Menu

Allali AHMED

NEW YORK

En résumé

Mes compétences :
Mud pump
BHA preparation
drilling experience
Rig Moves
Top drive
Mud system maintenance
Analytical Skills
Audit
Blowout preventer
Communication Skills
Drawworks
Responsible for adequate working knowledge
Responsible for morale
Stuck Pipe
Well Integrity
maintenance of the rig and drill string

Entreprises

  • Weatherford WDI - Driller

    2016 - maintenant Driller 2016 to now: in rig 802 weatherford
    Varco TDS-9SA .800 HP. 500 Ton
    Mud Pumps National Oilwell Varco's 10-P-130 Mud Pump is rated at 1300 input horsepower
    (969 kw) at 140 strokes per minute, with a 10-inch (254 mm) stroke
    DW 1500 HP
    Driller cabin second generation
    Working as driller. For weatherford in Algeria Sonatrash project, Drilling oil & gas wells up to
    5000 meters, 1 ½’’ drill line, rig watch system, BOP digital system screen, joystick cyber chair
    drawwork, SCR rig and VFD rig, catwalk hydraulic system,
    Experience of exploration wells, high temperature /high pressure wells, directional /horizontal
    wells, side tracks and conventional wells .
  • Weatherford International - Driller

    Genève 2016 - maintenant Varco TDS-9SA .800 HP. 500 Ton
    Mud Pumps National Oilwell Varco's 10-P-130 Mud Pump is rated at 1300 input horsepower
    (969 kw) at 140 strokes per minute, with a 10-inch (254 mm) stroke
    DW 1500 HP
    Driller cabin second generation
    Working as driller. For weatherford in Algeria Sonatrash project, Drilling oil & gas wells up to
    5000 meters, 1 ½'' drill line, rig watch system, BOP digital system screen, joystick cyber chair
    drawwork, SCR rig and VFD rig, catwalk hydraulic system,
    Experience of exploration wells, high temperature /high pressure wells, directional /horizontal
    wells, side tracks and conventional wells .

    Job Responsibilities:

    * Supervises and ensures safety of drilling crew as well as effective and
    efficient operations during tour of duty.

    * Responsible for maintaining full work crew.

    * Ensures that new crew members are properly trained and familiarized with

    safety procedures and manuals.
  • SAHARA SWCS - Driller

    2012 - 2016 Varco TDS-11SA .800 HP. 500 Ton
    Mud Pumps bomco 1600 hp
    DW 2000 HP
    Working as driller. For SAHARA in Algeria Sonatrash project, Drilling oil & gas wells up to
    5000 meters, 1 ½’’ drill line, rig watch system, BOP digital system screen, joystick cyber chair
    drawwork, SCR rig and VFD rig, catwalk hydraulic system,
    Experience of exploration wells , high temperature /high pressure wells, directional /horizontal
    wells ,side tracks and conventional wells
  • SAHARA SWCS - Assistant Driller

    2010 - 2012 Working on mud system and mud pumps
    I have also rescue at height certification
    BHA preparation and measure
    Working with height standards of safety with slb jv enfor
    Rig move of installation and equipments
    BOP & manifold test
    Working with 21 ¾’’ diverter
    Hand break and joystick driller cabin
  • SAHARA SWCS - Driller

    2010 - 2016 : in rig 3 rig 1 SAHARA SWCS (Schlumberge jv Enafor)
    Varco TDS-11SA .800 HP. 500 Ton
    Mud Pumps bomco 1600 hp
    DW 2000 HP
    Working as driller. For SAHARA in Algeria Sonatrash project, Drilling oil & gas wells up to
    5000 meters, 1 ½'' drill line, rig watch system, BOP digital system screen, joystick cyber chair
    drawwork, SCR rig and VFD rig, catwalk hydraulic system,
    Experience of exploration wells , high temperature /high pressure wells, directional /horizontal
    wells ,side tracks and conventional wells .
  • SAHARA - Material Man level 3

    2009 - maintenant
  • SAHARA SWCS - Assistant driller

    2008 - 2010 rig#1 and rig#3 SAHARA SWCS (Schlumberge jv Enafor)
    Working on mud system and mud pumps
    I have also rescue at height certification
    BHA preparation and measure
    Working with height standards of safety with slb jv enfor
    Rig move of installation and equipments
    BOP & manifold test
    Working with 21 ¾'' diverter
    Hand break and joystick driller cabin
  • Repsol - Assistant company man

    2006 - 2008 sonatrach - Repsol partnership to develop the so-call
    LNG integraled gassi touil project.
    Working as assistant company man rig ENAFOR rig 37 & ENTP rig 201
  • Steep forage Algeria - Drilling supervisor

    2004 - 2006 Water well
  • Steep forage Algeria - Driller

    2002 - 2004 Rig garden denver GD 2000
    Mud pump garden denver PZ 9
    Tesco 150/250 EMI 400 Top drive

    Working as driller on the project Sonatrach and steep forage corporation to developer new
    technologies in Algeria
    The well water driller total 3 well depth from 750m to 1000m with 13 3/8'' csg total depth
    1200m to 1500m
  • Steep forage Algeria - Derrickman

    2002 - 2003 Mud system maintenance (cleaning the tank (confine space) and change all size of valves,
    Work on mud pumps change the piston, liner, sat, valves
    Prepare the mud (mixing the mud) WBM, Brine, High vis, High density,OBM
  • Steep forage Algeria - . Floor man & roustabout

    2000 - 2002 Done all job giving by the supervisor cleaning, general job on the rig lifting rigging prepare
    the casing, RIH and POOH the BHA & casing help the derrick man

Formations

  • Tsp (Laghouat)

    Laghouat 2017 - 2017 level 3 (IWCF)

    : international well control level 3 (IWCF) corticated and expired June 2019
  • University Of AMMAR THELIDJI (Laghouat)

    Laghouat 1995 - 1998 Baccalaureate Degree

Réseau

Annuaire des membres :