Menu

Bouabdallah BOUSSAHELA

MOSTAGANEM

En résumé

PERSONAL DETAILS

First name : BOUSSAHELA

Family name : Bouabdellah

Nationality : Algerian

Marital status : Married

D.O.B : 29/09/1964

Adress : Hai Adda benaouda sidi m’hamed Benali
-w- Relizane 48003 Algérie


Mobile : 00 213 06 61 42 11 58

E-mail : boussahela@yahoo.fr


EDUCATION AND TRAINING

• Secondary school
• TECHNICAL DIPLOMA (oil and gas) option EXPLOITATION and PROCESS
TRAINING
• HSE periodically according to the schedule of HSE department
• DCS fox:B
• Attended some courses :compressors; pumps; etc
Programme implemented by the company to have knowledge about
The new technology
• PTW COURSE
• First aid certificate
• Safety driving.
• LANGUAGES

• English : Professional
• French : Fluent
• Arabic ; Native















WORK EXPERIENCES
February2017 at now
SUPERVISOR IN ABB COMPANY

I worked in ABB company as a supervisor pre-commissioning and commissioning in
pumping GPL plant (water treatment, fire water, pumps , leak test).
I have worked a panel operator for start-up of the GPL plant (DCS ABB system)
I work as a shift supervisor of the GPL pumping plant .

I have 29 years of experience in Sonatrach company of petroleum

2010-2016
SHIFT SUPERVISOR REFINERY

Supervise the plant
Unit: Topping Crude oil distillation
Trouble shouting ;optimizing the production;and keep the safe running of the unit:
Checking the analysis of products such as Diesel ;Kerosene and Naphta
Unit :Reforming
1-Monitoring the catalyst reactions
2-monitoring the well running of hydrogen recip: compressor
3- the centrifugal pumps (15 impellers)

, identify the abnormalities and take action by notifications to Issue the PTW with RA and isolation certificate



2006-2010 CONTROL ROOM OPRATOR


1- Monitor the all parameters (level ,temperature ,pressure and the flow) to avoid any PSD
2- Immediate reaction during the PSD or ESD.
3- Adjust the parameters of products to be on-spec by checking the result of analyses.( lab ).
4-Immediat reaction to avoid any PSD


1991-1995 SENIOR OPERATOR & ACT PANEL OPERATOR REFINERY

Immediate reaction during the PSD or ESD.

1987-1990- OPERATOR AND SENIOR OPERATOR REFINERY


Under the supervision of shutdown coordinator I was a member of shutdown team:
so familiar with
Blinding; De-blinding; GALT( leak test) and start up of the plant.

Entreprises

  • ABB Company - Process shift supervisor

    2017 - maintenant

Formations

Pas de formation renseignée

Réseau

Pas de contact professionnel

Annuaire des membres :