Anas Ben Khadra is a highly motivated project controls, construction & site professional, with a strong engineering background and a wide variety of skills developed over 11 years in Syria and Morocco, on large-scale construction projects (up to several $bn). Anas Ben Khadra has demonstrated his skills and knowledge in a number of high profile and challenging roles.

Entreprises

  • Eagle Hills - Program/Project Control & Scheduling

    2017 - maintenant Implement and manage the provision of professional and robust Program Control Systems within Eagle Hills that includes project services/controls and procedures to enable successful and on-time project outcomes
    - Responsibilities include, but are not limited to, the following:
     Develop and establish project control policies, guidelines and systems in line with EH Corporate standards and reporting requirements
     Implement effective controls project services to support Eagle Hills’ activities and projects
     Support the development of the Work Breakdown Structure, activities, logic, resources and progress of the integrated project schedule
     Define and agree upon effective Progress Control procedures
     Assess and review impact on Schedule and cost post project change and VO
     Keep Risk Registers up-to-date with key inputs
     Implement the project change management process
     Assure compliance with all applicable codes, legal and Eagle Hills’ specific requirements
     Ensure effective Quality Assurance standards in place
     Ensure effective QHSE standards in place
     Manage and Maintain PMO systems including but not limited to, PDMS, Primavera, EDMS, Project wise, PCM, Oracle Costing (PR’s)
     Deliver effective support services for all EH projects including estimating, cost control, forecasting and Audit
     Ensure project change management processes are adhered to
     Provide assessments of the impact of change on costs & time
     Accurate resource and cost forecasts produced
     Project Baselines established and kept up to date
     Provide input into project risk assessments
     Monitoring progress of construction work for timely execution of the project portfolio
     Monthly reports to be prepared and issue
     Monthly Project Reports to cover all aspects of the project including HSE, Planning, Cost, Risk Mgmt.
     Manage the overall Project budget & schedule, providing the Project
     Monthly dashboard reports to be prepared and issued
     Manager with analysis of cost and schedule trend information highlighting critical path and schedule risk with mitigation
     Establish, review and control schedule and costs related to the activities performed by Consultants and/or PMC

    Since its founding in 2014, Eagle Hills has realized an impressive growth plan, which has seen it enter into agreements to support the redevelopment and reinvigoration of a number of cities in Africa, Eastern Europe and the Middle East.

    As an Abu Dhabi-based private real estate investment and development company, Eagle Hills has so far achieved a number of significant milestones, with more ambitious plans to be unveiled, including the debut of several ground-breaking new projects from its operations in Serbia, Bahrain, Jordan, Morocco, Nigeria, and the United Arab Emirates.
    www.Eaglehills.com
  • Jacobs Engineering - Construction Manager

    Pasadena 2015 - 2017  Area Construction Manager for JESA (JACOBS ENGINEERING S.A) during the construction of the LYDEX Excellence / High School in the Kingdom of Morocco.
    - Responsibilities include, but are not limited to, the following:
     Develop and implement a comprehensive site safety program which stresses Jacobs Zero Incident Process.
     Conduct constructability/pre construction activities
     Ensure proper facilitation of and participate in the interactive planning session with the client
     Participate in the development of the project schedule and budget
     Develop the field indirect budget and sign off on the overall budget
     Complete the Field Project Initiation Checklist, which becomes the Mobilization Plan
     Develop, issue to the project team, and maintain the Construction Execution Plan
     Provide input to the Supply Management Plan including prioritized schedule for delivery of critical fabricated materials, and incorporate approved Supply Management Plan into the Construction Execution Plan
     Ensure Company HSE requirements are transmitted to subcontractors as part of our subcontracts
     Develop the Field Inspection and Testing Plan and incorporates it into the Construction Execution Plan, In conjunction with the QA/QC.
     Issue JVEP utilization plan as part of Construction Execution Plan
     Create a project-specific Hazard Assessment Safety Action Plan In conjunction with the HSE manager.
     Develop, issue, and maintain a Field Procedure Manual that incorporates all required project procedures
     Conduct a Construction/O&M Kickoff meeting
     Conduct meeting with organized labor and Labor Relations Manager, as appropriate Develops a filing system prior to field entry
     Establish and maintain a document control system to ensure that current revisions of drawings and specifications are at the site and in use
     Maintain the master file of both current and superseded drawings and specifications on site
     Develop in conjunction with the Planner/Scheduler the following plans:
    1- Turnover Plan when the project is 80 percent complete
    2- Demobilization Plan three months before completion
    3- Commissioning Plan when project is 50 percent complete.

