Architecte chargé d’étude et de suivi de ; cantines communales, aires de jeux, maisons individuelles, Ecoles primaires, crèches, hangars, immeuble à usage de bureaux, et autres institutions étatiques tels que des projets de la gendarmerie nationale (GW, GIR, GGF, EGF,AS), tramway de OUARGLA et le premier parc éolien en Algérie ADRAR.

Mes compétences :
Microsoft Project
Microsoft Office
technical coordination
Office Buildings
Hangars
Feasibility Studies
Construction Law
Autocad
Adobe Photoshop
different culture communication skills
Strong communication skills
Quality Assurance
Project management training
Project management and coordination
Project Management
Office Suite 2010
Microsoft Word
Microsoft PowerPoint
Microsoft Outlook
Microsoft Excel
Mechanical Engineering
Masonry
Good experience
Documentaries
Constructions Diagnosis and preparation
Construction site
Civil Engineering
Building Permits
ArchiCAD
Membre de l’ordre des architectes

Entreprises

  • multinational Alstom - Engineer

    2015 - maintenant A year and six months

    GC interface engineer, multinational Alstom transport company (Ouargla project)

    Head of technical coordination of data exported by Alstom for the client and follow-up of the interface works
    with civil engineering in the framework of the construction of the first tranche of the Ouargla tramway and its
    extension:

    * Creation of interface sheets between civil engineering works and installation system works.
    * Supervise the civil work in progress to ensure meeting with installation system interface requirements.
    * ensure technical bridging coordination between civil engineering works, client and installation system
    works requirements.
    * Generate the weekly and monthly interfaces tracking reports.
    * Perform interface and synthesis meetings between the various project stakeholders.
    * Treatment of technical issues and follows the action plan to resolve them in time.
    * Follow the civil works and installation system works modifications as per the proposed study solutions.
    * Finalize the files of the executed works (AS-BUILT) for archival.
    Un an et demi

    Ingénieur interface GC, multinationale Alstom transport (Projet Ouargla)

    Coordination technique de données exportées par Alstom pour le MOE, et suivi de réalisation des travaux en
    interface avec le génie civil dans le cadre de la réalisation de la première tranche du tramway de Ouargla et
    de son extension :

    * Création de fiches d'interfaces entre lots génie civil et lot système. ;
    * Veille au respect des interfaces avec les travaux réalisés ou en cours de réalisation. ;
    * Faire les mises à dispositions des ouvrages GC réalisés entre le MOE et l'entreprise chargée du lot
    génie civil.
    * Etablissement des rapports de suivi des interfaces mensuel et hebdomadaire. ;
    * Assister aux réunions d'interfaces et synthèse entre les différents intervenants du projet. ;
    * Traitement des questions et problèmes techniques survenus en cours de réalisation du projet et
    les résoudre avec des fiches d'interface ou des détails complémentaires.
    * Faire le suivi des modifications chantier par rapport aux solutions proposés en étude et
    préparer les Dossiers des Ouvrages Exécutés (DOE, TQC ou AS-BUILT).
  • Cegelec - Architecte coordinateur technique & adjoint chef de projet

    Saint-Denis 2012 - 2015 Trois ans

    Architecte coordinateur technique et adjoint chef de projet, multinationale Cegelec du groupe VINCI
    (Bir-khadem Alger)

    Coordination technique, et suivi de réalisation d'un projet de construction d'une ferme éolienne de 10,2Mw
    de puissance à Kabertene Wilaya d'ADRAR Algérie :

    * Réalisation, suivi du dossier technique. ;
    * Assurer la bonne communication et la coordination entre le MO, le chantier et les différents BET sur
    Alger et en France.
    * Animer les réunions de travail avec l'ensemble des intervenants.
    * Chargé de suivi documentaire du projet jusqu'à obtention de l'approbation du MO et du CTC.
    * Dépôt du permis de construire. ;
    * Traitement des questions techniques du projet et les résoudre dans les meilleurs délais. ;
    * Assurer un support technique aux équipes du chantier. ;
    * Veiller au respect du plan d'assurance qualité du projet.
    * Sélection des prestataires techniques (Electricité, plomberie, chauffage, climatisation, ventilation et
    système eau).

    * Assurer le suivi des travaux réalisés et le respect du cahier des charges. ;
    * Suivi avancement régulier des études avec le client. ;
    * Dessin sur ordinateur des plans AS-BUILT (Tel Que Construit) de l'ensemble des spécialités (INF,
    ELE, GEN, MEC...) en coordination avec le maitre d'ouvrage et le chantier.
    * Constitution des dossiers finaux. ;
    * Management et coordination du projet durant toutes les phases.
    * Organisation et participation aux formations de maintenance (climatisation, ventilation, système eau
    et logiciel gestion de stock magasin pièces de rechange ...etc).
    Three (03)years

    Head of architect technical coordinator and subordinate of project manager, multinational Cegelec of
    the VINCI group (Bir-khadem Alger)

    Technical coordination and follow-up of a project to build a wind farm project of 10.2Mw of power at
    Kabertene in ADRAR Algeria:

    * Realization, follow-up of the study technical file. ;
    * Ensure good communication and coordination between the client, the construction site and the various study
    offices in both Algiers and France.
    * Perform project meetings with all stakeholders. ;
    * Documentary follow-up of the project till gaining the approval of the client and the third party control office
    CTC.
    * Prepare, finalize and deposit the legal building permit.
    * Treatment of technical issues and follow the action plan to resolve them in time.
    * Provide technical support to site crews. ;
    * Ensure compliance with the project's quality assurance plan.
    * Lead the technical selection of service providers (Electricity, plumbing, heating, air conditioning, ventilation
    and water system).

