Menu

Eric Reza TAJIK

Paris

En résumé

Dear sir/madam,
I am process engineer who has totally 16 years’ experience in the chemical /process engineering and in the oil & gas processes (upstream & downstream), power plant.
Dedicated process engineer with excellent technical, analytical and communication skills, Judgment and Decision Making and Troubleshooting, Time Management and Critical Thinking skills with 15 years of experience in Oil &Gas, utilities, power & water & waste water industries. Motivated leader with strong organizational and prioritization abilities. Well-developed analytical skills and high attention to detail. Well-developed reporting and presentation skills. Animate and manage multidisciplinary project teams (10 people) with respect to deadlines, costs, and quality. Some of my behaviors and abilities: Business Acumen, Driving for result, Be a team player with the ability to perform under pressure and be able to handle and meet project deadlines and specifications.
Summary of professional Skills & Capabilities
• Process simulation, optimization and technical support of different plants by Hysys, ASPEN, OLGA, and PRO II
• Flow Assurance studies & results interpreted, dynamic simulation performed.
• Process design review of Offshore & FPSO topsides facilities at FEED engineering phase.
• Providing forecast modelling and data analysis for oil production, gas production and injection, water injection.
• Knowledge of working on well control procedures & drilling process.
• Excellent understanding of production systems from the subsurface reservoir to the surface.
• Preparing operating manual & procedure for process units.
• Providing all the Process Engineering Delivery Documents
• Basic & Detailed design engineering review in EPC projects
• process optimization for upstream & downstream facilities
• NGL/LNG Conceptual design & Technology of production, Cryogenic process cycle (cascade, MRC)
• LNG Regasification & BOG LNG Liquidation simulation study
• Risk assessment & safety management, HAZOP/HAZID, SIL reviews, LOPA study
• PID, PFD, UFD, cause & effect, ESD, PSD, Process piping, Equipment sizing, hydraulic calculations
• Process & piping commissioning(OPERCOMM) activities
• Provide Engineering support to operations and commissioning disciplines
• Codes & Standards : API, ASME, GS TOTAL
• process information for other disciplines (mechanic, instrument , piping and materials)
• Providing process operating & control philosophy.
• Understanding of business economics and project finance
Water & Waste Water treatment plant & process utility units(Design , Start-up & Operation)
Eric Tajik (freedom_f_u@yahoo.com) +33(0) 6 38 11 51 88

Mes compétences :
Offshore Oil & Gas
HAZOP
project planning
Gas Sweetening
Gas Processing
Flow Assurance
FPSO
oil field development
manage the interfaces
equipment design
cost estimation
Process support
Petrochemicals
PIPESIM
P&ID
Onshore Oil & Gas
Oil Refineries
Natural Gas
Musculoskeletal Disorders
Manage the IFA
HYSYS
HAZID
Gas Dehydration
Gas Compressors
Feasibility Studies
FPSO FSRU design
Basic design
Audit
Aspen Plus
Engineering project management
communication skills
Team player
Risk assessment
Project Finance
Process Improvement
LNG
Business Acumen Management
Waste water
Engineering support
technical support
manage multidisciplinary project teams
hydraulic design
conceptual, preliminary process design
Troubleshooting
Time Management
Pipeline Commissioning
Offshore Oil Field Concept Development
FEED design
Detailed design
Critical Thinking skills
ASPEN
pressure profile analysis
presentation skills
data analysis
analytical skills
ASPEN HYSYS
Cost Reduction
Forecasting
Financial Statements/Financial Reports > Balance S
G

Entreprises

  • Technip - LNG Lead process engineer

    Paris 2019 - 2020 activities, project management knowledge

    : SOHAR LNG-Technip
    -------
    Lead process for utility units
  • Technip - LNG Lead process engineer

    Paris 2019 - 2020 activities, project management knowledge

    : SOHAR LNG-Technip
    -------
    Lead process for utility units
  • Start-up for Topside - Lead process engineer

    2019 - 2019 : KAOMBO FPSO- Saipem/Torture FPSO-Offshore-Technip
    Process commissioning & Start-up for Topside facilities Kaombo FPSO
    -------
    * Methanol system, Dewatering & pigging, Gas compression run test, HP/LP, test separator pressurization & start-up, Desalter & Dehydration unit Start-up
    * Lead process for MEG regeneration package design- Tortue FPSO
  • Start-up for Topside - Lead process engineer

    2019 - 2019 : KAOMBO FPSO- Saipem/Torture FPSO-Offshore-Technip
    Process commissioning & Start-up for Topside facilities Kaombo FPSO
    -------
    * Methanol system, Dewatering & pigging, Gas compression run test, HP/LP, test separator pressurization & start-up, Desalter & Dehydration unit Start-up
    * Lead process for MEG regeneration package design- Tortue FPSO
  • ENGIE - Senior process consultant engineer & freelance

    COURBEVOIE 2018 - 2019 : Professional -------
    * NG underground storage: revamping of gas treating units, gas injection
  • ENGIE - Senior process consultant engineer & freelance