    An excellence school is located in the green city Mohammed VI Benguerir, aims to promote excellence by allowing deserving young people from all social classes and regions of Morocco, monitor quality training combining technical and technological progress, language teaching, sports and personal development sessions. Mobilizing an area of 10 hectares and an investment of 360 million DH, the school of excellence will house a residential campus with an accommodation capacity of 3,000 students and will create 600 direct jobs and 200 indirect jobs.
    www.Jacobs.com Client www.ocpgroup.ma
  • Jacobs Engineering - Field Engineer

    Pasadena 2014 - 2015  Field Engineer for JESA (JACOBS ENGINEERING S.A) during the construction of the Control Building for Slurry Pipeline Project in the Kingdom of Morocco.
    - Responsibilities include, but are not limited to, the following:
     Develop and implement a comprehensive site safety program which stresses Jacobs Zero Incident Process
     Review project scope and Project Execution Strategy against proposed and negotiated budgets and schedules.
     Participate in constructability planning efforts including developing list of constructability deliverables and required construction support
     Ensure effective coordination of field services activities with the Project Manager and Lead office Project Engineer
     Manage all Field Service efforts, and ensure compliance with the Field Services procedures on all the activities
     Participate in the entire planning process including any Interactive Planning Sessions
     Work with the project manager and the project planner/scheduler during the planning phase to adjust their schedule logic to achieve project objectives
     Provide accurate progress updates and achieve the project schedule milestones
     Work with the project manager and the project planner/scheduler during the planning phase to adjust their schedule logic to achieve project objectives
     Ensure all closeout actions required are completed
     Provide field labor survey, market conditions and participate in wage rate development and productivity allowances.

    The control building is two Floors Building Located in Khouribga for managing, developing & controlling the increasing of the Phosphate production.
    www.Jacobs.com Client www.ocpgroup.ma
  • Jacobs Engineering - Field Project Control

    Pasadena 2011 - 2014  Field Project Control Engineer for JESA (JACOBS ENGINEERING S.A) during the construction of the OCP (office cherifien de phosphate) Slurry Pipeline Project in the Kingdom of Morocco.
    - Responsibilities include, but are not limited to, the following:
     Develop and updates cost and resource loaded construction schedules.
     Establish and maintain harmonious client relationship to support project delivery and client satisfaction.
     Submit monthly reports to Project Manager and support internal reports preparation.
     Supervise planning, scheduling and cost engineering.
     Maintain project personnel relationships with individual discipline group leaders.
     Determine schedule, estimates and work scope to execute and complete deliverables within budget.
     Interact with client counterparts and management to plan and schedule cost presentation.
     Develop and execute measurement systems to process, analyze and identify improvements.
     Analyze data, identify issues and recommend suitably.
     Support cost control as per contractual procedures, objectives and requirements.
     Develop cost trend estimates and new techniques to support project cost trend programs.
     Conduct investigating requirements to estimate and control cost data.
     Support administrative and organizational activities to perform cost analysis and estimation.
     Verify scope trends and estimate costs by using contract terms.
     Execute schedule change management process to approve changes

    Slurry Pipe Line is a project that will significantly reduce mine-to-port costs, and dramatically cut energy and water use, greenhouse gas emissions, and potential environmental degradation.
    The OCP Slurry Pipeline is a 457.000.000 US$ project located between Kourigba and Jorf Lasfar, that consists of approximately 240 km of pipelines including the feeder lines, Doui Pump station, MEA Head Station, Halasaa pump Station and Jorf Terminal.
    www.Jacobs.com Client www.ocpgroup.ma
  • Modern Contracting - Civil Engineer

