TOTAL EP ANGOLA
- ELECTRICAL&INSTRUMENTATION ENGINEER
COURBEVOIE
2012 - maintenant
TOTAL Project: GirRI phase 2, Saipem Saint-Quentin-En-Yvelines, STX Saint-Nazaire Luanda Angola
* E&I coordinator, Detail engineering , construction and pre-com
* Construction and pre-com coordination of the utilities Module consist of electrical HV/LV room and HVAC room)
* Assistance to Girassol and Dalia FPSO's Hook-up team ;
* EPC contract (Saipem, main vendor STX ) ;
-
TOTAL EP Angola
- ELECTRICAL&INSTRUMENTATION ENGINEER
2011 - 2012
* Detail engineering, construction and pre-com of electrical and instrumentation part of the GirRI project (Girassol Ressources Initiatives)
* EPC contract (Friedlander) ;
-
TOTAL EP Angola
- INSTRUMENTATION SUPERVISOR
2009 - 2010
* Instrumentation Construction hook up and pre-commissioning activities of Gas injection platform for TOTAL (Saipem EPC contract)
* Provide expertise assistance according project requirements and Generals specifications of Total
* Responsible of technical deviation action during project execution ;
-
TOTAL EP Angola
- INSTRUMENTATION SUPERVISOR
2009 - 2009
* Supervise the instrumentation maintenance of the FPSO, cost control with SAP maintenance software. ;
* Maintenance daily meeting.
* Management of 8 technicians/foramens. ;
-
GSK
- Precommissioning, commissioning deputy manager
2007 - 2008
* Preparation of pre-com commissioning and start-up procedure and documentations according GSK specifications (pharmaceutical company)
* Manage start-up of HVAC installation of new GSK plant at Saint-Amand-les-Eaux France ;
-
Saipem
- INSTRUMENT SUPERVISORS
Montigny-le-Bretonneux
2004 - 2006
Exxon Mobile project: ERHA FPSO, Singapore towing and final location Nigeria
* Topside Commissioning, loop check and start up assistance to EXXON MOBILE field operations. ;
* FOXBORO and TRICONEX (SNCC and safety system ) ;
* Management of technicians according to first oil priorities.
INVENSYS, Cergy-Saint-Christophe
* FOXBORO and TRICONEX FAT for DALIA FPSO project (TOTAL).
* Check the SNCC conformity according TOTAL specifications.
* Checking of graphics, functional sequence and materials conformity ;
-
Hucathermique
- TECHNICAL MANAGER
2003 - 2004
HUCATHERMIQUE, Saint Andre
* Management of maintenance of industrial and domestic burners. ;
* Quotations, installation and start-up of new burners. ;
-
INOVA france
- Construction, START-UP MANAGER
Norroy-le-Veneur
2002 - 2003
UIOM, Le Mans
* Construction, hook-up, pre-com, com and start-up of the new waste incineration installation
* Management of electrical revamping of existing furnace and new electric building (TGBT) with 20 kV new transformers.
* Electrical safety manager (electrical room 20kV and all the installation)
* Replacement of a line of incineration (furnace, treatments of the fume, water treatment, steam turbine for electrical production)
* Training course for the operators and maintenance teams.
* Organisation of vendor's interventions.
* HSE and quality control responsible. ;
-
COPEX
- Construction PRECOM COM START-UP manager
2000 - 2002
* Pre-com, commissioning and Start up on Waste incineration plant.
UIOM, Antwerpen (Belgium)
* Supervision of the start up of two new lines of fume's treatments.
UIOM, Chinon
* Coordination of the start-up of fume's treatments and the furnace's revamping.
UIOM, Bessières (Toulouse)
* Coordination of the start-up of fume's treatments.
UIOM, Hénin-Beaumont
* Coordination of the start-up of fume's treatments and did a training course for the factory's personals. ;
-
TOTAL FINA ELF
- COMMISSIONING SUPERVISOR
1999 - 2000
LMS TECHNOLOGY, Guebwiller - FINA, Feluy Belgium (decennial shut-down)
* Coordination all instrumentations interventions scope on PP1 unit (polypropylene unit).
UIOM, Ouarville (Chartres)
* Pre-com com and start-up assistance of two new furnace and boiler lines.
RHODIA, Chalampé
* Revamping supervisor of ``ROSEMOUNT R.S.3''. SNCC of ``ADIPIC 3'' unit
SOLLAC, Mardick
* Supervision of the start-up of annealing furnaces. ;
-
SDEL Company
- INSTRUMENT TECHNICIANS
1991 - 1993
NOROXO, Harnes
* Instrument maintenance interventions on the OXO unit. ;
* Following up of the start-up procedures of critical safety according to the standard ISO 9002 ;
-
CIRA
- INSTRUMENT TECHNICIANS
PARIS
1991 - 1999
CIRA, Les pennes Mirabeau
* Commissioning on different petrochemical factories (TOTAL in Le Havre, Elf in Loison, MONTEFINA in Belgium, SAV in Mazingarbe, CRAY VALLEY in Creil and Drocourt), ;
* Also on alimentary factories (ORSAN AMYLUM in Nesle), cement factory (CCB Belgium) ;
* Start-up on ELF Leuna in East Germany. ;
* Work on the different system control command (FOXBORO IAS Series, ROSEMOUNT RS3 and YOKOGAWA)... ;