    COURBEVOIE 2018 - 2019 : Professional -------
    * NG underground storage: revamping of gas treating units, gas injection
  • TOTAL - Process Engineer

    COURBEVOIE 2017 - 2018 : TOTAL Uganda Development FEED Project-heavy oil refinery
    -------
    - London: Onshore upstream facilities for the production, storage and export of heavy and waxy crude oil through a CPF, multiple Well Pads and associated flow line and pipeline systems
    * To provide support to FEED contractors optimization exercise related to Process issues.
    * Provide support to the project organization on process design and process safety aspects
    * HIPPS justification & dynamic simulation
    * To review and comment engineering documents from process prospective and consolidate comments related to process deliverable.
    * To conduct studies leading to technical decision making and issue recommendation to project management.
    * To coordinate the process relative activities and report to engineering manager
  • TOTAL - Process Engineer

    COURBEVOIE 2017 - 2018 : TOTAL Uganda Development FEED Project-heavy oil refinery
    -------
    - London: Onshore upstream facilities for the production, storage and export of heavy and waxy crude oil through a CPF, multiple Well Pads and associated flow line and pipeline systems
    * To provide support to FEED contractors optimization exercise related to Process issues.
    * Provide support to the project organization on process design and process safety aspects
    * HIPPS justification & dynamic simulation
    * To review and comment engineering documents from process prospective and consolidate comments related to process deliverable.
    * To conduct studies leading to technical decision making and issue recommendation to project management.
    * To coordinate the process relative activities and report to engineering manager
  • Total - Ingénieur des procédés

    COURBEVOIE 2017 - 2018 Contexte et objectifs
    * TILENGA Uganda FEED update project

    Réalisations
    * Tâche #1: Prendre décision pour compétents des choix technico-économiques. ;
    * Sous-tâche #1.1 revue de conception
    * Sous-tâche #1.2 : Gere les points critiques.

    * Tâche #2: Fournir un soutien à l'organisation du projet sur la conception du processus et les aspects liés à la sécurité des processus. ;
    * Sous-tâche #2.1: Fournir un soutien à l'exercice d'optimisation des sous-traitants de FEED lié aux problèmes de processus.

    * Tâche #3: Conduire des études menant à la prise de décision technique et émettre une recommandation à la direction du projet.

    * Tâche #4 : Examiner et commenter les documents d'ingénierie à partir de la prospective du processus et consolider les commentaires relatifs au produit livrable

    Résultats
    * Optimum solution for huile (petrole) traitement unit ;
    * Optimiser le Coût (cost cutting) de projet vis ETF(effeciency task force).

    Bilan personnel
    * Travailler avec une équipe sur un sujet international ;
    * Développer des compétences de communication et manageriel ;
  • Doris Engineering - Ingénieur des procédés

    Paris 2017 - 2017 Contexte et objectifs
    * Revamping d'un FPSO Shell au Nigéria : FEED Engineering

    Environnement technique
    * HYSYS
    * Calculation excel sheets

    Réalisations
    * Tâche #1: Simulation du prosedes et Fournir: HMB, equipment datasheets, Equipment sizing & calculation notes. ;
    * Sous-tâche #1.1: PFD, PID, and PSD par rapport àu planning ;
    * Sous-tâche #1.2 : Fournir les feuilles de données techniques pour : Échangeur du chaleur, vessel, vanne du contrôle, vanne de relief, Package.

    * Tâche #2 : Offrir une solution optimale pour traitement du Gaz unité sur FPSO.

    Résultats
    * Améliorer traitement du Gaz unité sur FPSO ;
    * Dimensionnement de l'équipement et fiche technique ;
    * Améliorer du procédé de system de compression.

    Bilan personnel
    * Travailler avec une équipe sur un sujet international ;
    * Développer des compétences de communication et manageriel ;
  • Doris Engineering - Process engineer & consultant

    Paris 2017 - 2017  03/2017-09/2017 : Doris Engineering, FPSO BSWA FEED update project/ Process engineer / -------
    * Process Simulation and prepared: HMB, equipment datasheets, Equipment sizing & calculation notes.
    * PFD, PID, and PSD preparing with respect to planning schedule
    * Oil Stabilization System modified, and Crude Oil heat optimized.
    * Engineering support for operations of offshore gas facilities.
    * Preparing operating manual & procedure for process units (separation unit, Gas Dehydration, compressor unit, and oil treating unit).
  • Doris Engineering - Process engineer & consultant

    Paris 2017 - 2017  03/2017-09/2017 : Doris Engineering, FPSO BSWA FEED update project/ Process engineer / -------
    * Process Simulation and prepared: HMB, equipment datasheets, Equipment sizing & calculation notes.
    * PFD, PID, and PSD preparing with respect to planning schedule
    * Oil Stabilization System modified, and Crude Oil heat optimized.
    * Engineering support for operations of offshore gas facilities.
    * Preparing operating manual & procedure for process units (separation unit, Gas Dehydration, compressor unit, and oil treating unit).
  • ENGIE - Spain-Madrid Senior Process Engineer- Details engineering

