    * Re-wrote ``as-built'' P&ID'S, Isometrics and Civil Drawings.
    * Manage all modifications on site which not matching with Design Drawings.
    * Established WPS/PQR (API 1104 - ASME Volume V & Volume IX associated with AWS) for all kind of pipes (Aboveground, Buried and Underground ) ;
    * Developed a global strategy for Recruitment and Training ( e.g. beginner Engineers and Technicians etc...)
    * Homologation of qualified Welder by API 1104 or ASME Volume IX.
    * Responsible for various Engineering and Construction assignments ranging from Civil Works, Welding, Hydrostatic Testing, NDE, Commissioning etc..
    * Supervising and Monitoring Hydrostatic tests ( Cleaning, Filling, Pressurizing, Depressurizing, Dewatering and Tie In) in accordance with Codes, Standards and Method Statements.
    * Inspection experience in piping including review of ITP/ WPS/ PQR/ WPQ/ MTR/ weld map etc,
    * Developed hydro static test method statements and witness of the same, review calibration records of pressure gauges, reinstatement of piping after hydrostatic test, monitor internal cleaning, Torque Flanges and its tightness etc.
    PROJECTS : Construction and Procurement of (02) Gas Lines (250 millions US$):
    * 1. Hassi R'Mel to Arzew : GZ3 42 '' = 280 Kms ( section Hassi Rmel -Tiaret) ;
    * 1. Hassi Rmel to Issers : GC1 42 '' = 220 Kms ( section Hassi Rmel -Djelfa)
    Mission : Manage the construction and the procurement of GC1 and GZ3
    * The two gas lines are totaly undrground except the tie-in with Compression Stations.
    * 1. Length of Steel Structure supporting the pipes : 2 kms (stations )
    * 1. Right of Way Works and Trenching works including concrete works for crossing roads and rivers. ;

Formations

  • API Algerian Petroleum Institute (Boumerdes)

    Boumerdes 1974 - 1979 Chartered Engineer

Réseau

Annuaire des membres :