Field services with Cameron:
1- Installation and maintenance of
- Hydraulic Power Units
- Wellhead Control Panels (safety control systems, pneumatic and hydraulic).
- Gas Turbine and Pressure Equipment.
2- Conventional jobs: Installation of:
_ 20.3/4”casing head housing.
_ 13.5/8”nom.SSMC 2 stage compact housing, complete with annulus equipment.
_ 13.5/8”nom.3 stage compact housing.
_ 10.3/4”casing hanger (Slip type and Mandrel Type).
_ the casing hanger seal assembly.
_ tubing hanger ( HT Tubing Hanger , HT -2 Tubing Hanger , CXS Tubing Hanger , CT Tubing Hanger , HP –TLC Tubing Hanger , T-Neck Tubing Hanger , C-SRL Tubing Hanger , MTBS-SRL Tubing Hanger , CD-T-CL Tubing Hanger ) .
_ Installation of casing spools (S casing spool and IC casing spool).
_ Tubing spools (C Tubing Spool, CD -2 Tubing Spool, MTBS Tubing Spool).
3- Emergency jobs: Installation of:
_ 20”nom.emergency lowermost housing.
_ 13.3/8”emergency slips lock connector.
_ 9.5/8”emergency slip bowl assembly.
_ 9.5/8” emergency seal assembly (13”5/8 nom.emergency seal assembly to suit 9.5/8” casing.
In the workshop:
_ Maintenance of BOP, annular BOP, single BOP and double BOP (changing all the seals, the shear rams and the packing units) and testing the BOP.
_ Maintenance of the Gate Valves (FL and FLS Manual Valves), the Ball Valves, the MH and MHW actuators, The General Twin Seal Valves , The Grove Ball Valves(B4,B5 and B7 Side Entry Ball Valves )
_ Maintenance of the lubricators, the back pressure valves (BPV) and the two way check valves (TWCV).
Pas de formation renseignée