installation
Responsible for project
Preparation of progress report and progress paymen
Pneumatics
Microsoft Word
Microsoft PowerPoint
Microsoft Office
Microsoft Excel
Inspection fabrication pipe support
Computing Experience
Quality Control
Quality Assurance

Entreprises

  • ENGTP - Construction Engineer

    2015 - maintenant Construction Engineer at ENGTP(National Foundation for major petroleum works) rehabilitation and upgrading of surface installation of oil ports of skikda project
    SITE: piping under ground
    Responsible for project
    - Monitor project status and alert Project Manager of potential problem which may impede project progress. ;
    - Preparation of progress report and progress payment report. ;
    - Meeting clients to discuss the following.
    Keep them inform of the status and problems.
    - Monitor progress and activity schedule of project. ;
    - Attend meeting with customer & problem solving. ;
    - Manage sub-contractor to ensure quality and efficiency of work. ;
    - Piping installation such as above ground pipe and underground pipe. ;
    - Manpower and equipment loading plan.

    - Responsible for Control Function such as Schedule Control, Material Control, Progress Control, Cost Control, Drawing Control, Document Control and Progress Report.

    - Equipment installation and inspection.
  • ENGTP - Construction Engineer

    2015 - maintenant Construction Engineer at ENGTP(National Foundation for major petroleum works) rehabilitation and upgrading of surface installation of oil ports of skikda project
    SITE: piping under ground
    Responsible for project
    - Monitor project status and alert Project Manager of potential problem which may impede project progress. ;
    - Preparation of progress report and progress payment report. ;
    - Meeting clients to discuss the following.
    Keep them inform of the status and problems.
    - Monitor progress and activity schedule of project. ;
    - Attend meeting with customer & problem solving. ;
    - Manage sub-contractor to ensure quality and efficiency of work. ;
    - Piping installation such as above ground pipe and underground pipe. ;
    - Manpower and equipment loading plan.

    - Responsible for Control Function such as Schedule Control, Material Control, Progress Control, Cost Control, Drawing Control, Document Control and Progress Report.

    - Equipment installation and inspection.
  • ENGTP - Ingénieur en mécanique niv 1

    2015 - maintenant
  • RCH - QA/QC inspector

    2013 - 2013 piping QA/QC inspector at RCH company (rehabilitation &
    Adaptation of skikda refinery project)
  • RCH - QA/QC inspector

    2013 - 2013 piping QA/QC inspector at RCH company (rehabilitation &
    Adaptation of skikda refinery project)
  • RCH et sarl mipol /sud - QA/QC inspector

    2013 - 2014 piping QA/QC inspector RCH company ( rehabilitation &
    Adaptation of skikda refinery project)
  • Samsung engineering co-ltd - Superviseur piping et qa/qc piping

    2011 - 2014
  • SAMSUNG Engineering Co.,Ltd. - Piping Supervisor

    2011 - 2013 : Piping Supervisor at SAMSUNG Engineering Co.,Ltd. ( rehabilitation & adaptation of skikda refinery project)
  • SAMSUNG Engineering Co.,Ltd. - Piping Supervisor

    2011 - 2013 : Piping Supervisor at SAMSUNG Engineering Co.,Ltd. ( rehabilitation & adaptation of skikda refinery project)
  • SAMSUNG Engineering Co.,Ltd. - Piping Supervisor

    2011 - 2013 : Piping Supervisor at SAMSUNG Engineering Co.,Ltd. ( rehabilitation & adaptation of skikda refinery project)

Formations

  • UNIVRSITE 20 AOUT 1955 SKIKDA (Skikda)

    Skikda 2005 - 2010 ingénieur d'état
  • Institute Of Technology (Skikda)

    Skikda 2004 - 2010 Baccalaureate Degree
  • Institute Of Technology (Skikda)

    Skikda 2004 - 2010 Baccalaureate Degree
  • Université Du 20 Aout 1955 Skikda, Algerie (Skikda)

    Skikda 2004 - 2010 ingénieur d'état

Réseau

Annuaire des membres :