China Petroleum Jilin Chemical Engineering & Construction Co., Ltd.
- Piping Engineer
2013 - maintenant
(Client: Technip France)
• Project: construction and réhabilitation of Raffinerie complexe .Baraki-Algies.
• Monitoring & Inspection for weld parameters like calibration of welding equipment’s, electrode handling, electrode baking, and pre heat temperature & inter pass temperature etc.
• Skilled of read and understand ASME B31.1 ,B31.3, the isometric, P&ID, WPS, and drawings.
• Attaining site , shop Piping RFI’s
• Check delivered material ready at site (material & spools identification and conservation status), preassembly and pipe or spool internal cleaning.
• Check pipe or spool erection and alignment.
• Check orifice flanges, venturi installation and pneumatic test for reinforcing pads.
• Witness valve installation and check parallelism and alignment of flanges.
• Coordinating with client Inspector for day to day Inspection activities and also combined line check and getting test-packs signed off/Master Punch List (MPL).
• Line check, pressure test package preparation.
• Prepare the punch list and weld completion (pretest inspection).
• Witness internal cleanliness /air blowing.
• Witness blind flanges installation and hydro test execution.
• Ensuring that all Piping Erection activities are in accordance with approved Project Specification, ITP, and Drawing & Construction code.
• Daily inspection and coordination with vendors and contractor.
• Carrying fit-up, visual inspection of weld joints & signing DWR’s.
• Preparation of Line/Weld History sheets.
• Reviewing Piping Hydro, Visual Test package & Inspection reports.
• Carrying piping pre-hydro & Re-instatement Line Walk Inspection and Writing Punch Lists.
• Witness flanges parallelism and stud bolt tightening.
• Witnessing Hydrostatic, pneumatic testing
-
China Petroleum Jilin Chemical Engineering & Construction Co., Ltd.
- Piping Engineer
2013 - maintenant
(Client: Technip France)
• Project: construction and rehabilitation of Refinery complex .Barraki-Algies.
• Monitoring & Inspection for weld parameters like calibration of welding equipment’s, electrode handling, electrode baking, and pre heat temperature & inter pass temperature etc.
• Skilled of read and understand ASME B31.1 ,B31.3, the isometric, P&ID, WPS, and drawings.
• Attaining site , shop Piping RFI’s
• Check delivered material ready at site (material & spools identification and conservation status), preassembly and pipe or spool internal cleaning.
• Check pipe or spool erection and alignment.
• Check orifice flanges, venturi installation and pneumatic test for reinforcing pads.
• Witness valve installation and check parallelism and alignment of flanges.
• Coordinating with client Inspector for day to day Inspection activities and also combined line check and getting test-packs signed off/Master Punch List (MPL).
• Line check, pressure test package preparation.
• Prepare the punch list and weld completion (pretest inspection).
• Witness internal cleanliness /air blowing.
• Witness blind flanges installation and hydro test execution.
• Ensuring that all Piping Erection activities are in accordance with approved Project Specification, ITP, and Drawing & Construction code.
• Daily inspection and coordination with vendors and contractor.
• Carrying fit-up, visual inspection of weld joints & signing DWR’s.
• Preparation of Line/Weld History sheets.
• Reviewing Piping Hydro, Visual Test package & Inspection reports.
• Carrying piping pre-hydro & Re-instatement Line Walk Inspection and Writing Punch Lists.
• Witness flanges parallelism and stud bolt tightening.
• Witnessing Hydrostatic, pneumatic testing.
-
China Petroleum Jilin Chemical Engineering & Construction Co., Ltd.
- Piping Engineer
2013 - maintenant
(Client: Technip France)
* Project: construction and rehabilitation of Refinery complex .Barraki-Algies.
* Monitoring & Inspection for weld parameters like calibration of welding equipment's, electrode handling, electrode baking, and pre heat temperature & inter pass temperature etc. ;
* skilled of read and understand the isometric , P&ID, WPS, and drawings. ;
* Attaining site , shop Piping RFI's ;
* Ensuring that all Piping Erection activities are in accordance with approved Project Specification, ITP, and Drawing & Construction code. ;
* Daily inspection and coordination with vendors and contractor. ;
* Inspection of site Received Piping and spools assemblies. ;
* Carrying fit-up , visual inspection of weld joints & signing Daily DWR's. ;
* Preparation of Line/Weld History sheets. ;
* Reviewing Piping Hydro, Visual Test package & Inspection reports. ;
* Carrying piping pre-hydro & Re-instatement Line Walk Inspection and Writing Punch Lists. ;
* Witnessing piping Bolt Torqueing.
* Witnessing Hydrostatic, pneumatic testing.
