Saint-Denis2015 - maintenant Overhaul of a 4x176 MW Steam Turbine Power Plant – Ras Djinet, Algeria:
• Interface with the project owner (SONELGAZ), government agencies, subcontractors and other stakeholders.
• Manage the works and financial progress of the steam turbine and generator overhaul
• Manage the mobilization of the expatriate technicians (a team of forty), labor and visa regulations, transportation and escorts.
• Manage the site camp: catering and accommodation.
Siemens, Energy Management / Power Transmission, Algeria
- Project Manager
Saint-Denis2014 - 2015 EPC of a 220/60 KV and a 60/10 KV GIS Substations, in Oran, Algeria, in consortium with SIEMENS France. Client SONELGAZ
Job description:
• Manage Siemens Spa part of the project consisting in engineering, procurement, civil work and erection;
• Interface with the Consortium partner;
• Interface with the project owners (SONELGAZ), government agencies, engineering consultants, subcontractors and other stakeholders.
Cegelec, Algeria
- Project Manager
Saint-Denis2009 - 2011Construction of the first Wind Power Plant to be built in Algeria in consortium with CEGELEC Energy France
Job description:
• Prospected, identified, prepared proposals, bid and won a 26 M€ project, Adrar’s Wind Farm.
• Managed the local part of Adrar’s Wind Farm construction consisting in local engineering, procurement, logistics and erection.
• Interfaced with the project owner, SONELGAZ, government agencies (DTP, CREG, DPEM) engineering consultants (CTC, topographical and geotechnical studies, impact on the environment, civil engineering), subcontractors and other stakeholders.
ABB, Water Division, Algeria
- ABB AG, Water Division, Algeria
2007 - 2009Construction of the largest water transfer in western Algeria, M.A.O, comprising two dams, one pumping station and its electrical substation, a water treatment plant and a 120 Km water pipeline.
Job description:
Managed the local part of ABB’s 45 M€ scope, consisting in the engineering, procurement and erection of the mechanical and electrical equipments of the 6 m³/s raw water pumping station and its 220/10 KV - 50 MW electrical substation;
Interfaced with clients (ANBT and MAPA), government agencies (DTP, SONELGAZ), subcontractors and other stakeholders.