Menu

Ahmed GADA

MOBILE

En résumé

Mes compétences :
tender documents
population management
Primavera P6
Offshore Oil & Gas
Management of the budget and work equipment
Design and Build
Contractual monitoring of the works and contractua
Civil Engineering
Carpentry
Bill of Quantities
BTP

Entreprises

  • UrbaCon General Contracting - Quantity Surveyor

    2012 - maintenant Effectuer les mesures et les calculs nécessaires à l'évaluation des coûts des travaux réalisés
    Élaboration des offres de prix en cas des travaux hors contrat.
    Passer les commandes des sous traitants et en vérifier les facturations.
    Gestion des approvisionnements.
  • Urbacon Trading & Contracting (UCC) - Quantity Surveyor

    2012 - maintenant Projects:.
    Lusail Reclamation of Six Island Marine work Project Value 1.85 Billion QAR.
    Souq Waqif Car Park Project Project Value 850 Million QAR.
    Anantara Doha Island Resort Project Value 1.35 Billion QAR.
    Dukan Beach Place & Marina Project Value 365 Million QAR.
    Responsibilities:
    Evaluation on Civil(Structural, Hard & Soft Landscaping ), ID‐Luxury fit –out FF&E, Architectural Luxury finishers & MEP
    variation (HVAC, Electrical, Mechanical, Plumbing & BMS)
    Preparing monthly interim certificates for Client .
    Identifying the variations, Preparing V.O’s and Comparison between Tender and Construction stage and cost analysis
    Certify the interim payment
    Preparing material requests plan
  • UrbaCon General - Evaluating Sub Contractor

    2012 - maintenant Project: Dukhan Beach House Executing of the Design & Build for Renovation & Maintenance works for Beach
    Villa , which is comprised of number of Department Buildings; the site located in Al-Doha, Qatar. The Project
    Includes Several Buildings .
    Project: Anantara Doha Island Resort is an uninhabited offshore island situated approximately 3 -1/2 Kilometres
    from new Doha International Airport (closest main land point) and 11 Kilometres east of Doha City. The proposed
    project is to construct, develop and operate a 5 star island resort property.

    Key tasks and responsibilities:
    Evaluating Sub Contractor Invoices , Preparing Work execution and Payment Certificate.
    Evaluating Invoices With S.R.V., L.P.O and Payment Certificate For Suppliers.
    Quantity Take Off For Procurements some Items.
    Prepared Monthly Quantities Executed For Planning Engineer.
  • SPA. T.O.E.C. ALGERIE "Technical Office for Engineering & Contracting". - Métreur Vérificateur et Étude de Prix.

    2011 - 2012 Projet :Trust Real Estate-Complexe Résidentiel & Commercial-Bab Ezzouar-Alger.
    Présentation du projet :
    Promoteur : La société mixte jordano-qatarie, Trust Real Estate + ABC Groupe (Turquie) montant du Contrat : 250 millions de dollars Délais de réalisation : 30 mois Superficie globale : 280 000 m² bâtis, Début Travaux de réalisation : janvier 2009 Consistance des Travaux : plusieurs bureaux sur une superficie de 75 000 m², des commerces (200 000 m²), des logements résidentiels de haut standing (35 000 m²), des restaurants (10 000 m²), des clubs (15 000 m²) et des hôtels et appartements-hôtel sur une superficie de 25 000 m². Deux sous-sols pour contenir un parking de voitures d’une capacité de 2300 places. Emploi : la création de 3000 à 4000 emplois. Financement : 30% (fonds propre à la société) et 70% (financement extérieur).
    Mission : travaillant sur chantier j'avais pour taches :
    1. Préparation des rapports journaliers et hebdomadaires
    2. Actualisation des rapports d'avancement des travaux (PMS) avec le client chaque semaine.
    3. Préparer les éléments de facturation (minutes de calcul, attachement...)
    4. Effectuer les mesures et les calculs nécessaires à l'évaluation des coûts des travaux réalisés.
    5. Élaboration des offres de prix en cas des travaux hors contrat.
    6. Gestion des approvisionnements.
    7. Demandes, collectes et analyses des offres des sous traitants
    8. Passer les commandes des sous traitants et en vérifier les facturations.
    9. Préparation du DGD (Décompte Général Définitif).
    10. Préparation des (Plans AS-BUILT).
  • Spa T.O.E.C " Technical Office For Engineering & Construction " Algiers ,Algeria - Quantity Surveyor

    2011 - 2012 Projects:.
    Trust Complex Buildings Project Value 250 Million $
    Responsibilities:
    Elaboration and preparation of daily and weekly reports.
    Update of work progress report (PMS) weekly.
    Preparation of the invoicing elements .
    Elaboration of the calculation and necessary measurements for the evaluation of the costs of the realized works.
    Purchase control.
    Gather and analyze all the tenders of sub contractors.
    prepare the variation orders estimation follow up prices and submittal.
  • CONSTRUTORA ABRANTINA.SA. - Métreur Vérificateur et Étude de Prix.