    COURBEVOIE 2014 - 2016 : GDF-TOUAT GAZ project/Madrid-Algerie
    Senior Process Engineer- Details engineering phase of Gas refinery
    Prepare commissioning & operating and start-up philosophy. Preparing final issue for process deliverable documents. Follow-up on all process-engineering aspects. Review & revise the FEED design, providing final revision of PID & approving, final HAZOP & SIL, Manage the IFA process documents, Participate in ICSS FAT, Commissioning activities. Operational Test Procedure (OTP). Test procedure & performance.
  • ENGIE - Senior Process Engineer & Commissioning Process Engineer, Details design engineering

    COURBEVOIE 2014 - 2017  01/2014-03/2017 : GDF(ENGIE)-TOUAT GAZ project/Spain/ Algeria/contract

    & Commissioning
    -------
    * Engineering support to operations and commissioning disciplines
    * Preparing commissioning sequences & operating and start-up philosophy.
    * Operational Test Procedure (OTP) performed for the process units as well as the utility units to prepare for Ready for Start-up (RFSU).
    * Preparing & monitoring Strategy COMM_STARTUP regarding to TOTAL OPERCOM procedure for units.
    * Superintendent Commissioning (process & piping).
    * Participating in scheduling of Commissioning for Process and Utilities Systems
    * Preparing operating manual
    * Review and comment FEED engineering documents and consolidate comments related to process deliverables.
    * To conduct process studies leading to technical decision making & issue recommendation to project management.
    * Final issue prepared for process deliverable documents. (Final revision and approved PID, Datasheets, HAZOP and SIL, Safety report, LOPA study, ESD, PSD, Cause & Effect, PHY, MSD, UFD...)
    * Reviewed & revised of all the process documents in FEED design
    * Gas & condensate production forecast & well pressure analysis.
    * Follow-up Flow Assurance studies & interpreted the results.
    Professional * Simulation, design study of Cold box & cryogenic turbo expander unit.
    * Final revision of PID provided & approved in details design
    Experience * Final HAZOP & SIL, the IFA process documents managed
    (Continue) * Process documents for Engineering packages & utilities has been provided.
  • ENGIE - Senior Process Engineer

    COURBEVOIE 2014 - 2017 Senior Process Engineer : Details design engineering phase of Gas refinery plant -TOUAT GAZ project
    Algeria-Adrar site (01/2016-03/2017): Commissioning Process Engineer

     Finalizing details engineering documents, Engineering support to operations and commissioning disciplines
     Preparation of the planning and commissioning sequences
     Preparing commissioning & operating and start-up philosophy.
     SIMOPS study during the period of First Gas In (GAS IN prestart up /PSSR)
     Operational Test Procedure (OTP) performed for the process units as well as the utility units in order to prepare for RFSU.
     Preparing & monitoring Strategy COMM_STARTUP regarding to TOTAL OPERCOM procedure for units.
     Superintendent Commissioning (process & piping) in site for Hydro test, leak test, functional test, flushing.
     Participating in scheduling of Commissioning of Process and Utilities Systems
  • GDF Suez - Senior process engineer & ET Commissioning process engineer

    2014 - 2017 Fonction Senior process engineer ET Commissioning process engineer
    Contexte et objectifs
    * Details design engineering phase of Gas refinery plant -TOUAT GAZ project
    * Construction, Installation et Commissioning of Touat Gaz refinery. ;

    Environnement technique
    * HYSYS
    * Autocad
    * PDMS et 3D Model

    Réalisations
    * Prévision de production de gaz et de condensat et analyse de pression de puits.
    * Participation à l'analyse technique des offres fournisseurs ;
    * Interpréter de l'Assurance de flux pour la simulation transitoire dans la conception détaillée. ;
    * Revu et révisé de tous les documents de processus dans la conception FEED ;
    * Final revision of PID provided & approved in details design ;
    * HAZOP & SIL, the IFA process documents managed ;
    * Process documents for Engineering packages & utilities has been provided
    * Préparer la mise en service et fournir la philosophie de fonctionnement et de démarrage. ;
    * Superintendent Commissioning (process & piping) in site for Hydro test, leak test, functional test, flushing. ;
    * Participer à la planification de la mise en service

    Résultats
    * Finalisation des détails des documents d'ingénierie ;
    * Fournir le support technique aux opérations et aux disciplines de mise en service
    * Final issue prepared for process deliverable documents. (Final revision and approved PID, Datasheets, HAZOP and SIL, Safety report, LOPA study, ESD, PSD, Cause & Effect, PHY, MSD, UFD...) ;

    Bilan personnel
    * Cette mission m'a appris à me surpasser ;
    * Travailler avec une équipe sur un sujet international ;
    * Développer des compétences de communication et manageriel ;
  • GDF SUEZ - Senior Process Engineer- Details engineering

    COURBEVOIE 2014 - 2016 Prepare commissioning & operating and start-up philosophy. Preparing final issue for process deliverable documents. Follow-up on all process engineering aspects. Review & revise the FEED design, providing final revision of PID & approving, final HAZOP & SIL, Manage the IFA process documents
  • ENGIE - Senior Process Engineer & Commissioning Process Engineer, Details design engineering

