VEOLIA WS Oil & Gas
- Lead Piping Engineer
2014 - 2016
SHELL CANADA- CARMON CREEK PROJECT (ALBERTA, CANADA)
* Lump-sum Contract, Engineering-Procurement-Construction (EPC). The produced water treatment
system has to meet three performance objectives; produce treated water that meets the Heat Recovery
Steam Generator (HRSG) and Once Through Steam Generator (OTSG) feed water specifications, meet
regulatory requirements for H2S and BTEX in both Boiler Feed water and waste streams, and reduce
the total dissolved solids (TDS) in the feed produced water. The nominal inlet capacity for the produced
water treatment system is 28,000 m3/d (per phase, two phase total).
-
TUBU CONSULTING
- Lead Pipe Stress Analysis Engineer
2014 - 2016
PETROLEUM DEVELOPMENT OMAN - 3 SPM's SUPPLY PROJECT
* Pipe Stress Calculations for single CALM Buoy System fulfilling DNV requirements. Considering
relevant loadings such as riser and floating hose loads, additional to survival load case. Used to check
stress compliance, reactions at pipe supports on turntable piping and structure as well as expansion
joints and nozzle loads at product Swivel unit. The buoy itself is free to move up and down, sideways
and in pitching and rolling motions.
Single Point Mooring (SPM) system which enables the vessel to weathervane whilst it loads or
unloads hydrocarbons, chemicals or fresh water. The two categories of SPMs are as follows:
- Single point mooring buoy that is designed for use by any trading tanker, and is thus independent of
the vessel
- System, such as a turret mooring, that is incorporated within a vessel such as an FSO or FPSO.
WAHA OIL COMPANY - ES SIDER TERMINAL CALM BUOY PROJECT
* Pipe Stress Calculations for single CALM Buoy System fulfilling DNV requirements. It's designed for
offshore application with water depths of up to 50 metres and beyond. The maximum mooring force is
400 Tonne and this is the most appropriate for the majority of terminals around the world. It consists of
a circular floating buoy anchored by means of multiple chain legs fixed to the seabed by either
conventional anchor legs or piles. The tanker is moored via hawsers to the turntable on the buoy. The
tanker is loaded or offloaded by means of flexible marine hoses from the buoy to the vessels manifold.
The connection between the piping inside the buoy and the subsea pipeline is by means of flexible
hoses.
-
OCCIDENTAL CHEMICAL CORPORATION
- Senior Piping Engineer
2011 - 2012
WOOD GROUP - - IRIS PROJECT (NEW JOHNSONVILLE, TENESSE -
USA)
* Detailed Engineering contract and procurement to construct a membrane cell chloric-alkali plant
adjacent to DuPont's Johnsonville titanium dioxide plant in Humphreys County, maximizing the
companies' ability to share resources and services. OxyChem's new chlor-alkali facility was designed to
produce up to 182,500 short tons of liquid chlorine and 200,000 dry short tons of membrane caustic soda
per year.
-
SENER INGENIERIA
- Pipe Stress Analysis Engineer
2009 - 2010
TORRESOL ENERGY - SOLAR+THERMAL POWER GENERATION PLANTS VALLE 1 and 2 (CADIZ,
SPAIN)
* The plants are part of a 510,000 sqm installation with solar-thermal energy source. The technology is
based on a series of curved mirrors in parabolic shape that focuses solar radiation on the focal line of
the parabola, where it is a tube that absorbs radiation by circulating a thermal oil fluid that is heated. This
fluid feed two steam cycles of 50 MW of electrical power. SENER has developed for this project, basic
engineering, detailed engineering and has participated in Lump Sum Turn Key (EPC).
-
TECHNIP
- Lead Pipe Stress Engineer & Senior Piping Engineer
Paris
2008 - maintenant
TOTAL FRANCE - PHOENIX PROJECT
* The La Mède site will include a bio refinery that will produce biodiesel primarily from used oils as well
as vegetable oils. The bio refinery will also produce other molecules, such as bio-naphtha for the
petrochemicals industry and bio-jet fuel. In designing this facility, a new technology developed by IFP
Energies Nouvelles and marketed by its affiliate Axens has been selected, which facilitates the
production of a high-quality biodiesel known as hydro-treated vegetable oil (HVO).
