Presentation:
Following my involvement during the erection and commissioning of both E.ON CCGT units (850MW) in the North East of France (1 year), I became shift team engineer (2 years). From January 2012 to June 2013, I was based in the UK and I was working for the CCGT fleet as Deputy Head of Innovation Centre for Gas-CCGT assets. I was responsible for the prioritisation and implementation of a €3M annual R&D programme which was aimed at improving the performance and cost base of the existing assets, protecting them from medium term disruptive influences and developing the fleet of the future.
From July 2013 to July 2014 I was working for the biggest biomass project in France. The aim of the project was to retrofit a coal power plant with a circulating fluidized bed boiler to a biomass power plant (150MW). I was based in the south of France where I was the Deputy Project Construction Manager for the first step of the project and then Commissioning Manager.
Since July 2014 I decided to join Albioma where I am DeputyPower Plant Manager. In this plant (110MW) located on an island in the Indian Ocean, the units are able to burn the residue of sugar cane.
Key Skills:
- Dynamism and creativity
- Mechanics
- Team Management
- Production Engineering
- Project management
- 6 sigma green belt
Mes compétences :
6 sigma
Commissioning
Production
Mechanical Engineer
CCGT
BIOMASS