Menu

Farid CHELLIA

SKIKDA

En résumé

Mes compétences :
Welding
Quality Control
Quality Assurance
pneumatic testing
electrode handling
Stainless steel
Pressure Vessel
P&ID
Microsoft Word
Microsoft Windows XP
Microsoft Windows Vista
Microsoft Windows 2000 Professional
Microsoft PowerPoint
Microsoft Outlook
Microsoft Excel
Mechanical Engineering
Maintenance Management
MPL
Industrial Maintenance
Calibration
Audit
pressure test package preparation
installation
Pneumatics

Entreprises

  • China Petroleum Jilin Chemical Engineering & Construction Co., Ltd. - Piping Engineer

    2013 - maintenant (Client: Technip France)
    • Project: construction and réhabilitation of Raffinerie complexe .Baraki-Algies.

    • Monitoring & Inspection for weld parameters like calibration of welding equipment’s, electrode handling, electrode baking, and pre heat temperature & inter pass temperature etc.
    • Skilled of read and understand ASME B31.1 ,B31.3, the isometric, P&ID, WPS, and drawings.
    • Attaining site , shop Piping RFI’s
    • Check delivered material ready at site (material & spools identification and conservation status), preassembly and pipe or spool internal cleaning.
    • Check pipe or spool erection and alignment.
    • Check orifice flanges, venturi installation and pneumatic test for reinforcing pads.
    • Witness valve installation and check parallelism and alignment of flanges.
    • Coordinating with client Inspector for day to day Inspection activities and also combined line check and getting test-packs signed off/Master Punch List (MPL).
    • Line check, pressure test package preparation.
    • Prepare the punch list and weld completion (pretest inspection).
    • Witness internal cleanliness /air blowing.
    • Witness blind flanges installation and hydro test execution.
    • Ensuring that all Piping Erection activities are in accordance with approved Project Specification, ITP, and Drawing & Construction code.
    • Daily inspection and coordination with vendors and contractor.
    • Carrying fit-up, visual inspection of weld joints & signing DWR’s.
    • Preparation of Line/Weld History sheets.
    • Reviewing Piping Hydro, Visual Test package & Inspection reports.
    • Carrying piping pre-hydro & Re-instatement Line Walk Inspection and Writing Punch Lists.
    • Witness flanges parallelism and stud bolt tightening.
    • Witnessing Hydrostatic, pneumatic testing
  • China Petroleum Jilin Chemical Engineering & Construction Co., Ltd. - Piping Engineer

    2013 - maintenant (Client: Technip France)
    • Project: construction and rehabilitation of Refinery complex .Barraki-Algies.

    • Monitoring & Inspection for weld parameters like calibration of welding equipment’s, electrode handling, electrode baking, and pre heat temperature & inter pass temperature etc.
    • Skilled of read and understand ASME B31.1 ,B31.3, the isometric, P&ID, WPS, and drawings.
    • Attaining site , shop Piping RFI’s
    • Check delivered material ready at site (material & spools identification and conservation status), preassembly and pipe or spool internal cleaning.
    • Check pipe or spool erection and alignment.
    • Check orifice flanges, venturi installation and pneumatic test for reinforcing pads.
    • Witness valve installation and check parallelism and alignment of flanges.
    • Coordinating with client Inspector for day to day Inspection activities and also combined line check and getting test-packs signed off/Master Punch List (MPL).
    • Line check, pressure test package preparation.
    • Prepare the punch list and weld completion (pretest inspection).
    • Witness internal cleanliness /air blowing.
    • Witness blind flanges installation and hydro test execution.
    • Ensuring that all Piping Erection activities are in accordance with approved Project Specification, ITP, and Drawing & Construction code.
    • Daily inspection and coordination with vendors and contractor.
    • Carrying fit-up, visual inspection of weld joints & signing DWR’s.
    • Preparation of Line/Weld History sheets.
    • Reviewing Piping Hydro, Visual Test package & Inspection reports.
    • Carrying piping pre-hydro & Re-instatement Line Walk Inspection and Writing Punch Lists.
    • Witness flanges parallelism and stud bolt tightening.
    • Witnessing Hydrostatic, pneumatic testing.
  • China Petroleum Jilin Chemical Engineering & Construction Co., Ltd. - Piping Engineer

    2013 - maintenant (Client: Technip France)
    * Project: construction and rehabilitation of Refinery complex .Barraki-Algies.

    * Monitoring & Inspection for weld parameters like calibration of welding equipment's, electrode handling, electrode baking, and pre heat temperature & inter pass temperature etc. ;
    * skilled of read and understand the isometric , P&ID, WPS, and drawings. ;
    * Attaining site , shop Piping RFI's ;
    * Ensuring that all Piping Erection activities are in accordance with approved Project Specification, ITP, and Drawing & Construction code. ;
    * Daily inspection and coordination with vendors and contractor. ;
    * Inspection of site Received Piping and spools assemblies. ;
    * Carrying fit-up , visual inspection of weld joints & signing Daily DWR's. ;
    * Preparation of Line/Weld History sheets. ;
    * Reviewing Piping Hydro, Visual Test package & Inspection reports. ;
    * Carrying piping pre-hydro & Re-instatement Line Walk Inspection and Writing Punch Lists. ;
    * Witnessing piping Bolt Torqueing.
    * Witnessing Hydrostatic, pneumatic testing.

