Experiance in:
-pre-commissioning/Commissioning (Completion Engineer)
-Warranty period
-Project control Planning - Risk& opportunities Engineer

after this view of the life of a project looking for the Next step.
Speak: English, french, Arabic, italien

Mes compétences :
Completion
Planning
Risk and opportunities management
Pre-commissioning/ commissioning
Punch list coordination
Construction
Mechanical Completion
opportunities Management
Procurement
Opportunities Knowledge Management
Onshore Oil & Gas
Natural Gas
Joint Venture
Invoicing
Construction site
Planification

Entreprises

  • Saipem - Risk engineer

    Montigny-le-Bretonneux maintenant
  • Saipem - System completion coordinator

    Montigny-le-Bretonneux 2015 - maintenant * follow the outstanding construction for internal handover between construction and ;
    * commissioning ;
    * organize the official walkthrough with the client when the subsystem is safe and accessible for walkthrough
    * participating with the punch list committee for categorization ensuring the input of the punch list with the data entry inside the data base
    * organize the punch list review by subsystem by commissioning priority with different discipline for resolution
    * daily report of punch list productivity resolution and weekly report
    * Interface between Engineering, Construction, and Commissioning.
    * Advise construction supervisors, and subcontractors regarding plans based on target milestone and schedule.
    * Ensure all erection checks are completed and all documentation to obtain Mechanical Completion Certificate (MCC) final documentation and handover packages are in place.
    * Status reporting of construction progress as required by the project.
    * Handling completions processes performing construction operations making systems ready for Start Up and commissioning.
  • Saipem - Pre-commissioning supervisor

    Montigny-le-Bretonneux 2013 - 2014 Project Overview:
    Representing an investment of $2.5 billion, Sunrise Phase 1 is a complete EPC project for a central plant and field facilities which are expected to produce about 60,000 barrels per day.

    Role, Work Location: Completion Lead / Pre-commissioning supervisor

    Responsibilities:
    * Preparation of all procedure of blowing by system. ;
    * Performing blowing.
    * Start and test run of the pumps ;
    * organize all walkthrough by subsystem wise with construction and quality team and ;
    * pre- commissioning ;
    * follow the outstanding construction for internal handover between construction and ;
    * commissioning ;
    * organize the official walkthrough with the client when the subsystem is safe and ;
    * accessible for walkthrough ;
    * participating with the punch list committee for categorization ensuring the input of the punch list with the data entry inside the data base
    * organize the punch list review by subsystem by commissioning priority with different
    * discipline for resolution ;
    * daily report of punch list productivity resolution and weekly report
    * Interface between Engineering, Construction, and Commissioning.
    * Advise construction supervisors, and subcontractors regarding plans based on target milestone and schedule.
    * Ensure all erection checks are completed and all documentation to obtain Mechanical Completion Certificate (MCC) final documentation and handover packages are in place.
    * Status reporting of construction progress as required by the project.
    * Handling completions processes performing construction operations making systems ready for Start Up and commissioning.
  • saipem - Commissioning supervisor

    Montigny-le-Bretonneux 2012 - 2013 Saipem MLE: ENI/Sonatrach Hassi Messaoud - Algeria
    Project Overview:
    SH-FCP (owned by ENI) - MLE project - Algeria
    Project for natural gas collecting and treatment centre, including the relative pipeline for exporting the gas, with a total production of 9.0 M std m3/day of gas, 14,000 bbl/day of LPG, 10,000 bbl/day of condensate and 8,350 bbl/day of oil. The MLE project includes mainly 24 oil/gas wells, 6 gas gathering Manifolds; a Central Processing Facility (CPF), including pumping system, associated utilities and 4 export pipelines for sales gas, LPG, condensate and oil (overall 550 km).
    Attend commissioning operation to coordinate and support to start-up the plan

    Role, Work Location: Commissioning operator / Mechanical completion coordinator (Punch list), MLE: Hassi Messaoud

    Responsibilities:
    * Commissioning and put In service the Amine ( CO2 Removal system) ;
    * Start and test run of the pumps ;
    * Isolate and prepare process units or production equipment for commissioning including the preparation of the Permit To Work (PTW) and all relative documents and certificates
    * DCS board operator during stabilization of the plant:
    * organize all walkthrough by subsystem wise with construction and quality team and ;
    * pre- commissioning ;
    * follow the outstanding construction for internal handover between construction and ;
    * commissioning ;
    * organize the official walkthrough with the client when the subsystem is safe and ;
    * accessible for walkthrough ;
    * participating with the punch list committee for categorization ensuring the input of the punch list with the data entry inside the data base
    * organize the punch list review by subsystem by commissioning priority with different
    * discipline for resolution ;
    * daily report of punch list productivity resolution and weekly report
    * Interface between Engineering, Construction, and Commissioning.
    * Advise construction supervisors, and subcontractors regarding plans based on target milestone and schedule.
    * Ensure all erection checks are completed and all documentation to obtain Mechanical Completion Certificate (MCC) final documentation and handover packages are in place.
    * Status reporting of construction progress as required by the project.
    * Handling completions processes performing construction operations making systems ready for Start Up and commissioning.
  • saipem - DCS operator

    Montigny-le-Bretonneux 2011 - 2012 Project Overview: The BS-160 (EPC Contract amounted to 450 Ml EUR ) consists of the construction in 36 months of a new Booster Station and associated pipelines in South Eastern Kuwait for Kuwait Oil Company (K.S.C.), which forms part of a major programme to increase the Kuwaiti production capacity.
    BS-160 is composed of a gas handling station for the compression and dehydration of gas gathered through pipelines and final export at dew point of Mina Al-Ahmadi refinery through 36'',and 10'' pipelines.