    COURBEVOIE 2014 - 2017  01/2014-03/2017 : GDF(ENGIE)-TOUAT GAZ project/Spain/ Algeria/contract

    & Commissioning
    -------
    * Engineering support to operations and commissioning disciplines
    * Preparing commissioning sequences & operating and start-up philosophy.
    * Operational Test Procedure (OTP) performed for the process units as well as the utility units to prepare for Ready for Start-up (RFSU).
    * Preparing & monitoring Strategy COMM_STARTUP regarding to TOTAL OPERCOM procedure for units.
    * Superintendent Commissioning (process & piping).
    * Participating in scheduling of Commissioning for Process and Utilities Systems
    * Preparing operating manual
    * Review and comment FEED engineering documents and consolidate comments related to process deliverables.
    * To conduct process studies leading to technical decision making & issue recommendation to project management.
    * Final issue prepared for process deliverable documents. (Final revision and approved PID, Datasheets, HAZOP and SIL, Safety report, LOPA study, ESD, PSD, Cause & Effect, PHY, MSD, UFD...)
    * Reviewed & revised of all the process documents in FEED design
    * Gas & condensate production forecast & well pressure analysis.
    * Follow-up Flow Assurance studies & interpreted the results.
    Professional * Simulation, design study of Cold box & cryogenic turbo expander unit.
    * Final revision of PID provided & approved in details design
    Experience * Final HAZOP & SIL, the IFA process documents managed
    (Continue) * Process documents for Engineering packages & utilities has been provided.
  • GDF SUEZ - Senior process engineer

    COURBEVOIE 2014 - 2017 TOUAT GAZ Projet
    Senior Process Engineer : Details design engineering and commissioning phase of Gas refinery plant -TOUAT GAZ project
  • Foster Wheeler - Process consultant engineer

    Paris 2013 - 2013 TOTAL QATAR PROJECTS
  • Foster Weeler Co. - Contract Principal Process Engineer

    2013 - 2014
  • Genesis oil & Gas - Principal Process Engineer

    2013 - 2014 Contexte et objectifs
    * L'Assurance de flux pour la simulation transitoire dans la conception & simulation dynamique. ;
    * Offshore, LNG, FPSO FSRU
    * NGL fractionation facilities

    Environnement technique
    * HYSYS, OLGA, Cost engineering,PROII

    Réalisations
    * Interpréter de l'Assurance de flux pour la simulation transitoire dans la conception
    * Étude conceptuelle préparée pour l'élimination des gaz acides dans les installations offshore.(FPU Indonesian Offshore Oil Field Concept Development.) ;
    * FPSO étude de conception et optimisation énergétique. Coût, temps et estimation des ressources ;
    * Bul Hanine gas onshore refinery-TOTAL Qatar (pre-feed Unit process optimization. NGL fractionation facilities ;
    * Préparer et établir un Project management plan pour Decommissioning ;
    Résultats
    * Optimisation des processus pour les installations sur FPSO ;
    * process optimization

    Bilan personnel
    * Cette mission m'a appris à me surpasser ;
    * Travailler avec une équipe sur un sujet international ;
    * Développer des compétences de communication et manageriel ;
  • Genesis Oil & Gas & Foster Wheeler - Senior Process Engineer

    2013 - 2014 : Genesis Oil & Gas & Foster Wheeler- * Bul Hanine NGL recovery-TOTAL Qatar (pre-feed Unit process optimization. NGL fractionation facilities.
    * TOUATGAZ FEED finalizing.
    * Flow Assurance report prepared & results of transient simulation interpreted.
    * Provides forecast modelling and data analysis for oil production, gas production and injection, water injection for topside FPSO facilities.
    * Conceptual study prepared for acid gas removal for offshore facilities with comparing between amine & membrane technology.
    * FPU Indonesian Offshore Oil Field Concept Development.
    * LNG BOG re-liquefaction simulation & study-Belgium LNG
    * Perform conceptual, preliminary process design of LNG units & Cryogenic exchanger.
    * FSRU design study and energy optimization.
    * LNG Regasification simulation study performed, Korea gas
    * FPSO topsides process facilities reviewed & optimized
  • Genesis Oil & Gas & Foster Wheeler - Senior Process Engineer

    2013 - 2014 : Genesis Oil & Gas & Foster Wheeler- * Bul Hanine NGL recovery-TOTAL Qatar (pre-feed Unit process optimization. NGL fractionation facilities.
    * TOUATGAZ FEED finalizing.
    * Flow Assurance report prepared & results of transient simulation interpreted.
    * Provides forecast modelling and data analysis for oil production, gas production and injection, water injection for topside FPSO facilities.
    * Conceptual study prepared for acid gas removal for offshore facilities with comparing between amine & membrane technology.
    * FPU Indonesian Offshore Oil Field Concept Development.
    * LNG BOG re-liquefaction simulation & study-Belgium LNG
    * Perform conceptual, preliminary process design of LNG units & Cryogenic exchanger.
    * FSRU design study and energy optimization.
    * LNG Regasification simulation study performed, Korea gas
    * FPSO topsides process facilities reviewed & optimized
  • Genesisoilandgas - Principal process engineer

