-
DJEZZY Telecom
- Optical fiber deployment engineer
2018 - maintenant
Ensure the technical visits and report to back office about the optimized link itinerary
- Technical sites problems resolution and assist the Subcontractors to do the work in accordance
of Quality/Safety
- Working closely with the enterprise during all the project phases such (opening of the trench,
laying the pipe, pulling the cable, as well as all the connections and testing commissioning) till
sites delivery
- Validation of work done, as-built as well as all the required documents
-
HAMTON International
- Project Manager / General manager
2014 - 2018
: ( 100 & 33 & 214/villas projects -School
- shops project ..etc)
/100 villas project : the project Progress was at 20% the time of my nomination,
the progress is remounted to 60% 6 months later
- Pushing & follow up the site staff for work progress as per the project schedule, contract
documents, drawings and specifications
- Looking after the project estimation and control the project cost
- Following up with the Store & purchasing team regarding the required material in order to be
delivered on time on site
* Executive projects manager:
- Follow up with all project mangers about the projects progress as per the project schedule,
estimated budget purchasing
- Visiting the projects to resolve eventual technical problems or construction management
- Attending meetings with clients to assist the project manager when it's required
* General Manager:
- Manage and coordinate a different departments such as human resources, Accounting/Finances,
Procurement and projects team
- Ensure à flow progress of projects with collaboration of all the managers respecting the planned
objectives (quality / cost / delay)
- Fixing and follow up the annual cash flow after consultation and approval by all the concerned
departments
-
ORASCOM Telecom
- Optical fiber deployment engineer
PARIS
2014 - 2014
* Optical fiber installations Supervisor:
- Ensure the technical visits and report to back office about the optimized link itinerary
- Technical sites problems resolution and assist the Subcontractors to do the work in accordance
of Quality/Safty
- Working closely with the enterprise during all the project phases such (opening of the trench,
laying the pipe, pulling the cable, as well as all the connections and testing commissioning) till
sites delivery
- Validation of work done, as-built as well as all the required documents
-
ABB Germany
- Coordinator Engineer
2012 - 2013
* Coordinator Engineer - Constantine, bejaia & skikda :
- Supervision of Civil works Subcontractors and ensuring the coordination with the back office and
all government institutions to achieve the planned targets in full respect of the Quality/Delay
- Validation of Works done, variations and the monthly invoices
- Validation of all the documents; SA3, APD, As-Built
-
ERICSSON
- Implementation Manager / Transmission Dept
MASSY
2011 - 2012
: 3G Swap Project Mobilis
: Swapping from dual band to triband antennas
- Planning and Coordinating TSS for transmission modernization
- Ensuring all necessary authorizations to provide the flow access to sites for the quick delivery of
the equipments
- Coordination with Supervisors/Subcontractors to succeed the equipments Swapping/installations as per the approved plan and customer standard
- Validation of Works done and the monthly invoices
- Weekly meeting with the Subcontractors / client to solve the blocking points
- Keeping the Work progress status updated to facilitate the balance planning of the program
-
ABB Services g.m.b.h
- Civil Works Coordinator Engineer
2010 - 2011
# ABB Services g.m.b.h/ may 2010- july 2011 : BCC Project Telecom-sde Constantine Algeria (1000 Sites)
- Supervision of UHFD Sites installations
- Keeping the Work progress status updated to facilitate the planning of the rest of the program
(1000 sites)
- Coordination with the government authorities such SNG,CTC, and office consultancy office to
resolve all technical issues
-
ALCATEL LUCENT Egypt
- Civil Works Engineer
2008 - 2009
Assist the engineers radio / trans while the technical visits to identify the bests candidates for the future installations
- Supervision of Civil work subcontractors (Green field and rooftop) in full respect of Quality/Delay
- Keeping the back office updated on the work progress
-
TELECO / Owner
- Propriétaire
2005 - 2008
Construction of several sites Greenfield & Towers for both operators (Mobilis, Wataniya)
- Construction of 25 sites towers for SNEF/ CCTV project, industrial area Oran
- Participating in a Renovation Program of CASBAH
-
HAYATCOM Telecom
- Chef de projet
2005 - 2005
* Project Manager: Mobilis Project deployment 500k / 2000k
- Working closely with the client; Weekly update on work progress to anticipate and solve the
eventual blocking points
- Planning of new sites kick off and ensuring the stock with the necessary materials and equipments
and ensuring also the sites access
- Monitoring the acquisition/engineering departments for the preparation of technical documents
- Assist the Supervisors / Subcontractors to push the work progress
- Validation of Works done and the monthly invoices
- Ensure and keeping the respect of Safety/Quality as priority
-
WATANSERVE Telecom
- Responsable construction
2004 - 2004
* Construction Responsible: Mobilis Project deployment 500k
- Attend meetings and keeping the client updated about the works progress status on sites also
discuss and solve the blocking points
- Coordination with the all departments such acquisition / engineering for the preparation of
Technical documents AS3/ APD / As-built and Planning a sites visit and new sites kickoff
- Coordination with the supervisors / Subcontractors to push the work progress till the final
acceptances with the client ensuring the safety/quality
- Validation of Work done Variations and invoices
-
MOBISERVE Telecom Algeria
- Civil Works Site Engineer
2002 - 2004
# MOBISERVE Telecom Algeria/ March 2002-feb 2004 : ORASCOM Telecom/ Djezzy
- Ensure the different phases before the sites construction such a TSS, Technical Visits then
verification and validation of technical documents
- Construction of technical local, tower foundations and towers/masts erection
- Supervise and assist a technicians teams on all site work such :
* Shelter assembly, interior layouts (pulling power cable, earthing, luminous points, TGBT )
* Pulling feeder on the tower till the shelter including all the accessories cable tray and the
earthing connexions .
-
SOPREB Construction
- Projects engineer
2001 - 2002
# SOPREB Construction - Algeria/
* Concrete plant Responsible then
-
Algerian Education Ministry
- Construction Manager
2001 - 2002
# CORIDA Construction- Algeria/ ; Construction of the Boumerdes Education Academy
# EDUCATION:
* Civil Works Engineer -1998: university of sciences and of the technology `` HOUARI Boumediene '
USTHB
* OP'team - France / Algeria 2013: DESS Project Manager
-
Algerian Sport Ministry
- Construction Manager
1999 - 2001
: Responsible of the construction of three Semi-Olympic Swimming pools