    Casablanca 2011 - 2011  Civil Engineer for Modern contracting during the construction of the (Douja Promotion / Groupe Addoha) projects.
    - Responsibilities include, but are not limited to, the following:
     Undertaking technical and feasibility studies and site investigations;
     Developing detailed designs;
     Assessing the potential risks of specific projects, as well as undertaking risk management in specialist roles;
     Supervising tendering procedures and putting together proposals;
     managing, supervising and visiting contractors on site and advising on civil engineering issues;
     Overseeing the work of junior staff or mentoring civil engineers throughout the charter ship process;
     Communicating and liaising effectively with colleagues and architects, subcontractors, contracting civil engineers, consultants, co-workers and clients;
     managing budgets and other project resources;
     managing change, as the client may change their mind about the design, and ensuring relevant parties are notified of changes in the project;
     compiling, checking and approving reports;
     reviewing and approving project drawings;
     using computer-aided design (CAD) packages for designing projects;
     undertaking complex and repetitive calculations;
     scheduling material and equipment purchases and delivery;
     attending public meetings to discuss projects
     adopting all relevant requirements around issues such as building permits, environmental regulations, sanitary design, good manufacturing practices and safety on all work assignments;
     ensuring that a project runs smoothly and that the structure is completed on time and within budget;
     correcting any project deficiencies that affect production, quality and safety requirements before final evaluation and project reviews

    Riad Al Andalous Project in the Kingdom of Morocco; a project that provided one million square meters of high standing apartments in Rabat with 660.000.000 US$ cost.
    Annahda Project FB Project in the Kingdom of Morocco; a project that provided 318 mid standing apartments in Casablanca with 12.000.000 US$ cost
    www.modern-cco.com Client www.groupeaddoha.com
  • Lacasa Architectural Consultants - Control Engineer

    2010 - 2011  Control Engineer for Lacasa Architectural Consultants during the construction of the EMAAR-Invest Group Overseas “Eighth Gate” in SYRIA;
    - Responsibilities include, but are not limited to, the following:
     Prepare, schedule, coordinate and monitor the assigned engineering projects
     Monitor compliance to applicable codes, practices, QA/QC policies, performance standards and specifications
     Interact daily with the clients to interpret their needs and requirements and represent them in the field
     Perform overall quality control of the work (budget, schedule, plans, personnel’s performance) and report regularly on project status
     Assign responsibilities and mentor project team
     Cooperate and communicate effectively with project manager and other project
     participants to provide assistance and technical support
     Review engineering deliverables and initiate appropriate corrective actions

    Eighth Gate Project: Spanning an area of over 300,000 sq meters, The Eighth Gate is a one billion dollar project and a thriving commercial hub that promotes entrepreneurship, a financial nerve centre that supports growth, a tourist destination that powers the economy and a residential getaway for connoisseurs.
    www.Lacasa.ae Client www.emaar.com www.8thgate.sy
  • KHAYYAT Contracting & Trading - Civil Engineer

    2009 - 2010  Civil Engineer for KHAYYAT Contracting & Trading during the construction of Syrian Metal Industry “SMI“
    - Responsibilities include, but are not limited to, the following:
     provide engineering support for projects in various stages of design, estimating and construction
     Assist Estimators with analysis of proposal specifications and Drawings to determine scope of work and required contents of estimate
     Assist Estimators by calculating complete takeoff of scope of work
     Review and incorporate historical data from purchase orders, subcontracts, productivity analysis reports, etc. into unit and man-hour figures
     Assist in preparation of bid packages
     Assist Project Managers with the preparation and maintenance of construction schedules
     Maintain construction files and logs
     Receive, review, forward and track status of submittals and Change orders
     Initiate, prepare, review, track and distribute RFIs
     Update construction schedule based on project team Input
     Track and inspect material deliveries
     Assist in preparation of monthly owner project status reports
     Attend project meetings and record meeting minutes
     Assist in project close-out

    SMI Project: A project in Damascus country side at Adra Industrial City, about 53 kms away from the center of Damascus over a total area of 245,000 square meter. The total area is divided over 3 lots of land, the first was dedicated for the scrap yard and the administration building, the second was dedicated for the melt shop, auxiliary plants and rolling mill, the third was dedicated for the power generation plant.
    www.khayyat-qa.com Client www.smi-sy.com

Formations

  • Damascus University (Damascus)

    Damascus 2003 - 2009 civil engineering