* Construction of the Gas Power Plants with ETTERKIB and PRAT and Whitney- USA in ADRAR ; TIMIMOUN ; EL OUED et HASSI MESSAOUD ; 2011 - 2012
For SONELGAZ/CEEG.
the Gas Power Plant
- Project Manager
2008 - 2011* Construction of the Gas Power Plant 4x149.9 MW and Substation 220/60/30 KV with ETTERKIB and ANSALDO-ITALY for SONELGAZ/CEEG
ETTERKIB
- SCHNEIDER
MEAUX2007 - 2008* Construction of the 08 Substations MV/MV with ETTERKIB and SCHNEIDER for SONELGAZ/SDO
ETTERKIB and AREVA
- Project Manager
2005 - 2007* Construction in (EPC) Engineering, procurement and construction of the MV/HV substation (66/10 KV ) with ETTERKIB and AREVA for SONATRACH/OHANET
Sonelgaz
- Project Manager
2005 - 2014Project Management
Electrical Works
- Electrical superviser
2004 - 2005the 220/400 KV GIS/Substation in KHOMS with ETTERKIB and STUCKY for GECOL/ACES Co-
* Cathode protection, electrical and instrumentation for the pipeline GK2-42'' with ETTERKIB and SONATRACH/SKIKDA. ; 1998 - 2003 ;
* ;
Sonelgaz
- Project Manager
1998 - 2003
ETTERKIB
- Maintenance Engineer
MEAUX1990 - 1998* Construction and oil treatment for the Powers Transformers with ETTERKIB in the industrials projects, substations and powers plants
Gas Power
- Site Manager
1987 - 1990* Construction the Gas Power Plants M'SILA 3x110 MW with ETTERKIB and ALSTHOM-FRANCE for SONELGAZ/KDM
ETTERKIB
- Méthods Engineer
MEAUX1984 - 1986* Construction of the thermal power plant 4x176 MW RAS DJINET with ETTERKIB and Consortium KWU/AUSTRIA for SONELGAZ/KDM
neant
- Cadre gestionnaire
Montpellier1980 - maintenant
ETTERKIB
- Electrical Manager
MEAUX1979 - 1981* Construction of the diesel power plant 4 x 6,5 MW in BECHAR with ETTERKIB and- MITSU for SONELGAZ/KD.