Foster Wheeler
- Lead Control Systems Engineer
Paris
2013 - maintenant
North East Engineering Centre
- Responsible for a team of Engineers preparing detailed design associated with brownfield projects on behalf of Fairfield Engineering Limited on the Dunlin Alpha offshore platform. Projects have included installation of ESP (Electric Submersible Pumps) and all associated DCS/ESD modifications required for new flowline instrumentation, preparation of Purchase requisitions and detailed Wokpacks for installation and commissioning activities.
Control Systems Engineer - Currently assigned to Hole House 3 EDF Gas Storage facility located in Cheshire, assisting site base team in the start-up and commissioning activities associated with the above. Duties include implementation of Instrument design change notifications, sequence and trip testing, SIL validation and performance testing of Siemens PCS 7 control system, MANN Turbo HOFIM gas compressor and ancillary devices.
-
Amec Foster Wheeler (formerly AMEC Europe) – North East Engineering Centre
- Lead Control Systems Engineer
2013 - maintenant
Lead Control Systems Engineer - Responsible for a team of Engineers preparing detailed design associated with brownfield projects on behalf of Fairfield Engineering Limited on the Dunlin Alpha offshore platform. Projects have included installation of ESP (Electric Submersible Pumps) and all associated DCS/ESD modifications required for new flowline instrumentation, preparation of Purchase requisitions and detailed Wokpacks for installation and commissioning activities.
Control Systems Engineer – Currently assigned to Hole House 3 EDF Gas Storage facility located in Cheshire, assisting site base team in the start-up and commissioning activities associated with the above. Duties include implementation of Instrument design change notifications, sequence and trip testing, SIL validation and performance testing of Siemens PCS 7 control system, MANN Turbo HOFIM gas compressor and ancillary devices.
-
Wood Group
- Principle Instrument Engineer
2013 - 2013
Assigned to Conoco Phillips North Valiant platform foam injection project based in Dyce Aberdeen offices, duties included preparation of skid mounted instrument specifications and purchasing documentation.
AMEC Europe
-
Amec
- Control Systems Engineer
Londres
2006 - 2013
assigned to the BP Terminals Projects. Primarily responsible for the specification of a number of Emerson DeltaV control systems to be installed on BP Terminals around the country, the systems comprise conventional I/O and serial links with existing Emerson SIS systems and various existing PLC packages. Architectures are both integrated with existing systems and stand alone as required by the various Terminals.
Lead Instrument Engineer - Responsible for a team of Engineers in the preparation of the control system input to a FEED Study in a UKCCS Demonstration Competition. Activities included preparation of User Requirement Specifications for all control system equipment, DCS, Fire and Gas, ESD systems and metering skids complete with gas analysis. Attending various HAZOP and CHAZOP meetings and compiling system costs for the final FEED report.
Completed AMEC internal CCS project training and induction, and certified as a competent/SQEP (Suitable Qualified and Experienced Person) for National Grid CCS projects. This training is developed by AMEC to raise competency and awareness levels of CCS and part of a tailored package of training sessions and required reading material. The training programme is compliant and exceeds the demonstration of competency in CCS required by National Grid for CCS projects.
Lead Instrument Engineer - Responsible for all detailed design associated with the control and protection systems for the Milford Energy Co-Generation plant located in Wales. Systems include Emerson Delta V distributed control system, HIMA Sella HiQuad TMR shutdown system, Emerson SIS fire and gas system.
System architecture including extensive fibre optic network to provide remote redundant primary and secondary data highways. Specification and purchase of all field instrumentation and serial interfaces with vendor's packages.
Invista PTA Projects Wilton Centre
-
HIMA
- Senior Instrument Engineer
2005 - 2006
Responsible for the control system specification, to include DCS complex loops, HIMA software driven ESD shutdown logic configuration for a PTA plant FEED to be built and commissioned in China. Responsibilities included preparation of a three week training programme in Shanghai for the Chinese engineers on the commissioning and start-up of PTA plants.
-
DuPont
- Senior Instrument Engineer
2004 - 2005
Responsible for the commissioning and start-up of a PTA plant in Thailand, activities included three months pre-commissioning checks and start up assistance followed by three week performance testing prior to issue of client's acceptance certificate.