EVONIK INDUSTRIES - ZEPHIR PROJECT (ANTWERPEN, BELGIUM)
* EPC Project for the construction of two new units of butadiene extraction and MTBE production. Evonik
Industries operates eleven production facilities at its chemical site in Antwerp, Belgium. Among other
complexes, the 109- hectare facility houses the world's largest plant for producing methionine, an
essential amino acid.
REPSOL - P60 PROJECT (PUERTO LLANO, SPAIN)
* Detailed Engineering contract and procurement. Revamping project to improve competitiveness and
efficiency in the Lubricants Vacuum Distillation Unit 2 (U-701). The most important work for its
uniqueness and complexity have been the installation of two new modules of the new vacuum system,
the replacement of an intermediate section and revamp of the distillation tower. With this new production
system the quality of lubricating oils is improved and energy
TSU - AREVA NC BG Mines - IMOURAREN URANIUM PROJECT (IMOURAREN, NIGER)
* Detailed Engineering contract. The Imouraren mine was scheduled to begin producing uranium in
2013 and build up to an annual production rate of 5000 tons per year and represents an investment of
more than 1.2 billion euros (1.5 billion dollars). The mine is expected to have an operating life of over 30
years and it will be the largest mining project ever undertaken in Niger. The deposit covers 8 km by 2.5
km and contains 146,000 tonnes of measured and indicated uranium resources at 0.11% U.
CONOCO-PHILLIPS - WILHELMSHAVEN REFINERY UPGRADER PROJECT (WILHELMSHAVEN,
GERMANY)
* FEED engineering work FEL 2/3 contract, worth approximately EUR 22.5 million, to convert WRG to a
``Full conversion'' facility. Developing an efficient and robust « Full conversion » processing scheme that
utilizes the existing refinery infrastructure.
CEPSA S.A. - H2 HYDROGEN UNIT (HUELVA, SPAIN)
* Lump-sum engineering, procurement and construction (EPC) contract, worth approximately EUR 60
million, for a hydrogen plant. The plant, based on Technip's proprietary technology, have a capacity of
68,700m3/hour of hydrogen. It produce very high quality steam utilizing Technip's segregated/dual
steam system.
CEPSA S.A. - SULPHUR BLOCK - LA RABIDA REFINERY (HUELVA, SPAIN)
* Front end/Detailed engineering, the Sulphur Block project involves the Merox, SW, Amines, and
Sulphur Recovery units. The scope included detailed engineering, procurement and supply of equipment
and materials.
REPSOL YPF - TRANSFER LINE 16 "-P-1105 - TARRAGONA REFINERY (TARRAGONA, SPAIN)
* Change of material for the transfer line, including the branches arising from the manifold, using as new
materials, stainless steel TP321. The metallurgy of the lines was not adequate for the operating
conditions, since they have a high rate of internal corrosion widespread and uniform. The mechanism is
most likely due to the sulfidation reaction of carbon steel with sulfur compounds at high temperatures.
This fail also generate an outbreak of fire at the premises of the refinery.
ASESA (ASFALTOS ESPAÑOLES S.A.) - COGENERATION COMBINED CYCLE PLANT
(TARRAGONA, SPAIN)
* Lump-sum Contract, Engineering-Procurement-Construction (EPC), for the construction of a
cogeneration plant for electricity, thermal oil and steam combined cycle.
-
CB&I
- Lead Pipe Stress Analysis Engineer
2006 - 2008
CABINDA GULF OIL COMPANY - CABINDA LNG GAS PLANT (CABINDA, ANGOLA)
* Lump-sum EPC contract to provide a gas processing and treating complex that will help CABGOC
eliminate flaring of associated gas and recover hydrocarbon vapors from its oil storage terminal, and
produce saleable natural gas liquids (NGLs). Cabinda Gulf Oil Company Ltd. (CABGOC). The project
was valued at approximately US$250 million, it did include facilities for gas/oil separation, vapor
compression, amine treating for acid gas removal, glycol dehydration, refrigeration for NGL recovery,
molecular sieve dehydration of hydrocarbon liquids, and liquids fractionation to produce NGLs for export
and local consumption. Residual gas feed three turbines for electricity generation.