    2013 - 2013
  • Foster Weeler Co. - Contract Principal Process Engineer

    2013 - 2013 Kasawari (Malaysia) acid gas removal: Conceptual study for acid gas removal with amine & membrane technology. Dynamic simulation, H2S bed sizing.
    BACTON gas compressor Dynamic simulation
    Professional FPSO FSRU design study and energy optimization ,FPSO cost estimation
    Indonesian oil field development(Offshore): Technip ,
  • Foster Weeler Co. - Contract Principal Process Engineer

    2013 - 2014 Chez Genesis_Technip/Foster Weeler Co. Paris:
     Flow Assurance report prepared & results of transient simulation interpreted.
     Provides forecast modelling and data analysis for oil production, gas production and injection, water injection for topside FPSO facilities.
     Well production forecast & pressure profile analysis.
     Conceptual study prepared for acid gas removal for offshore facilities with comparing between amine & membrane technology.
     FPU Indonesian Offshore Oil Field Concept Development.
     Perform conceptual, preliminary process design of LNG units & Cryogenic exchanger.
     FPSO FSRU design study and energy optimization. Cost, time & resources estimation. Flow assurance & Process support.
     LNG Regasification simulation study performed.
     FPSO topsides process facilities reviewed & optimized
     Bul Hanine gas onshore refinery-TOTAL Qatar (pre-feed Unit process optimization. NGL fractionation facilities.
  • Foster Weeler Co. - Contract Principal Process Engineer

    2013 - 2014 Conceptual study for acid gas removal with amine & membrane technology. Dynamic simulation, H2S bed sizing.
    Perform conceptual, preliminary process design of LNG units.
    Professional FPSO FSRU design study and energy optimization .Cost, time & resources estimation. Flow assurance & Process support.
    Bul Hanine gas onshore refinery-TOTAL Qatar (pre-feed Unit process optimization. NGL fractionation.
  • TOTAL Co. - Lead process engineer

    2012 - 2013
  • TOTAL Co. - Lead Process Engineer

    2012 - 2013 : Lead Process Engineer : Developing Gas Fields in Algeria-TIMIMOUN Project
    Basic & Detail Design of FEED Engineering for gas processing plant, Assist with closeout of HAZOP / PTR actions , conceptual studies, HAZOP/HAZID, SIL, equipment sizing, PID approved, Flare network calculation, BDV, PSV calculation, Technical clarification with contractor and Licensor
    Manage project teams (5 multidisciplinary persons) for objectives: the respect for deadlines, costs, quality and technical assurance.
    Ensure that the process design is in line with Company standards and is in coherence with the existing Facilities design. To prepare process documents during engineering phase.
  • TOTAL Co. - Lead Process Engineer

    2012 - 2013 : Lead Process Engineer : Developing Gas Fields in Algeria-TIMIMOUN Project
    Basic & Detail Design of FEED Engineering for gas processing plant, Assist with closeout of HAZOP / PTR actions , conceptual studies, HAZOP/HAZID, SIL, equipment sizing, PID approved, Flare network calculation, BDV, PSV calculation, Technical clarification with contractor and Licensor
    Manage project teams (5 multidisciplinary persons) for objectives: the respect for deadlines, costs, quality and technical assurance.
    Ensure that the process design is in line with Company standards and is in coherence with the existing Facilities design. To prepare process documents during engineering phase.
  • Total - Lead Process Engineer

    COURBEVOIE 2012 - 2013 Contexte et objectifs
    * Développement de Gas Fields in Algeria-TIMIMOUN /TOTAL Project.

    Environnement technique
    * HYSYS

    Réalisations
    * Basic & Detail Design of FEED Engineering for gas processing plant. ;
    * Analyse technique des offres fournisseurs ;
    * Elaboration des schemas proceed ;
    * Etablissement des bilans matières et thermiques ;
    * Participation à la rédaction des manuels opératoires, des procédures de mise en route et des essais de performance. ;
    * Participation à l'analyse technique des offres fournisseurs, ;
    * Assister pour HAZOP / PTR actions, conceptual studies, HAZOP/HAZID, SIL. ;
    * Clarification technique avec les fournisseurs et licensors. ;
    * S'assurer que la conception du processus est conforme aux normes du client et est cohérente avec la conception. ;
    * Equipment sizing, PID approved, Flare network calculation, BDV, PSV calculation, simulation optimization. ;
    * Gérer les équipes de projet (5 multidisciplinary persons) pour les objectives: respecter à planification de projet ;
    * Preparing all the process documents during engineering phase ;
    Résultats
    * FEED Engineering finalized

    Bilan personnel
    * Cette mission m'a appris à me surpasser ;
    * Travailler avec une équipe sur un sujet international ;
    * Développer des compétences de communication et manageriel ;
  • TOTAL Co. - Lead Process Engineer

