Evolutec international
- Technician & instrumentation
2013 - 2013
THE SECOND PROJECT: 11/04/2012 to the End of project
Position: Engineer instrument loop test
Department: Instrument Department (COMMESSIONING)
Project: CPF (Central processing facility)
Of RHOUD NOUS (ILLIZI)
Client: Sonatrach + SNC LAVALIN
Project Subcontractor (PS): Evolutec International
Location: Skikda Industriel Zone, Cité Skikda Algérie
Duties & Responsibilities:
Loop Test off different instruments + calibration:
Transmitters: VIBRATION TEMPERATUR,PRESSURE,LEVEL,FLOW,GAS (PT,FT,TT,LT,PDT,VT) ABB,FOXBORO,ROSEMONT,YOKOGAWA
Valves:
CONTROL VALVES: MASONEILAN,FLOWSERVE,VALTEK
ON/OFF VALVES: KAMEROUN,ROTORK
SOLINOUD VALVES+ PSV + PCV + TCV + LRV + PRV
Switch’s: pressure, temperature, level, flow, vibration,
Gages: TG, PG, LG, FG, PDG
Motors : ABB
kumyang
- Coordinator & Technician & inspector
2012 - 2013
THE FIRST PROJECT: 17/03/2012 to the End of project
Position: QA/QC E&I Inspector, Coordinator, Technician loop test
Instrument Department
Project: Skikda Refinery Rehabilitation and Adaptation Project of Algeria Revamping and Refinery Modernization Works (Revamping Area)
Client: Sonatrach Activité Aval-Division Raffinage
Project Management Contractor (PMC): Engineers India Limited (EIL)
Location: Skikda Industriel Zone, Cité Skikda Algérie
Duties & Responsibilities:
Quality Assurance and Quality Control inspection for all new and reconditioned Instrument Installations & Testing from Satellite Rack Rooms to outside Structures in an Oil And Gas Plant including installation of Cable Ducts and Trays, Junction Box & Racks, Buried Cabling System, Power Distributions and Control Panel, Marshalling Cabinets, Local Control Panels, Instrument Transmitters and Impulse Lines and all Instrumentations related works, etc.
Review of QA/QC Procedures and Plans, Inspections and Test Plan, Construction Materials Bill of Quantities for site construction & inspection use related to Instrument installation works.
* Review of Standard Mounting Details, Symbols and Notes, Instrument Specification, Datasheets and Vendor approved drawings and other documentation works.
* Reads and reviews AFC drawings, Standard typical drawings and Actual Site Internal Inspection and taking Punch list items.
* Coordinate and communicate with the Client, PMC and Main Contractor's Inspectors for QS/QA/QC procedures on inspection and any other matters for inspection purposes.
* Coordinate and communicate with the site supervisors regarding preliminary inspection troubles like obstruction of piping and maintenance access and any quality matters.
* Quantity surveying of all new installed instruments and its accessories, dismantled items and Instrument Modernization.
* Quantity surveying of cable ducts, trays, airline tubing's, impulse lines and taking measurement as per actual site installation and orientations.
Responsible for trainings and supervision of Quantity Surveying and QA/QC Activities and
* Assignment of Area Location for Internal Inspection and surveying.
* Preparation of documents and attachments for inspection such as calculation and measuring sheets for quantity surveyed items.
* Preparation of Application for Inspection as per Standard Mounting Details, Process Hook-up and Inspection and Test Plans procedures and any relevant documents.
* Preparation of documents such as inspection sheets and reports for Loop Folder Compilation attachments and any related papers for project completion status.
* QA/QA inspections with client as per QA/QC procedures and Quantity Surveyed Items calculation and measuring sheets as per actual installation and orientation.
* QA/QC inspection for Testing of Cables, Pneumatic and Impulse Lines and Calibration.
* Updates of Application for Inspection status for monthly progress payment and work volume.
* Preparation of documents and attachments for loop test and leak test
* QAQC inspections for Testing, Pre-commissioning and Commissioning activities
* Loop Test off different instruments:
* Transmitters: VIBRATION / TEMPERATUR / LEVEL PRESSURE FLOW / GAS / ANALAYSER (PT,FT,TT,LT,PDT,VT,AT,GT) ABB,FOXBORO,ROSEMONT,YOKOGAWA,SEIMENS ;
* Valves:
* CONTROL VALVES: MASONEILAN,FLOWSERVE,VALTEK ;
* ON/OFF VALVES: KAMEROUN,ROTORK
* SOLINOUD VALVES + PSV + PCV + TCV + LRV + PRV