Assembly Plants
COM/DCOM
expertise assistance
budgets
assistance of two new furnace and boiler lines
SAP
Quality Control
Petrochemicals
Microsoft Office
ISO 900X Standard
Gas Injection
FPSO

Entreprises

  • TOTAL EP ANGOLA - ELECTRICAL&INSTRUMENTATION ENGINEER

    COURBEVOIE 2012 - maintenant TOTAL Project: GirRI phase 2, Saipem Saint-Quentin-En-Yvelines, STX Saint-Nazaire Luanda Angola

    * E&I coordinator, Detail engineering , construction and pre-com
    * Construction and pre-com coordination of the utilities Module consist of electrical HV/LV room and HVAC room)
    * Assistance to Girassol and Dalia FPSO's Hook-up team ;
    * EPC contract (Saipem, main vendor STX ) ;
  • TOTAL EP Angola - ELECTRICAL&INSTRUMENTATION ENGINEER

    2011 - 2012 * Detail engineering, construction and pre-com of electrical and instrumentation part of the GirRI project (Girassol Ressources Initiatives)
    * EPC contract (Friedlander) ;
  • TOTAL EP Angola - INSTRUMENTATION SUPERVISOR

    2009 - 2010 * Instrumentation Construction hook up and pre-commissioning activities of Gas injection platform for TOTAL (Saipem EPC contract)
    * Provide expertise assistance according project requirements and Generals specifications of Total
    * Responsible of technical deviation action during project execution ;
  • TOTAL EP Angola - INSTRUMENTATION SUPERVISOR

    2009 - 2009 * Supervise the instrumentation maintenance of the FPSO, cost control with SAP maintenance software. ;
    * Maintenance daily meeting.
    * Management of 8 technicians/foramens. ;
  • GSK - Precommissioning, commissioning deputy manager

    2007 - 2008 * Preparation of pre-com commissioning and start-up procedure and documentations according GSK specifications (pharmaceutical company)
    * Manage start-up of HVAC installation of new GSK plant at Saint-Amand-les-Eaux France ;
  • Saipem - INSTRUMENT SUPERVISORS

    Montigny-le-Bretonneux 2004 - 2006 Exxon Mobile project: ERHA FPSO, Singapore towing and final location Nigeria
    * Topside Commissioning, loop check and start up assistance to EXXON MOBILE field operations. ;
    * FOXBORO and TRICONEX (SNCC and safety system ) ;
    * Management of technicians according to first oil priorities.

    INVENSYS, Cergy-Saint-Christophe

    * FOXBORO and TRICONEX FAT for DALIA FPSO project (TOTAL).
    * Check the SNCC conformity according TOTAL specifications.
    * Checking of graphics, functional sequence and materials conformity ;
  • Hucathermique - TECHNICAL MANAGER

    2003 - 2004 HUCATHERMIQUE, Saint Andre

    * Management of maintenance of industrial and domestic burners. ;
    * Quotations, installation and start-up of new burners. ;
  • INOVA france - Construction, START-UP MANAGER

    Norroy-le-Veneur 2002 - 2003 UIOM, Le Mans

    * Construction, hook-up, pre-com, com and start-up of the new waste incineration installation
    * Management of electrical revamping of existing furnace and new electric building (TGBT) with 20 kV new transformers.
    * Electrical safety manager (electrical room 20kV and all the installation)
    * Replacement of a line of incineration (furnace, treatments of the fume, water treatment, steam turbine for electrical production)
    * Training course for the operators and maintenance teams.
    * Organisation of vendor's interventions.
    * HSE and quality control responsible. ;
  • COPEX - Construction PRECOM COM START-UP manager

    2000 - 2002 * Pre-com, commissioning and Start up on Waste incineration plant.

    UIOM, Antwerpen (Belgium)

    * Supervision of the start up of two new lines of fume's treatments.

    UIOM, Chinon

    * Coordination of the start-up of fume's treatments and the furnace's revamping.

    UIOM, Bessières (Toulouse)

    * Coordination of the start-up of fume's treatments.

    UIOM, Hénin-Beaumont

    * Coordination of the start-up of fume's treatments and did a training course for the factory's personals. ;
  • TOTAL FINA ELF - COMMISSIONING SUPERVISOR

    1999 - 2000 LMS TECHNOLOGY, Guebwiller - FINA, Feluy Belgium (decennial shut-down)
    * Coordination all instrumentations interventions scope on PP1 unit (polypropylene unit).

    UIOM, Ouarville (Chartres)

    * Pre-com com and start-up assistance of two new furnace and boiler lines.

    RHODIA, Chalampé

    * Revamping supervisor of ``ROSEMOUNT R.S.3''. SNCC of ``ADIPIC 3'' unit

    SOLLAC, Mardick

    * Supervision of the start-up of annealing furnaces. ;
  • SDEL Company - INSTRUMENT TECHNICIANS

    1991 - 1993 NOROXO, Harnes

    * Instrument maintenance interventions on the OXO unit. ;
    * Following up of the start-up procedures of critical safety according to the standard ISO 9002 ;
  • CIRA - INSTRUMENT TECHNICIANS

    PARIS 1991 - 1999 CIRA, Les pennes Mirabeau

    * Commissioning on different petrochemical factories (TOTAL in Le Havre, Elf in Loison, MONTEFINA in Belgium, SAV in Mazingarbe, CRAY VALLEY in Creil and Drocourt), ;
    * Also on alimentary factories (ORSAN AMYLUM in Nesle), cement factory (CCB Belgium) ;
    * Start-up on ELF Leuna in East Germany. ;
    * Work on the different system control command (FOXBORO IAS Series, ROSEMOUNT RS3 and YOKOGAWA)... ;

Formations

  • Centre Européen De Formation Maritime (Lorient)

    Lorient 2014 - 2014 BOSIET HUET
  • Lycée Blaise Pascal (Longuenesse)

    Longuenesse 1989 - 1991 BTS CIRA
  • Lycée Louis Pasteur

    Henin Beaumont 1985 - 1988 "A levels

    * Baccalaureate ("A levels") F3 (electrotechnical) - Pasteur
    * HND ("BTS") CIRA (industrial control of automated regulation) - Blaise Pascal high school, Longuenesse, France ;