Menu

Eric CADIEU

TRAPPES

En résumé

Mes compétences :
Ferroviaire

Entreprises

  • Ansaldo STS - Wayside Signaling Design Engineer

    2015 - maintenant
  • ALSTOM Transport - System Engineer - Designer

    2012 - 2015 Consultant for IKOS CONSULTING

    - CBTC Urbalis 400 deployment Signalling Design activities
    - System Database and Scheme Plan Implementation for
    Mexico L12 and Panama L1 projects.
    - Interface and support to offshore teams in Bangalore (India).
    - Deployment of the solution U400 for those specifics projects.
    - Interfaces with subsystem ATC, ATS, IXL and FIVP (Validation plateform).

    Technical Environment:
    - Urban signalisation, CBTC,
    - International Projects
    - Advanced Excel functions and VBA Excel Macro
    - Database Generation
    - Team Management
    - ClearQuest
  • Alstom Transport - System Engineer - Verifier

    2010 - 2012 Consultant for IKOS CONSULTING

    Signalling Documents’ Verification for Metro Projects
    - Verification for Santiago L1, Milan L1 and Mexico L12 projects
    - Automatic Verification and process’ follow up

    Technical Environment:
    - Urban signalisation, CBTC,
    - International Projects
    - Advanced Excel functions and VBA Excel Macro
  • SNCF - Centre d'Ingénierie du Matériel (CIM) - Consulting Engineer

    2010 - 2010 Consultant for IKOS CONSULTING (6 months)

    Development of a tool for the Technical Specifications generation for Rolling Stocks Projects

    Realisations:
    - Database of generic requirements for rolling stock creation
    - Automatic Generation of Word Technical Specifications with VBA Excel Macro

    Technical Environment:
    - VBA Macro Development
    - Advanced Excel functions
    - Technical Specification creation methods
  • IKOS CONSULTING - Railway System Engineer

    LEVALLOIS PERRET 2008 - 2015
  • INEXIA - Consulting Engineer

    CHAMBRAY LES TOURS 2008 - 2010 Consultant for IKOS CONSULTING (19 months)

    Project: Signalisation studies (12 months)
    HSL Signalisation (Rhin-Rhône, SEA, BPL) and mainline lines: Studies for Execution and Request for Proposal phases

    Project: Tracks studies (4 months)
    Document creation during Preliminary Design and Preliminary Studies phases

    Project: Energy studies (3 months)
    Unreeling signalling and energy cables report, for Rhin-Rhône HSL
  • EGIS RAIL (anciennement SEMALY) - Intern - R&D Department

    2008 - 2008 Research on an economic tramway for middle shape towns
    - Cost distribution in a tramway project
    - Improvements on the road works, the infrastructure and the civil engineering
  • SNCF Direction de l'ingénierie - Intern

    2007 - 2007 Development of a Finite Element Software:
    - Implementation of a new plate element (DSQ: Discrete Shear Kirchhoff )
    - Dynamical calculus

    Technical environment:
    - C++ Development, Visual Studio (Visual C++)
    - Numerical analysis

Formations

Réseau

Annuaire des membres :