    2012 - 2013  01/2012-01/2013 : TOTAL Co. Paris/Contract - TIMIMOUN FEED, Basic Engineering Project
    -------
    : Developing Gas Fields in Algeria-TIMIMOUN /TOTAL Project FEED Engineering for gas processing plant.
    * Support project teams (5 multidisciplinary persons) for objectives: respected for deadlines, costs, quality and technical assurance.
    * To provide process support to engineering manager in the review of process engineering deliverables
    * Ensure that the process design is in line with Company standards GS-EP-ECP and is in coherence with the project specification.
    * Preparing all the process deliverable documents during engineering phase.
    * To perform process simulation and HMB calculation.
    * Assist with closeout of HAZOP, HAZID, SIL, PTR actions, conceptual studies.
    * Equipment sizing, PID approved, Flare network calculation, BDV, PSV calculation, simulation optimization.
    * Technical clarification with contractor and Licensor
  • TOTAL via sofren - Lead process engineer

    Saint-Cloud Cedex 2012 - 2013
  • TOTAL Co. - Lead Process Engineer

    2012 - 2013  01/2012-01/2013 : TOTAL Co. Paris/Contract - TIMIMOUN FEED, Basic Engineering Project
    -------
    : Developing Gas Fields in Algeria-TIMIMOUN /TOTAL Project FEED Engineering for gas processing plant.
    * Support project teams (5 multidisciplinary persons) for objectives: respected for deadlines, costs, quality and technical assurance.
    * To provide process support to engineering manager in the review of process engineering deliverables
    * Ensure that the process design is in line with Company standards GS-EP-ECP and is in coherence with the project specification.
    * Preparing all the process deliverable documents during engineering phase.
    * To perform process simulation and HMB calculation.
    * Assist with closeout of HAZOP, HAZID, SIL, PTR actions, conceptual studies.
    * Equipment sizing, PID approved, Flare network calculation, BDV, PSV calculation, simulation optimization.
    * Technical clarification with contractor and Licensor
  • Litwin-CITI Technology Group - Lead process engineer

    2011 - 2012 CO2 capture plant: feasibility study, project planning, Process data book simulation of unit, equipment design, BFD ,PFD, PID, MSD, Datasheet of equipment
    Fertilizer plant: sulpheric acid unit, water treatment unit, utility unit
    Design & sizing the gas dehydration tower-gas pipe sizing & valve sizing-depressurizing calculation. Thermal/hydraulic calculations and issue process documents (PFD, P&ID, BFD, BDV, Flare calculation)
  • Litwin-CITI Technology Group - Lead process engineer

    2011 - 2012 * CO2 capture plant: feasibility study, project planning, Process data book simulation of unit, equipment design, BFD, PFD, PID, MSD, Datasheet of equipment. ;
    * Water treatment unit, utility unit Start-up & operation
    * Design & sizing the gas dehydration tower-gas pipe sizing & valve sizing-depressurizing calculation.
    * Thermal/hydraulic calculations and issue process documents (PFD, P&ID, BFD, DTS,BDV, Flare calculation) ;
  • Litwin - Lead Process Engineer

    2011 - 2012 Contexte et objectifs
    * CO2 captage projet, description du processus, innovation proposée ;
    * Gazéification, syngaz Conditionne Section- R&D projet

    Environnement technique
    * HYSYS, PROII
    * PROJECT PLANNING

    Réalisations
    * Tâche #1 projet planification
    - estimation des heures D'ingénierie par service procédé ;
    - Procès data book
    * Tâche #2 Documents de base
    * Base d'études de procédé ;
    * Bilans matériels et thermique, Préparation des PFD et PID, BFD,MSD
    * liste des équipements, Préparation de la fiche technique pour l'équipement ;
    * Tâche #3 Simulation du processus complet
    * Tâche #4 conception des équipements
    Résultats
    * Diminuer d'énergie consomption de régénération ;
    * Élaboration des schémas procédés ;
    * Etablissement des bilans matières et thermiques ;
    * Optimisions de procédé avec flash évaporation et Ejector ;
    * améliorer de récupération de CO2 compressé

    Bilan personnel
    * Travailler avec une équipe de R&D sur un sujet international ;
    * Cette mission m'a appris à me surpasser ;
    * Développer des compétences de communication ;
    * Travailler avec passion et entrain ;
  • Litwin-CITI Technology Group - Lead process engineer

    2011 - 2012  * CO2 capture plant: feasibility study, project planning, Process data book simulation of unit, equipment design, BFD, PFD, PID, MSD, Datasheet of equipment.
    * Water treatment unit, utility unit Start-up & operation
    * Design & sizing the gas dehydration tower-gas pipe sizing & valve sizing-depressurizing calculation.
    * Thermal/hydraulic calculations and issue process documents (PFD, P&ID, BFD, DTS, BDV, Flare calculation)
  • Litwin-CITI Technology Group - Lead process engineer

    2011 - 2012  * CO2 capture plant: feasibility study, project planning, Process data book simulation of unit, equipment design, BFD, PFD, PID, MSD, Datasheet of equipment.
    * Water treatment unit, utility unit Start-up & operation
    * Design & sizing the gas dehydration tower-gas pipe sizing & valve sizing-depressurizing calculation.
    * Thermal/hydraulic calculations and issue process documents (PFD, P&ID, BFD, DTS, BDV, Flare calculation)
  • France (Paris) - Training

    2010 - 2011
  • Raymand SAZEH Consultants Engineering - Senior Process Engineer

    2006 - 2010 Contexte et objectifs
    * Developing Gas Fields & Refinery in IRAN, Detailed Engineering projects.