* Coordinating with client Inspector for day to day Inspection activities and also combined line check and getting test-packs signed off/Master Punch List (MPL).
*
-
KUMYI
- Painting Engineer
2012 - 2013
* Project : construction and rehabilitation of RA1K Refinery complex .Skikda-
(Client: Samsung Engineering)
* Painting / coating inspection of steel structural works, pipeline, pressure vessels.
* Responsible for stage wise painting / coating inspection.
* Execute Painting / coating inspection work as per company / project inspection test plan.
* To check and monitor all painting / coating related works and ensure all final products meet in accordance with company procedure, client requirement and international codes.
-
KUMYI
- Painting Engineer
2012 - 2013
* Project : construction and rehabilitation of RA1K Refinery complex .Skikda-
(Client: Samsung Engineering)
* Painting / coating inspection of steel structural works, pipeline, pressure vessels.
* Responsible for stage wise painting / coating inspection.
* Execute Painting / coating inspection work as per company / project inspection test plan.
* To check and monitor all painting / coating related works and ensure all final products meet in accordance with company procedure, client requirement and international codes.
-
KUMYI
- Painting Engineer
2012 - 2013
* Project : construction and rehabilitation of RA1K Refinery complex .Skikda-
(Client: Samsung Engineering)
* Painting / coating inspection of steel structural works, pipeline, pressure vessels. ;
* Responsible for stage wise painting / coating inspection. ;
* Execute Painting / coating inspection work as per company / project inspection test plan. ;
* To check and monitor all painting / coating related works and ensure all final products meet in accordance with company procedure, client requirement and international codes.
-
Entrepose Contracting
- QA/QC WELDING ENGINEER
Colombes
2011 - 2012
: • Project: LNG 2K Skikda-New LNG TRAIN SKIKDA PROJECT-Algeria.
(Client: KBR 2)
• To participate in the workshop" LEADER SHIP IN SAFETY organized by KBR 2.
• CND (PT, MT, VT) Level 2.
• Use codes and standards as of the construction contract, ASME B31.3, ASME IX, API 650, API 620, etc.
• Generate Inspection procedures (ITPs) based on the project specifications and Standards.
• Walk with the client on every inspection raised and rectify comments as soon as possible.
• Witness tanks peaking and banding inspection.
• Witness inspection on plumpness and roundness of the tanks.
• Witness NDE inspections like vacuum test, PT, MT, etc.
• Identify materials: Positive material identification (PMI), magnetic check of stainless steel root runs and use the drawing to check the correct material type and group.
• Correct use of approved procedures & welder qualification the correct parent material & welding consumables as of the approved procedures. The correct welding position as of welders qualification to which he had passed to.
• In process welding surveillance, correct consumables, heat input, and inter-run cleaning, check any imperfections e.g. slag, porosity, lack of inter-run fusion; weave width, distortion, etc.
• Preparation of Inspection reports: Check the correct welding procedures (WPS), welder qualification, correct NDT used, PWHT reports, materials and consumables certification if full traceable. All reports must be signed by respective inspection departments.
-
entrepose cotracting
- QA/QC WELDING ENGINEER
2011 - maintenant
• Project: LNG 2K Skikda-New LNG TRAIN SKIKDA PROJECT-Algeria.
(Client: KBR 2)
• To participate in the workshop" LEADER SHIP IN SAFETY organized by KBR 2.
• CND (PT, MT, VT) Level 2.
• Use codes and standards as of the construction contract, ASME B31.3, ASME IX, API 650, API 620, etc.
• Generate Inspection procedures (ITPs) based on the project specifications and Standards.
• Walk with the client on every inspection raised and rectify comments as soon as possible.
• Witness tanks peaking and banding inspection.
• Witness inspection on plumpness and roundness of the tanks.
• Witness NDE inspections like vacuum test, PT, MT, etc.
• Identify materials: Positive material identification (PMI), magnetic check of stainless steel root runs and use the drawing to check the correct material type and group.
• Correct use of approved procedures & welder qualification the correct parent material & welding consumables as of the approved procedures. The correct welding position as of welders qualification to which he had passed to.
• In process welding surveillance, correct consumables, heat input, and inter-run cleaning, check any imperfections e.g. slag, porosity, lack of inter-run fusion; weave width, distortion, etc.
• Preparation of Inspection reports: Check the correct welding procedures (WPS), welder qualification, correct NDT used, PWHT reports, materials and consumables certification if full traceable. All reports must be signed by respective inspection departments
-
Entrepose Contracting
- QA/QC welding engineer leve 2
Colombes
2011 - 2012
: Obtaining of the Certificate NDT (MT , PT) ASNT Level II
Pofessional Experience