Montigny-le-Bretonneux2006 - maintenantSept. 08 - Present: FSRU Livorno Project - OLT - Italy
(Milano Home Office - Dubai Shipyard)
Conversion of a LNG carrier into the first LNG Floating Storage & Regasification Unit permanently moored offshore.
Main tasks:
- Development of general commissioning procedures, system package procedures
- System leader of process equipment
- Review of engineering & vendor documentation
- Support to Construction Dpt
Feb. 07 - Aug. 08: Zeebrugge LNG Terminal Extension - Fluxys - Belgium
The extension includes new regasification facilities ( 900 000 Nm3/h) and new LNG tank (140 000m3)
Main activities:
- System Leader of Packages ( EDG, Cranes, LNG low pressure pump, Compressor, foam)
- Assistance during start-up (cool-down)
- Punch list clearance
Jan. 06 - Jan. 07: DHC / OSBL - TOTAL - France
Integration of the new DHC unit within the existing refinery.
In charge of:
- Commissioning/start-up/performance tests of a water demineralization plant
- Commissioning of retention basin, pumps
- Interface with refinery and sub-contractors