2008 - maintenant03/09: SAIPEM: QATAR O2 Pearl Project (Ras Laffan)
Electrical site commissioning Engineer
Installation of the organization of the pre-com/commissioning activities
Identification of the key stages and the generic risks, preparation of the file of starting.
Drafting of the procedures and procedures necessary to starting.
Provision of a file of exploitation, participation in the reception of the installation
Preparation and execution of the commissioning/Starting, Reporting
Project of construction GIS 420KV, 245KV and 145KV (Refinery,gas).
Supervisor HV/LV (8DQ1, 8DN9.0 and 8DN8.2)
Ensure the communication with the client and the subcontractors.
Follow-up of the studies, provisioning materials and establishment on site, realization of work.
Respect of the technical specifications, the planning and preparation of the startups.
2008:CEGELEC SONATRACH (HASSI MESSAOUD) ALGERIA
Project of technological systems of safety (Evolynx).
Section Engineer
Ensure the communication with the building site teams and the custom
Coordination, followed studies and establishment on site, organization work and start-ups
Pre-commissioning of the access control and the video (optical fiber).
Commissioning Low voltage.
2007:CEGELEC (SAIPEM) FOS/MER
Construction post high voltage 90KV terminal methane tanker (substation).
Supervisor HV LV
Coordination and supervision of the assembly of the circuit breakers, disconnecting switches lines and Ground, Bus bars
Lightning protectors a various frames
Pre-commissioning and commissioning of all the part control.
2006:CEGELEC (PARIS) VILLEVAUDE
Realisation of a station 400KV numerically: program Electre
Supervisor HV
Coordination and followed construction of the high equipment voltage 400KV
Replacement of the analogical installations numerically (fiber optic).
Precommissioning of the electric installations and commissioning with RTE
2005:CEGELEC (ABB) LORIENT
Realisation of a compensator 225KV/16KV
Site foreman
Assembly of the transformer (filling and filtering) with a customer
Assembly of reactance’s, capacitor batteries and connections lines, filters and bus bars.
Installation circuit breakers, assembly of frames and wiring of electrical power boxes
Analyse plans and establishment of the plans of assembly.
2002-2005:AMEC SPIE (TOULOUSE)
Distribution networks (EDF)
Site foreman
Equipment stations 20KV: installation of the cells and connections (Schneider, Siemens, Areva).
Installation of generators: 1250kva, 800kva, 630kva.
Obliteration of networks: resumption of various connections
Street lighting: installation and breakdown service
Realization and connections HTI: Area Airbus, 800 lights.
1997-2002:ALLEZ&CIE (ROCHEFORT/MER)
Distribution of networks (EDF)
Assembler of networks
Equipment of stations of distribution
Kits 20KV: cables paper, C223 cables, cables 2000 and C226 cables
Obliterations of networks, connections new
Lines HV LV, H59 connections and H61
1992-1996:EVAT 1er RHP (1er regiment of hussard parachutist)
Chief of MILAN part: wire-guided missile second generation
GABON (lambaréné, Port-Gentil, Libreville)
Djibouti (Arta) Sultana of Oman, Qatar and Kuwait