    2010 - 2011 Projet : établissement hospitalier spécialisé (EHS) en cardiologie pédiatrique
    Client : Direction de la Sante et de la Population de Tizi Ouzou. Montant du Contrat : 20 millions d’euros Délais de réalisation : 30 mois Superficie globale : 9 hectares, Début Travaux de réalisation : janvier 2007 Consistance des Travaux : pour une capacité de 80 lits extensible, doté, d’un service des urgences, d'un service des consultations cardiologiques, de services d'hospitalisation avec deux unités dont une pour enfants et une autre pour nourrissons. Le plateau technique opératoire de cet hôpital comprend un bloc constitué de 3 salles d'interventions chirurgicales, d'une salle de cathétérisme (exploration avec imagerie), une salle d'électro- physiologie et une autre pour le traitement des affections cardiaux-pédiatriques, en plus d'un service de réanimation et de soins intensifs, d'un amphithéâtre de 300 places, de 2 salles de cours de 30 places et d'une bibliothèque. Emploi : la création de 1000 à 1200 emplois.
    Mission : travaillant sur chantier j'avais pour taches :
    1. Préparation des rapports journaliers et hebdomadaires
    2. Actualisation des rapports d'avancement des travaux (PMS) avec le client chaque semaine.
    3. Préparer les éléments de facturation (minutes de calcul, attachement...)
    4. Effectuer les mesures et les calculs nécessaires à l'évaluation des coûts des travaux réalisés.
    5. Élaboration des offres de prix en cas des travaux hors contrat.
    6. Gestion des approvisionnements.
    7. Demandes, collectes et analyses des offres des sous traitants
    8. Passer les commandes des sous traitants et en vérifier les facturations.
    9. Préparation du DGD (Décompte Général Définitif).
    10. Préparation des (Plans AS-BUILT).
    11. Évaluation mensuelle des charges directes et indirectes du projet (TCR).
    12. Établir les actualisations et révisions de prix.
  • Abrantina - Quantity Surveyor

    2010 - 2011 Project: Hospital specialized in Pediatric Cardiology.
    Owner: Health and population management of Tizi Ouzou
    Amount of contract: 20 Millions of Euro
    Period of realization: 30 Months
    Global area: 9 Hectares ,
  • Constructora ABRANTINA .SA - Quantity Surveyor

    2010 - 2011 Projects:
    Hospital specialized in Pediatric Cardiology Project Value 30 Million $
    Responsibilities:
    Responsible for monthly interim valuation / final valuation & invoicing with Client.
    Preparing monthly & annual commercial reporting (internal valuation).
    Detailed quantity take off for Re‐measurement & preparation of Bill of Quantities.
    Variation identification & preparing contractual claims from contract documents, site instructions, correspondence,
    drawing revisions and change in specification of material .
    Preparing fortnightly progress report and monthly progress report.
    Checking sub contractors bills and certification of the same.
  • BATIMETAL REALISATION - Commercial management

    2009 - 2010 Being working for the commercial management, I has to do:
    Establishment of the bill of quantities of the civil engineering work.
    Gather and analyze all the tenders of sub-contractors.
    To prepare the variation orders estimation follow up prices and submittal.
    Preparation of the Definitive General Discount.
    Establish update and prices revisions.
    Submit to offers by preparing and establishing tender documents and price units.
    Find out and prospect for new suppliers and sub-contractors.
  • BATIMETAL REALISATION (Commercial Department ) Algiers ,Algeri - Quantity Surveyor

    2009 - 2010 Responsibilities:
    Establishment of the bill of quantities of the civil engineering work.
    Gather and analyze all the tenders of sub contractors.
    prepare the variation orders estimation follow up prices and submittal.
    Establish update and prices revisions.
    Find out and prospect for new suppliers and sub contractors.
  • BATI METAL REALISATION (Direction-Commercial). - Métreur Vérificateur et Étude de Prix.