Day and Zimmerman Wilton Site
-
Invista KA
- Lead Instrument Engineer
2002 - 2004
Responsible for the re-instrumentation aspect of the Invista KA plant refurbishment, activities included specification and purchase of all field instrumentation, production of all design documentation and detail scopes of work required to effect installation. Following completion and issue of design a further three months on site to resolve design issues and respond to site technical queries.
Invista PTA Projects Wilton Centre
-
Wilton Centre
- Senior Instrument Engineer
2000 - 2002
Invista PTA Projects
- Responsible for the control system specification, to include DCS complex loops, Triconex software driven ESD shutdown logic configuration for two PTA plant FEEDs, one situated in India and one in China. Responsibilities included attending design authorities premises to review vendor's proposals and attending DCS and ESD factory acceptance tests.
-
Union Carbide Limited
- Lead Instrument Engineer
1998 - 2002
For an instrument refurbishment and upgrade exercise on the EOD plant. Responsibilities included design and specification of all field instrumentation and associated design documentation, specification and configuration of an existing Triconex TMR software driven shutdown system. Final start up and commissioning and resolving site technical queries.
K Home Engineering Thornaby
-
mw kelogg
- Instrument Engineer & Lead Instrument Engineer
1993 - 1998
For a variety of projects covering all aspects of detailed design engineering, site surveys and preparation of budget estimates to include manhour and material costs.
MW Kellogg Limited,
-
mw kellogg
- Commissioning Engineer
1992 - 1993
Assigned to Gemlik Ammonia Plant, Turkey. Responsible for a Supervisor and a team of Technicians during the start-up and commissioning and subsequent performance test.
King Wilkinson Middlesbrough
-
Enron
- Instrument Designer - Working
1991 - 1992
as part of a team on the Naphtha feed to Enron power station Gas Turbines. Responsibilities included preparation of instrument data sheets, loop sheets and general design documentation.
MW Kellogg, London
-
the Texaco
- Instrument Designer
1990 - 1991
Responsible for preparation of data sheets, vessel sketches, installation hook ups for the Texaco Isomerisation project located in
-
mw kellogg
- Commissioning Engineer & Instrument Superintendent
1987 - 1990
Responsible for a supervisor and a team of Instrument Technicians effecting the commissioning and start-up of the NAFCON fertilizer complex located in Nigeria.
-
mw kellogg
- Commissioning Supervisor
1985 - 1987
Responsible for a team of Instrument Technicians on the commissioning and start-up of a refurbished LNG complex located in Oran Algeria.
-
mw kellogg
- Commissioning Supervisor
1984 - 1985
Responsible for a team of Instrument Technicians on the commissioning and start-up of a refurbished and overhauled LNG plant located on DAS Island in the Persian Gulf, responsibilities included removal and reinstallation of existing equipment following recalibration and refurbishment.
-
mw kellogg
- Commissioning Supervisor
1983 - 1984
Responsible for a team of Instrument Technicians on the commissioning and start-up of a refurbished oil refinery located in Mauritania West Africa.
-
Haigh and Ringrose
- Instrument Inspector
1981 - 1983
Responsible for the acceptance of all control systems and field instrumentation for eight coal fired boilers producing steam for power generation within the SASOL oil refinery located in South Africa.
MW Kellogg London
-
mw kellogg
- Instrument Supervisor
1979 - 1981
Responsible for a team of Instrument Technicians on the commissioning and start-up of two LNG trains in Skikda Algeria, responsibilities included commissioning of boilers and steam driven turbine compressor packages along with LNG storage facilities.
Philips Petroleum Seal Sands
-
NOC
- Instrument Technician - Working
1978 - 1979
as part of a team involved in the commissioning and start-up of a NGL plant including storage facilities and offsite utilities installations.
National Oil Company Libya
-
National Oil Company
- Instrument Technician - Working
1977 - 1978
as part of a team on the commissioning and start-up of an Ammonia plant situated in Marsa El Brega.
-
ICI
- APPRENTICE
CHAMBRAY LES TOURS
1972 - 1977
Instrument Apprenticeship - Followed by one year post experience on the Nitric Acid plants at products works.
-
engineer
- Control systems
1954 - maintenant