    Environnement technique
    * HYSYS, PROII, OLGA ;
  • SAZEH Consultants Engineering Co - Senior Process Engineer

    2006 - 2010 Coordinate and control all process activities for gas refinery plant. Preparing of Process data book for project.
    Hydraulic calculations- pump calculations for CFU and NGL facilities.
    Optimization of gas plant, providing of conceptual design report for upstream and gas refinery.
    Simulating of process units for treating gas plant by HYSYS and PROMAX (sweetening, dehydration, dew point control, Sulfur Recovery Unit)
    Oil field process system optimization - gas gathering & compression stations. Oil Desalting & dehydration projects.
    Provide process assistance for technical clarifications & Preparing technical proposal for tenders for oil & gas refinery, ability to provide technical support for proposal works and come up with man-hours estimation in addition to raising technical queries to accurately define the project scope of work. Management of project, feasibility of project, project planning, process book of project. Pipeline hydraulic design & calculations. (single & two phase)
  • SAZEH Consultants Engineering Co - Senior Process Engineer

    2006 - 2010 : SAZEH Consultants Engineering Co
    -------
    -SP Projects, Phases 4 & 5, 14 & 15, Pars LNG
    * Follow-up of Flow Assurance studies & interpreted the results at FEED design.
    * Preparing of Process Engineering deliverables.
    * Provide process assistance for technical clarifications & preparing technical proposal for tenders for oil & gas refinery.
    * PARS LNG feasibility, pre-FEED, and conceptual study, technology selection study, two 5 MTPA LNG trains, Liquefin Technology
    * IRAN LNG, two 5 MTPA LNG trains, Linde (MFC) Technology: FEED Updating
    * Conceptual design review for NGL fractionation units.
    * Oil Desalting & dehydration. Oil separation process system optimization.
    * Hydraulic calculations- pump calculations for NGL facilities.
    * Optimization of gas plant, providing of conceptual design report for upstream and gas refinery. Gas gathering & compression stations.
    * Simulating of process units for treating gas plant by HYSYS and PROMAX (sweetening, dehydration, dew point control, Sulfur Recovery Unit)
    * Provide process assistance for technical clarifications.
    * Preparing technical proposal for tenders for oil & gas refinery, ability to provide technical support for proposal works and man-hours estimation.
    * Pipeline hydraulic design & calculations. (single & two phase)
  • SAZEH Consultants Engineering Co - Senior Process Engineer

    2006 - 2010 : SAZEH Consultants Engineering Co
    -------
    -SP Projects, Phases 4 & 5, 14 & 15, Pars LNG
    * Follow-up of Flow Assurance studies & interpreted the results at FEED design.
    * Preparing of Process Engineering deliverables.
    * Provide process assistance for technical clarifications & preparing technical proposal for tenders for oil & gas refinery.
    * PARS LNG feasibility, pre-FEED, and conceptual study, technology selection study, two 5 MTPA LNG trains, Liquefin Technology
    * IRAN LNG, two 5 MTPA LNG trains, Linde (MFC) Technology: FEED Updating
    * Conceptual design review for NGL fractionation units.
    * Oil Desalting & dehydration. Oil separation process system optimization.
    * Hydraulic calculations- pump calculations for NGL facilities.
    * Optimization of gas plant, providing of conceptual design report for upstream and gas refinery. Gas gathering & compression stations.
    * Simulating of process units for treating gas plant by HYSYS and PROMAX (sweetening, dehydration, dew point control, Sulfur Recovery Unit)
    * Provide process assistance for technical clarifications.
    * Preparing technical proposal for tenders for oil & gas refinery, ability to provide technical support for proposal works and man-hours estimation.
    * Pipeline hydraulic design & calculations. (single & two phase)
  • Raymand SAZEH Consultants Engineering Co - Senior Process Engineer

    2006 - 2010 * Follow-up of Flow Assurance studies & interpreted the results at FEED design. ;
    * Preparing of Process delivery for project. ;
    * Conceptual design review for NGL fractionation units. ;
    * Oil Desalting & dehydration. ;
    * Hydraulic calculations- pump calculations for CFU and NGL facilities.
    * Optimization of gas plant, providing of conceptual design report for upstream and gas refinery.
    * Simulating of process units for treating gas plant by HYSYS and PROMAX (sweetening, dehydration, dew point control, Sulfur Recovery Unit)
    * Oil field process system optimization - gas gathering & compression stations.
    * Provide process assistance for technical clarifications.
    * Preparing technical proposal for tenders for oil & gas refinery, ability to provide technical support for proposal works and man-hours estimation.
    * Project planning, process book of project. ;
    * Pipeline hydraulic design & calculations. (single & two phase) ;
  • Technical Industrie - Process engineer