    Role, Work Location: Mechanical completion coordinator /DCS operator

    Responsibilities:

    * DCS board operator during stabilization of the plant ;
    * organize all walkthrough by subsystem wise with construction and quality team and pre- commissioning
    * follow the outstanding construction for internal handover between construction and
    * commissioning ;
    * organize the official walkthrough with the client when the subsystem is safe and accessible for walkthrough
    * participating with the punch list committee for categorization ensuring the input of the punch list with the data entry inside the data base
    * organize the punch list review by subsystem by commissioning priority with different discipline for resolution
    * daily report of punch list productivity resolution and weekly report
    * Interface between Engineering, Construction, and Commissioning.
    * Advise construction supervisors, and subcontractors regarding plans based on target milestone and schedule.
    * Ensure all erection checks are completed and all documentation to obtain Mechanical Completion Certificate (MCC) final documentation and handover packages are in place.
    * Status reporting of construction progress as required by the project.
    * Handling completions processes performing construction operations making systems ready for Start Up and commissioning.
    * Attend commissioning operation to coordinate and support to start-up the plant
  • Saipem - Engineer

    Montigny-le-Bretonneux 2009 - 2011 Project Overview:
    EPC contract for the LDHP project total value of approximately $500 million. within the framework of the LPG-LDHP initiative, at the Hassi Messaoud complex in central Algeria, 900km south east of Algiers.
    The LDHP project an oil-gas separation plant and a gathering system made up of manifolds and pipelines for a total length of approximately 140 kilometres. The project

    Role, Work Location: Planning/Risk & opportunities Engineer

    Responsibilities:
    * Risk and opportunities Management (brainstorming, updating risk register. Following with the risks owners the mitigation action) working under the responsibility and guidance of Project Manager.
    * Updating the PSR (Project status report Risk & opportunities part on Monthly bases).
    * Planning activities (update the planning for construction phase).
    * Reporting activities (weekly and monthly analysing progress & feasibilities by discipline).
    * Following subcontractors planning. ;
  • Saipem - Risk and Opportunities Engineer

    Montigny-le-Bretonneux 2008 - 2009 Sonatrach Algeria (Milan & Arzew)


    Project Overview: LNG liquefaction train. The onshore contract is worth EUR 2.8bn

    Role, Work Location:

    Responsibilities: Risk and Opportunities Engineer

    * 3 months trainings in Milan:
    * Risk and Opportunities Knowledge Management. ;
    * Primavera 3 course ;
    * weekly and monthly reporting (Engineering& Procurement phase) ;
    * Risk engineer and reporting (Arzew)
    * Brainstorming - Updating Risk Register ;
    * Reporting: Construction Site weekly report. ;
    * Follow subcontractors invoicing (subcontract department duty ;
  • Saipem - Punch-list coordinator

    Montigny-le-Bretonneux 2007 - 2008 Saipem: SNC-Lavalin/ Saipem JV Aramco Khurais WIPS Project- Kingdom of Saudi Arabia



    Role, Work Location: Ain Dar Saoudi Arabia
    Responsibilities: Handover/ Punch-list coordinator

    * Interphase with Client construction, pre-commissioning teams and subcontractors to prioritize the punch list for clearance according to schedule & scope of work.
    * Maintain daily walkthrough and meetings to follow up the punch list clearance
    * Follow up pre-commissioning activities by subsystem using Neptune access data base
    * Preparing all pre-commissioning completion dossier by PMCC (partial mechanical completion certificate)
    * Collect the pre-commissioning test results , all vendors reports and mark up drawings needed for mechanical completion
  • Saipem ROD Project Hassi Messaoud - Site represenatative

    2004 - 2007 Saipem ROD Project Hassi Messaoud - Sonatrach Algeria

Formations

  • ISMAD (Alger)

    Alger 1999 - 2001 Commercial Engineer Marketing

    Institut superieur de Mangement et Developement
  • ISMAD (Alger)

    Alger 1999 - 2001 Commercial Engineer Accounting and Finance

    Institut de management et developement
  • USTHB tronc commun (Alger)

    Alger 1997 - 2001 Technologie
  • UNIVERSITY OF SCIENCES AND TECHNOLOGY HOUARI (Alger)

    Alger 1997 - 2001 (Technologies). UNIVERSITY OF SCIENCES AND TECHNOLOGY HOUARI BOUMEDIENE Bab Ezzouar Algeria ;

Réseau

Annuaire des membres :