  • Actemium Oil & Gas Commissioning - Precom & Commissioning Site Leader

    ST AUNES 2013 - 2016 TOTAL - TEPNG
    OML 58 UPG - NOPL and OUR project

    NOPL project:
    50km length pipeline, 24"
    2 gas stations (metering, ICSS, utilities, 2500 Basic functions, 49 OTP, 137 sub-systems)


    OUR Project:
    45 km length pipeline, 42"
    3 valves station with SCADA (400 Basic functions, 10 OTP, 30 sub-systems)
  • Actemium Oil & Gas Commissioning - Mechanical Completion Coordinator

    ST AUNES 2013 - 2013 RAS LAFAN / RAS GAS

    HE2 Project

    In charge of precommissioning of the TELECOM work package.
  • Actemium Oil & Gas Commissioning - Commissioning Site Leader

    ST AUNES 2011 - 2013 GRT Gaz.

    OSCAR II poject – Commissioning and Start-up (OPERCOM methodology)
    CSL for SNC LAVALIN

    Site of Saint Avit (Gas compression).

    Commissioning and Start Up of two 10MW electro-compressor and utilities
    166 sub-systems, 4000 Basic Functions.
  • Actemium Oil & Gas Commissioning - Commissioning Site Leader Deputy

    ST AUNES 2011 - 2011 GRT Gaz.
    OSCAR II poject – Commissioning and Start-up (OPERCOM methodology)

    CSL for SNC LAVALIN

    Site of St Avit (Gas compression).

    Commissioning and Start Up of two 10MW electro-compressor and utilities.
    166 sub-systems, 4000 Basic Functions.
  • Actemium Oil & Gas Commissioning - Site activities engineer

    ST AUNES 2010 - 2011 TOTAL - TEPNG
    OML 58 project – Upgrade phase 1

    Site activities preparation (OBITE and OBAGI ICSS change over).
  • Actemium Oil & Gas Commissioning - Commissioning site Leader

    ST AUNES 2010 - 2010 TOTAL - TOTAL Infrastructures Gaz France.

    Project LACAL (Flow Reversibilty)
    Commissioning of the new installation required to reverse the gas flow (France / Spain domestic gas distribution network)
  • Actemium Oil & Gas Commissioning - Commissioning Instrumentation & System Engineer

    ST AUNES 2009 - 2010 Total Infrastructure Gas France (TIGF)
    Artère de Guyenne Project – Commissioning -

    Site of Lussagnet (Gas compression and Gas underground storage).
    Commissioning of two 8MW turbo-compressors, one 8MW electro-compressor and utilities
    4500 Basic functions, 91 sub-systems, 20 OTPs

  • Actemium Oil & Gas Commissioning - Commissioning Site Leader

    ST AUNES 2009 - 2009 TIGF (TOTAL Infrastructures Gaz France)
    Artère de Guyenne Project – Commissioning -
    Integrated Commissioning team.

    Site of Sauveterre de Guyenne (Gas compression).

    Commissioning of one 8 MW turbo-compressor, one 8 MW electro-compressor and auxiliaries.
    3500 Basic functions, 63 sub-systems, 14 OTPs
  • Actemium Oil & Gas Commissioning - Commissioning Instrumentation & System Engineer

    ST AUNES 2008 - 2009 Artère de Guyenne Project – Commissioning - TIGF (Total Infrastructures Gaz France)
    Integrated Commissioning team.

    Commissioning of gas station along the new 38" AGU pipeline.
    E/I, ICSS, control valves, and metering commissioning.
  • COMSIP - Commissioning Site Leader / Ingénieur instrumentation

    Saint-Denis 2008 - maintenant
  • 3I / Ingénica Ingénierie Industriel - Instrumentation Engineer

    2006 - 2008 Contracted by TOTAL Infrastructures Gaz France

    In charge of
    - Basic/Detail studies
    - Precommissioning
    - Commissioning
    - & Start up assistance of gas distribution skid
    of stand alone domestic gas distribution skids deployed over TIGF domestic gas network (process piping, instrumentation and SCADA system)