    Berre l'Etang 2002 - 2006 *  01/2002-01/2006 : Technicon industry & BIPC Petrochemical Complex
    -------
    * Oil processing plants (Separation, desalting, dehydration, sweetening, stabilization)
    * Preparation of P&ID & Providing & assessment of the HAZOP process.
    * Operating & Start -up activities of oil separation and distillation unit
    * Preparing operation Troubleshooting table for rotary equipment (problems, causes & solutions.
    * Operating of HDPT (Heavy Polyethylene) unit.
    * Water & waste water treatment unit (Operating & Start-up)
  • Power plant & Energy Org. - Process engineer

    2002 - 2006 * Preparation of P&ID. Providing & assessment of the HAZOP process.
    * Operating & Start -up activities of water treatment & condenser unit, Turbine unit for power plant.
    * Supervisor on installation of equipment for water treatment units. ;
  • power plant Co - Process engineer

    2002 - 2006 Operating of water treatment & condenser unit, Turbine unit for power plant.
    Supervisor on installation of equipments for turbine & water treatment units.
    Preparation of P&ID, PID approved. Providing & assessment of the HAZOP process.
  • Technical Industrie - Process engineer

    Berre l'Etang 2002 - 2006 *  01/2002-01/2006 : Technicon industry & BIPC Petrochemical Complex
    -------
    * Oil processing plants (Separation, desalting, dehydration, sweetening, stabilization)
    * Preparation of P&ID & Providing & assessment of the HAZOP process.
    * Operating & Start -up activities of oil separation and distillation unit
    * Preparing operation Troubleshooting table for rotary equipment (problems, causes & solutions.
    * Operating of HDPT (Heavy Polyethylene) unit.
    * Water & waste water treatment unit (Operating & Start-up)
  • power plant Co - Process engineer

    2001 - 2005 Operating of water treatment & condenser unit, Turbine unit for power plant.
    Supervisor on installation of equipments for turbine & water treatment units.
    Preparation of P&ID, PID approved.
    Providing & assessment of the HAZOP process.
  • Petrochemical-BIPC - Process Engineer

    2001 - 2002 * Water & waste water treatment unit ( Operating & Start-up)-Process Engineer ;
  • Petrochemical complex - Engineering Contractor

    2000 - 2001 * Experience in HAZID/HAZOP meetings, Process Audits, Provide Engineering support to operations and commissioning disciplines

    * Simulating of Oil refinery processes.(Distillation & Fractionating column,Isomerization)

    * Familiar whit Knowledge of Management of project, feasibility of project, project planning
    Additional professional activities
    * Review and comment on technical documents produced by Vendors, 3rd party contractors and Engineering Contractor.

    * Dominant on gas processing& treatment (sweetening, dehydration and liquefying) on offshore & onshore facilities.

    * Trees of objectives, planning of project (Gantt, Pert, P3) technical Organization chart, Matrix of the responsibilities, Matrix SWOT, Wallet, Return to experiences(REX)

    Pipeline hydraulic calculations, Piping, and pipeline installation, pipe laying barge (offshore).

Formations

  • RGU University (Aberdeen)

    Aberdeen 2016 - 2017 MSc

    ODL Learning Courses - RGU University Aberdeen
  • RGU University (Aberdeen)

    Aberdeen 2016 - 2019 MSc Oil&Gas Engineering

    Education & Training & Certificates * MSc Oil & Gas Engineering:
  • RGU University (Aberdeen)

    Aberdeen 2016 - 2019 MSc Oil&Gas Engineering

    Education & Training & Certificates * MSc Oil & Gas Engineering:
  • RGU University (Aberdeen)

    Aberdeen 2016 - 2017 Master of Science

    Oil & Gas Engineering
  • Moscow Power Inistitut (Obninsk)

    Obninsk 2002 - 2003 Cours

    sur l'exploitation des centrales électriques
  • Natural Gas Liquid RESEARCH INSTITUT (Tehran)

    Tehran 1998 - 1999 technology of production about NGL& L.N.G (natural gas liquid).
  • University Of Tehran (Teheran)

    Teheran 1995 - 2000 Bachelor of Science

    * BOSIET, OPITO, Norwegian oil & Gas Safety Certificates for Offshore

    Languages
  • University Of Tehran (Teheran)

    Teheran 1995 - 2000 Bachelor of Science

    * BOSIET, OPITO, Norwegian oil & Gas Safety Certificates for Offshore

    Languages
  • Tehran University (Tehran)

    Tehran 1995 - 2000 engineering B.sc

    Objective Professional chemical engineer- PROCESS & DESIGN ENGINEER
    -faculty of engineering
    B.sc/chemical-process engineering- gas industries
  • Tehran University (Tehran)

    Tehran 1995 - 2000 Bachelor of Science

    Chemical Engineering - Gas process

Réseau

Annuaire des membres :