    2009 - 2010 travaillant au sein de la direction commerciale j'avais pour taches :
    1. Établir des descriptifs, des quantitatifs et estimatifs d'ouvrage tout corps d'état.
    2. Demandes, collectes et analyses des offres des sous traitants
    3. Passer les commandes des sous traitants et en vérifier les facturations.
    4. Préparation du DGD (Décompte Général Définitif).
    5. Établir les actualisations et révisions de prix.
    6. répondre à des appels d'offre avec l’établissement d’Étude de prix unitaire. 7. prospection de nouveaux clients et Sous traitants.
  • ETB TCE HADJILI AREZKI - Quantity

    2009 - 2009 Company specialized in secondary trades and technical carpentry: wood work, metal work, painting, it works
    primarily on museum and stenographic events. Specialized in the adjustments of areas such Public spaces, sports
    halls and Swimming pools. It is also involved in the development of shops or commerce, and employs about thirty
    people.
    Being working with the new manager, I was responsible for simultaneous multiple operations.
    Provide with my teams the following tasks:
    Preparation of the work by developing the project in execution.
    Necessary disposals within the starting of works,
    Definition of the diverse procedures,
    Having relationship with the workshops,
    Supervision of the work execution
    Management of the budget and work equipment's,
    completion and delivery of the works on time,
    Contractual monitoring of the works and contractual relationship with the client throughout the transaction.
  • Sports General - An intern

    2008 - 2009 of Tizi Ouzou:
    Project: Omni sports park Azazga with a stadium of 9000 places.
    Owner: Sports General Management of Tizi Ouzou
    Contract amount: 03 Millions of Euro
    Realization Period: 24 months ,
  • Direction de la Jeunesse et des sports de Tizi Ouzou. - Représentant stagiaire du maitre d’ouvrage chargé du suivi

    2008 - 2009 étant représentant stagiaire du maitre d’ouvrage sur chantier j'avais pour taches :
    1. Préparation des rapports journaliers et hebdomadaires
    2. Actualisation des rapports d'avancement des travaux (PMS) avec l’entreprise et le Maitre d’oeuvre.
    3. Préparer les vérifications des éléments de facturation (minutes de calcul, attachement...)
    4. Effectuer les mesures et les calculs nécessaires à l'évaluation des coûts des travaux réalisés.
    5. Participer aux réceptions provisoires des ouvrages achevés.
    6. Participer aux inspections techniques à travers le projet
    7. Veiller à l'application des spécifications techniques
  • Saeti - An intern

    2007 - 2007 1

    * Main Tasks:
    Elaboration and preparation of daily and weekly reports. Update of
    work progress report (PMS) with the owner weekly. Preparation of
    the invoicing elements (calculation MOM, details...)
    Elaboration of the calculation and necessary measurements for the evaluation of the costs of the realized works.
    Preparation and elaboration of the tenders or offers for the works not mentioned in the contracts.
    Purchase control.
    Gather and analyze all the tenders of sub-contractors.
    To prepare the variation orders estimation follow up prices and submittal
    Preparation of the Definitive General Discount
    Prepare the As-Built drawings.
    Monthly estimation of direct and indirect costs of the project.
    Establish update and prices revisions.

Formations

  • Office For Engineering & Construction (Alger)

    Alger 2011 - 2012 Project: Trust Complex Buildings
    Owner: Trust Real Estate Company
    Amount of the project: 250 Million Dollars
    Realization terms: 30 months Built
    Surface: 280 000 M2 built
  • Institut National De Formation Professionnelle Of Kouba, Algiers (EX : I.T.T.P.B) (Kouba)

    Kouba 2006 - 2009 Diploma of Senior Technician in BTP option: Quantity Surveyor and prices studies

    ‐Procurement of subcontractors and material, evaluate tenders on return, interview and negotiate with them if
    necessary, discuss potential problems and advise the Contract/Project Manager in placing a Subcontract Order.
    ‐Preparation of Tender Documents, Bill of Quantity
    ‐Measurement, Analysis and Evaluation of the works in accordance with the conditions of Contract
    ‐Preparation of Variation Or
  • Institut National (Alger)

    Alger 2006 - 2009 Diploma

    Senior Technician in BTP option: Quantity Surveyor and prices studies at "
    De Formation Professionnelle of Kouba, Algiers (EX : I.T.T.P.B)


    Vocational training


    Qualified training on implementation, basic functions and planning techniques by using PRIMAVERA P6.
    First-aid practice training within " Croissant Rouge Algérien "


    Languages knowledge

Réseau

Annuaire des membres :