    * Ensure the follow-up of the work carried out and the respect the contract requirements. ;
    * Follow-up regular studies with the client. ;
    * Computer drawing of the AS-BUILT (As-Built) drawings of all the specialties (substructures, electric,
    mechanic, wind turbine ...).
    * Creation of final files. ;
    * Project management and coordination during all project phases.
    * Organization and participation in maintenance trainings of (air conditioning, ventilation, water system and
    store management software -spare parts area ...).
  • bureau d’études techniques DRAI ; Design Recherche Architecture et Ingénierie (Alger) - Architecte chargé d'études et de suivi

    Hellemmes-Lille 2010 - 2012 Une année et 10mois

    Architecte chargé d'études et de suivi, bureau d'études techniques DRAI ; Design Recherche
    Architecture et Ingénierie (Alger)

    Projets : maisons individuelles, hangars, immeubles à usage de bureaux, et autres institutions étatiques tels que des
    projets de la gendarmerie nationale (GW, GIR, GGF, EGF...), comportant : logements, réfectoires, ateliers de
    maintenance, Réfectoires de 500 repas et plus, blanchisseries, blocs administratifs, Station à carburant, bâches d'eau,
    locaux techniques...

    * Étude de faisabilité (étude de terrain, devis) et réalisation du dossier technique.
    One year and 10 months

    Architect in charge of studies and follow-up, technical office DRAI; Design Search Architecture and
    Engineering (Algiers)

    Projects : single houses (Villas), hangars, office buildings, and other state institutions such as the Gendarmerie
    National (GW, GIR, GGF, EGF ...) projects which include dwellings, refectories of 500 dishes and more,
    maintenance workshops, laundries, administrative blocks, fuel station, Water tanks, technical rooms ...

    * Feasibility study (field study, assessment) and technical file realization. ;
    * Studies of building regularization files under national construction Law 08/15 of 20 July 2008 and Executive ,
  • bureau d’études techniques RAYANIS ENGINEERING - Architecte chargé d'études et de suivi

    Hellemmes-Lille 2009 - 2010 Dix mois
    Architecte stagiaire chargé d’études et de suivi, bureau d’études techniques RAYANIS ENGINEERING
    (Alger)
    Projets : cantines communales, aires de jeux, écoles primaires, crèches, maisons individuelles, immeubles à usage de
    bureaux, salle de sport, murs de clôture, réhabilitation de plusieurs lycées, mosquée, stades, piscine :
    * Étude de faisabilité (étude de terrain, devis) et réalisation du dossier technique.
    * Études de dossiers de régularisation des constructions dans le cadre de la loi 08/15 du 20 juillet 2008
    et du décret exécutif n° 09/154 du 02 mai 2009.
    * Diagnostic de constructions et établissement des rapports d’expertise.
    * Dessin sur ordinateur des plans en coordination avec le maitre d’ouvrage et en tenant compte des
    impératifs économiques et réglementaires.
    * Participation à des appels d’offres.
    * Elaboration des cahiers des charges techniques et administratifs.
    * Sélection des entreprises de réalisation (offres technique / financière).
    * Planification du chantier (coût, délais…) et dépôt du permis de construire.
    * Suivi de production et points d’avancement réguliers avec le client.
    * Elaboration des détails techniques.
    * Suivi des travaux réalisés.
    * Vérification des attachements et situations présentés par les entreprises de réalisation.
    * Constitution des dossiers finaux et du décompte général définitifs (DGD).

    Ten months
    Architect trainee in charge of studies and follow-up, technical design office RAYANIS ENGINEERING
    (Alger)
    Projects: communal refectories, playgrounds, primary schools, crèches, single houses, office buildings, sports
    hall, fencing walls, rehabilitation of several high schools, mosque, stadiums, swimming pool.
    • Feasibility study (field study, assessment) and technical file realization.
    • Studies of building regularization files under national construction Law 08/15 of 20 July 2008 and Executive
    Decree No. 09/154 of 02 May 2009.
    • Constructions Diagnosis and preparation of expert reports.
    • Computer drawing of plans in coordination with the client as per management requirements of economic,
    timing and quality following the contract requirements.
    • Participation in tenders.
    • Preparation of technical and administrative specifications.
    • Selection of the sub-contractors (technical / financial tenders).
    • Project planning (cost, deadlines ...) and filing of the legal building permit.
    • Regular follow-up of Production progress with the customer.
    • Development and improvement technical details.
    • Follow-up of the work carried out on site.
    • Verification of the tickets and situations presented by sub-contractors.
    • Establishment of final files and final accounts (DGD).

Formations

  • Altitude Formation (Kouba, Alger) (Alger)

    Alger 2013 - 2013 Attestation

    Attestation d'aptitude au travail en hauteur (éoliennes, mats de mesure...).
  • Ecole Polytechnique D’Architecture Et D’Urbanisme (EPAU, El Harrach, Alger). (Alger)

    Alger 2004 - 2009 Ingéniorat d’état en architecture

    Diplôme d’architecture : Ingéniorat d’état en architecture (option architecture et technologie, projet:
    Hôpital mère/enfant, mention très bien).
  • Lycée Technique Mohammed Hadjres (Alger)

    Alger 2001 - 2004 Baccalaureate Degree

    Baccalauréat spécialité Génie Mécanique (Technologie).
    (Cinq maisons, Alger).

Réseau

Annuaire des membres :