Commissioning

Entreprises

  • Eurotechnic17llc - Elecrtical Superintendent

    maintenant
  • Eurotechnic17llc - Electrical Superintendent

    2008 - maintenant 03/09: SAIPEM: QATAR O2 Pearl Project (Ras Laffan)

    Electrical site commissioning Engineer
    Installation of the organization of the pre-com/commissioning activities
    Identification of the key stages and the generic risks, preparation of the file of starting.
    Drafting of the procedures and procedures necessary to starting.
    Provision of a file of exploitation, participation in the reception of the installation
    Preparation and execution of the commissioning/Starting, Reporting


    09 /08:SIEMENS: ROUMANIE (Gura), QATAR (Messaied/Ras Laffan),JORDAN (Amman)

    Project of construction GIS 420KV, 245KV and 145KV (Refinery,gas).
    Supervisor HV/LV (8DQ1, 8DN9.0 and 8DN8.2)
    Ensure the communication with the client and the subcontractors.
    Follow-up of the studies, provisioning materials and establishment on site, realization of work.
    Respect of the technical specifications, the planning and preparation of the startups.

    2008:CEGELEC SONATRACH (HASSI MESSAOUD) ALGERIA

    Project of technological systems of safety (Evolynx).
    Section Engineer
    Ensure the communication with the building site teams and the custom
    Coordination, followed studies and establishment on site, organization work and start-ups
    Pre-commissioning of the access control and the video (optical fiber).
    Commissioning Low voltage.

    2007:CEGELEC (SAIPEM) FOS/MER

    Construction post high voltage 90KV terminal methane tanker (substation).
    Supervisor HV LV
    Coordination and supervision of the assembly of the circuit breakers, disconnecting switches lines and Ground, Bus bars
    Lightning protectors a various frames
    Pre-commissioning and commissioning of all the part control.

    2006:CEGELEC (PARIS) VILLEVAUDE

    Realisation of a station 400KV numerically: program Electre
    Supervisor HV
    Coordination and followed construction of the high equipment voltage 400KV
    Replacement of the analogical installations numerically (fiber optic).
    Precommissioning of the electric installations and commissioning with RTE

    2005:CEGELEC (ABB) LORIENT

    Realisation of a compensator 225KV/16KV
    Site foreman
    Assembly of the transformer (filling and filtering) with a customer
    Assembly of reactance’s, capacitor batteries and connections lines, filters and bus bars.
    Installation circuit breakers, assembly of frames and wiring of electrical power boxes
    Analyse plans and establishment of the plans of assembly.

    2002-2005:AMEC SPIE (TOULOUSE)

    Distribution networks (EDF)
    Site foreman
    Equipment stations 20KV: installation of the cells and connections (Schneider, Siemens, Areva).
    Installation of generators: 1250kva, 800kva, 630kva.
    Obliteration of networks: resumption of various connections
    Street lighting: installation and breakdown service
    Realization and connections HTI: Area Airbus, 800 lights.

    1997-2002:ALLEZ&CIE (ROCHEFORT/MER)

    Distribution of networks (EDF)
    Assembler of networks
    Equipment of stations of distribution
    Kits 20KV: cables paper, C223 cables, cables 2000 and C226 cables
    Obliterations of networks, connections new
    Lines HV LV, H59 connections and H61

    1992-1996:EVAT 1er RHP (1er regiment of hussard parachutist)

    Chief of MILAN part: wire-guided missile second generation
    GABON (lambaréné, Port-Gentil, Libreville)
    Djibouti (Arta) Sultana of Oman, Qatar and Kuwait

Formations

Pas de formation renseignée

Réseau

Annuaire des membres :