Menu

Bassel CHEBBO

PARIS

En résumé

A multi-skilled professional, with over 9 years of invaluable experience in managing projects, recourses, planning and staff; Highly focused with a comprehensive knowledge and understanding of various industries and sectors. I am an easy going individual who enjoys challenging, diverse roles and is confident working with technical experts from industry.
Currently looking for a management position that offers variety and the opportunity to develop both personally and professionally

Mes compétences :
Gestion de projet
Qualité
TPM
Production industrielle
GANTT Project
Manager
PERT
Maintenance industrielle
Catia v5
Industrie automobile
Coordination de projet
Gestion d'équipes
Conception mécanique
Ms project
Planification
Process
WBS
5s / TPM
Amélioration continue
Primavera
Project management
Planning
International
Maintenance
Production
Industrialisation
Primavera P6

Entreprises

  • SOFINEL (EDF & AREVA) - Planning Engineer

    2014 - 2016 Within UK project (EPR UK):
    - Develop and manage engineering and procurement level 3 schedules using primavera P6
  • ITER (International Thermonuclear Experimental Reactor) - Planning Engineer

    2013 - 2014 Within the maintenance section of assembly & operations division:
    - Develop and manage detailed schedules using Primavera for various projects & their different stages (Engineering, Procurement, Assembly & Construction, Commissioning, Operations)
    - Establish a procurement schedule identifying all the different milestones of the tender process
    - Update projects schedules, monitor actual progress and compare the updates with the baseline
    - Analyze project schedule issues and propose corrective actions for timely completion of the project
    - Analyze interfaces and critical dependencies between ITER and contractors schedules
    - Review and analyze the schedules submitted by other parties contributing to the project
    - Identify the critical path within the schedules
    - Interface the schedule with the project budget and resource load it with labor and material resources based on the project approved budget
    - Analyze productivity, trends & forecasts; update their impact on the schedule, project budget & cost
    - Prepare the schedules analysis for inclusion into the monthly project progress report
    - Maintain and report on schedule data to help the Technical Responsible Officers achieve their objectives on time and within specified cost, quality and performance parameters
    - Evaluate and report schedule issues, risks and opportunities to top Management
    - Provide management with monthly updated progress report including workforce histograms and Bar charts for each project, also highlighting deviations from contractors planning (baseline plan)
  • Pikasso - Technical Manager (Installation of billboards)

    2012 - 2012 Within the Installation department:
    - Managed a technical team (12 engineers and 18 technicians), performed the weekly work plan
    - Managed the installation and the dismantling of billboards using a MS-Project schedule
    - Created technical drawings and drafted the specifications of the billboards structure (Dimensions and properties of the steel section like: beams, columns, tubes, angles; steel hollow sections…)
    - Established the projects budgets of installation and estimated the operations costs
    - Developed the monthly indicators dashboard and presenting it to the CEO
    - Managed the stock movements of the warehouses (inventory management)
    - Supervised the manufacturing and shipment of panels
    - Established and monitored the maintenance program
    - Realized training of staff and new arrivals
  • PSA Peugeot Citroën - Project Management & Planning Engineer

    Rueil Malmaison 2008 - 2011 Within the department of Motor Development:
    - Developed and managed project schedules using MS-Project (Production schedule, motor testing schedule and motor parts schedule “parts like: connector, valves, piston, cylinder…”)
    - Monitored progress of project deliverables, motor assembly and parts delivery
    - Recommended schedule optimization and reported of progress
    - Defined and planned weekly and monthly rituals steering deliverables / resources
    - Tracked the industrialization of motor parts from design phase to manufacturing phase
    - Presented the schedule to the project team in the weekly meeting

    In collaboration with project stakeholders, I developed a project repository
    - Established a typical schedule (2200 tasks) for a motor development project using MS-Project “stages: Technical engineering, industrialization, manufacturing organization”
    - Developed project procedures and project management standards for conception group manager
    - Published of procedures and the standards in a website using TYPO 3 (Software to build websites)
    - Updated a database of procedures for project manager (database structured according to the CMMI ‘Capability Maturity Model Integration’: is a process improvement approach)
    - Defined Planning & Scheduling methodologies and procedures
    - Implemented scheduling procedures with each management / discipline
    - Driven implementation of planning and scheduling procedures to insure execution of scheduling Best Practice

    Within the department of Automobile Assembly Process:
    - Developed a standard schedule for assembly projects
    - Established and implemented work procedures
    - Defined project indicators and created dashboards
    - Installed a visual management unit for the team assembly of Russia Project
  • Autoliv - Process Industrialization Engineer

    Cergy 2007 - 2007 Within the Process Engineering Industrialization service in the manufacturing firm of airbag:
    - Managed a project of design and modification of automated manufacturing equipment (8 workstations: filling, weighing, crimping, control, vibratory bowl feeders, procurement)
    - Designed a product (cylinder closed by crimping with a charging case) / FMEA method
    - Elaborated equipment lay-out, assembly Process flow, and the equipment technical specifications
    - Designed and purchased the mechanical and electrical parts (Hydraulic cylinder, Sensor, Valve…)
    - Developed and implemented the new workstations
  • FAURECIA Emissions Control Technologies - Maintenance Engineer

    Bavans 2005 - 2006 Within the production service in the manufacturing firm of automotive seating:
    - Implemented of TPM method (Total Productive Maintenance) on two manufacturing lines
    - Identified the machines by using CMMS (Computerized Maintenance Management System)
    - Performed measures (“Pareto distribution”, OEE “Overall Equipment Effectiveness”)
    - Analyzed dysfunctions and identified of the breakdowns (Robot, Hydraulic press, welding…)
    - Implemented preventive and corrective actions and managed spare parts
    - Trained manufacturing operators

Formations

Réseau

Annuaire des membres :