Menu

Adem GÖK

ROUBAIX

En résumé

Nuclear Inspection for the manufacturing of ITER rector (Gadarache- France).
Mandate by Autorité de Sûreté Nucléaire for following the manufacturing in Europe in the different manufacturer:
- Walter Tostos- Chieti, Italy
- Belleli - Mantoue, Italy
- Mangiarotti Westinghouse -Monfalcone Italy
- ENSA- Santander, Spain
- ProBeam- Burg, Germany
- Mann Diesel & Turbo- Deggendorf, Germay
The nuclear classification is level 2 ESPN and the constrution rule is RCC-MR.
I am in charge to witness the FOAK ( welding , First of as kind operation) , any NDT ( Non destruction Test) and other production process ( heat treatment, hot and cold forming ...)for the production of different component in the different manufacture europe wide.

Mes compétences :
Nucléaire
Gestion de projet
Industrialisation
Conception mécanique
Offres commerciales
Robinetterie industrielle

Entreprises

  • VINCOTTE International - Technical coordinator Nuclear pressure Equipment Energy & other process indusrties

    2015 - maintenant
  • APAVE SUDEUROPE - Ingénieur chargé d'affaires Nucléaire ESPN

    Paris 2012 - 2015 Suivi des fabrications des GMPP EPR FA3 chez AREVA sous mandate N1 ASN
  • TYCO - Chargé d'affaires projets nucléaires

    Schaffhausen 2009 - 2012 Chargés d'affaires grands projet nucléaires ( EPR FA3- EPR Taishan- EPR OL3- Edf UTO Pièces de rechanges soumis à l'AM 12/12/2015 ESPN)
  • TYCO - Chef de projet robinetterie nucléaire

    Schaffhausen 2005 - 2009 Chef de projet nucléaire ( EPR FA3- EPR Taishan- EPR OL3- LngAo phae 2 - Qinshan phase 2 - Edf UTO Pièces de rechanges soumis à l'AM 12/12/2015 ESPN)
  • Westaflex - Ingénieur industrialisation

    Gütersloh 2003 - 2004 Responsable de l'achat et la mise en place des machines de découpes, formages et autres de la nouvelle ligne de Sortie Air Turbo pour les moteurs Renault K9K en remplacement des F4R.

Formations

Réseau

Annuaire des membres :