FRONTIER REFINING CO., INC. - COKE DRUM REPLACEMENT (EL DORADO, KANSAS - USA)
* CB&I provided engineering, procurement, fabrication, and construction for the Coke Drum
Replacement Project for Frontier Refining in El Dorado, Kansas. In general, the scope of work include a
new two drum delayed coker structure including two new Vertical Plate Technology Coke Drums. In
addition, the scope includes various modifications to the balance of the plant per the FEED Package.
-
TECHNIP ITALY Spa
- Pipe Stress Analysis Engineer
2004 - 2006
PIC - DOW OL2K ETHYLENE (SHUAIBA INDUSTRIAL AREA, AL-SHUAIBA, KUWAIT)
* Front end/Detailed engineering, for the construction of an ethylene plant at the new Olefins-2
Petrochemical Complex in Shuaiba, Kuwait. The plant, with a production capacity of 850,000 mt/year.
The project did includes detail engineering, procurement and supply of equipment and materials,
construction and pre-commissioning. The plant is based on Technip's in-house technology assuming
complete responsibility for steam crackers, from conceptual design to turnkey execution and construction
on a lump sum basis.
ENAP REFINERIAS S.A. - LOW SULFUR DIESEL PRODUCTION REVAMP OF HDS - Bio Bio
(CONCEPCIÓN, CHILE)
* EPC contract worth approximately 21 million euros (75% Technip) by ENAP Refineries SA for a new
hydro treating unit to be located at its Bio Bio Refinery at Talcahuano, Chile. The 12,000 BPSD (barrels
per stream day) hydro treating unit, based on Axens technology, produce low-sulfur diesel, limiting sulfur
emissions to 50 parts per million (ppm).
FLINT HILL RESOURCES - H2 HYDROGEN PLANT (PINE BEND REFINERY, MINNESOTA - USA)
* Lump-sum engineering, procurement and construction (EPC) contract, for a new hydrogen plant to be
built at the Pine Bend Refinery, MN, as part of a $100 million capital project that increased its crude oil
processing capacity by 50,000 barrels a day. The plant is based on Technip's proprietary technology
and it produce very high quality steam utilizing Technip's segregated/dual steam system.
CENTRAL OF PROCESS FACILITIES-CPF-BP EXPLORATION Co. (CUPIAGUA / CUSIANA -
CASANARE - COLOMBIA)
- Flow Lines, Well pads and Wellheads - GLOBAL CONTRACT FOR ENGINEERING 52688
- Dynamic Stress Analysis of Centrifugal Compressors, PIPING SYSTEMS CPF
- Dynamic Stress Analysis of BATCHING SYSTEMS, CPF
UNIT - 250 - BARRANCABERMEJA. ECOPETROL REFINERY (BARRANCABERMEJA -
COLOMBIA)
* Basic engineering review; detail engineering; procurement; construction and start-up for Topping U-
250, that includes the atmospheric and vacuum crude unit.
-
ODECO Ltd.
- Projects and Design Engineer
2003 - 2003
* Analysis of client needs and requests.
* Identification and analysis of process. ;
* Simulation and analysis in 3D of different type of Conveyors using Solid Edge and ALGOR-FEA
Software
* Materials Take Off ;
* Coordination of projects production personnel at workshop.
-
PROVIDENCIA SUGAR MILL
- Assistant Project Engineer
2001 - 2002
* Worked in the computational modeling and construction of a Sugar cane remnant Cutting machine.
Analyzing its mechanical stresses, using the finite element program ALGOR and SOLID EDGE. Using
this cane leftover as fuel in power boilers, replacing coal used. Generating environmental and economic
benefits.
* Verification of operational procedures.
* Flow Diagrams elaboration. ;
* Pumps and exchangers maintenance activities programming during shutdowns.
-
SMURFIT
- Assistant Engineer
1998 - 1998
KAPPA_Cartón de Colombia - Yumbo, * Assist as practice student on engineering standards related with technical characteristics of Heat
Exchangers, Pressure Vessels, and Tanks, designed under the requirements of TEMA & ASME codes
and standards.
* Assistant in activities related with inspection and control of tools, materials and payments.