    * Coordinating with client Inspector for day to day Inspection activities and also combined line check and getting test-packs signed off/Master Punch List (MPL).

    *
  • KUMYI - Painting Engineer

    2012 - 2013 * Project : construction and rehabilitation of RA1K Refinery complex .Skikda-
    (Client: Samsung Engineering)
    * Painting / coating inspection of steel structural works, pipeline, pressure vessels.
    * Responsible for stage wise painting / coating inspection.
    * Execute Painting / coating inspection work as per company / project inspection test plan.
    * To check and monitor all painting / coating related works and ensure all final products meet in accordance with company procedure, client requirement and international codes.
  • KUMYI - Painting Engineer

    2012 - 2013 * Project : construction and rehabilitation of RA1K Refinery complex .Skikda-
    (Client: Samsung Engineering)
    * Painting / coating inspection of steel structural works, pipeline, pressure vessels.
    * Responsible for stage wise painting / coating inspection.
    * Execute Painting / coating inspection work as per company / project inspection test plan.
    * To check and monitor all painting / coating related works and ensure all final products meet in accordance with company procedure, client requirement and international codes.
  • KUMYI - Painting Engineer

    2012 - 2013 * Project : construction and rehabilitation of RA1K Refinery complex .Skikda-
    (Client: Samsung Engineering)
    * Painting / coating inspection of steel structural works, pipeline, pressure vessels. ;
    * Responsible for stage wise painting / coating inspection. ;
    * Execute Painting / coating inspection work as per company / project inspection test plan. ;
    * To check and monitor all painting / coating related works and ensure all final products meet in accordance with company procedure, client requirement and international codes.
  • Entrepose Contracting - QA/QC WELDING ENGINEER

    Colombes 2011 - 2012 : • Project: LNG 2K Skikda-New LNG TRAIN SKIKDA PROJECT-Algeria.
    (Client: KBR 2)
    • To participate in the workshop" LEADER SHIP IN SAFETY organized by KBR 2.
    • CND (PT, MT, VT) Level 2.
    • Use codes and standards as of the construction contract, ASME B31.3, ASME IX, API 650, API 620, etc.
    • Generate Inspection procedures (ITPs) based on the project specifications and Standards.
    • Walk with the client on every inspection raised and rectify comments as soon as possible.
    • Witness tanks peaking and banding inspection.
    • Witness inspection on plumpness and roundness of the tanks.
    • Witness NDE inspections like vacuum test, PT, MT, etc.
    • Identify materials: Positive material identification (PMI), magnetic check of stainless steel root runs and use the drawing to check the correct material type and group.
    • Correct use of approved procedures & welder qualification the correct parent material & welding consumables as of the approved procedures. The correct welding position as of welders qualification to which he had passed to.
    • In process welding surveillance, correct consumables, heat input, and inter-run cleaning, check any imperfections e.g. slag, porosity, lack of inter-run fusion; weave width, distortion, etc.
    • Preparation of Inspection reports: Check the correct welding procedures (WPS), welder qualification, correct NDT used, PWHT reports, materials and consumables certification if full traceable. All reports must be signed by respective inspection departments.
  • entrepose cotracting - QA/QC WELDING ENGINEER

    2011 - maintenant • Project: LNG 2K Skikda-New LNG TRAIN SKIKDA PROJECT-Algeria.
    (Client: KBR 2)
    • To participate in the workshop" LEADER SHIP IN SAFETY organized by KBR 2.
    • CND (PT, MT, VT) Level 2.
    • Use codes and standards as of the construction contract, ASME B31.3, ASME IX, API 650, API 620, etc.
    • Generate Inspection procedures (ITPs) based on the project specifications and Standards.
    • Walk with the client on every inspection raised and rectify comments as soon as possible.
    • Witness tanks peaking and banding inspection.
    • Witness inspection on plumpness and roundness of the tanks.
    • Witness NDE inspections like vacuum test, PT, MT, etc.
    • Identify materials: Positive material identification (PMI), magnetic check of stainless steel root runs and use the drawing to check the correct material type and group.
    • Correct use of approved procedures & welder qualification the correct parent material & welding consumables as of the approved procedures. The correct welding position as of welders qualification to which he had passed to.
    • In process welding surveillance, correct consumables, heat input, and inter-run cleaning, check any imperfections e.g. slag, porosity, lack of inter-run fusion; weave width, distortion, etc.
    • Preparation of Inspection reports: Check the correct welding procedures (WPS), welder qualification, correct NDT used, PWHT reports, materials and consumables certification if full traceable. All reports must be signed by respective inspection departments
  • Entrepose Contracting - QA/QC welding engineer leve 2

    Colombes 2011 - 2012 : Obtaining of the Certificate NDT (MT , PT) ASNT Level II
    Pofessional Experience

Formations

  • Université Du 20 Aout 1955 Skikda, Algerie (Skikda)

    Skikda 2005 - 2010 Ingenieur Electromecanique

    * Option: Maintenance industriel.
  • 20 Aout 1955 Skikda (Skikda)

    Skikda 2005 - 2010

Réseau

Annuaire des membres :