Menu

Hicham ZAQI

SAFI

En résumé

Solar Power Plant and wind farms Instrumentation & Control
Supervisor

Mes compétences :
Local training
Forklift Trucks
Calibration
Ultrasound
Steam Turbines
Siemens Hardware
Pneumatics
Microsoft Word
Microsoft Windows XP
Microsoft PowerPoint
Microsoft Excel
Microsoft DOS
Maintenance
Industrial Automation
IBM OS/2
Firefighting
Field fault analysis
Control and Instrumentation
Control Circuits
Autocad
Assembly Plants

Entreprises

  • nomac - Instrumentation & Control Supervisor

    2015 - maintenant Instrumentation & Control Supervisor at the Company NOMAC.Morocco
  • Siemens Mobility - Team Leader OM department Operation and Maintenance at the company SIEMENS.

    Saint-Denis 2014 - maintenant • Team Leader Level 5 – OM Operation and Maintenance Department. Project: TARFAYA .Farm wind 131
    Turbines type SWT- 2.3 – 101)
  • BENED - Maintenance supervisor in instrumentation and electrical

    2011 - 2012 • Commissioning a system AGBAR ( Fire Fighting ) for the systems HTF; BOP ; HRSG ; GT13E2 ; ST DK13Y2; DCI….
    • Commissioning a system ISCC (integrated solar combined cycle)
    • Commissioning a system SILVANI ( CO2 Fire Fighting ;spray deluge system ) for the GT13E2.
    • Commissioning a system SILVANI ( Spray deluge system ) for the ST DK13Y2.
    • Commissioning a system TOMTRONIC (combustible gas detection) For the GT13E2
    • Gas turbine inspection A - GT13E2 ( construction and commissioning )
    • Commissioning a system HRSG ( Heat Recovery Steam Generator )
    • Gas turbine inspection B - GT13E2 ( construction and commissioning )
    • Steam turbine inspection A - DK13Y2 ( construction and commissioning )
    • Steam turbine inspection B - DK13Y2 ( construction and commissioning )
    • Steam turbine generator inspection C - DK13Y2 (construction and commissioning)
    • Gas turbine inspection C - GT13E2 (construction and commissioning)
  • Abengoa - Maintenance technician in instrumentation and electrical at the company

    SEVILLA 2011 - 2014 • Commissioning a system AGBAR ( Fire Fighting ) for the systems HTF; BOP ; HRSG ; GT13E2 ; ST DK13Y2; DCI….
    • Commissioning a system ISCC (integrated solar combined cycle)
    • Commissioning a system SILVANI ( CO2 Fire Fighting ;spray deluge system ) for the GT13E2.
    • Commissioning a system SILVANI ( Spray deluge system ) for the ST DK13Y2.
    • Commissioning a system TOMTRONIC (combustible gas detection) For the GT13E2
    • Gas turbine inspection A - GT13E2 ( construction and commissioning )
    • Commissioning a system HRSG ( Heat Recovery Steam Generator )
    • Gas turbine inspection B - GT13E2 ( construction and commissioning )
    • Steam turbine inspection A - DK13Y2 ( construction and commissioning )
    • Steam turbine inspection B - DK13Y2 ( construction and commissioning )
    • Steam turbine generator inspection C - DK13Y2 (construction and commissioning)
    • Gas turbine inspection C - GT13E2 (construction and commissioning)
  • Cegelec - Maintenance technician

    Saint-Denis 2006 - 2011 • Project DAP fertilizer and acid in collaboration with MOROCCO PHOSPHOR JERF LASFAR El
    Jadida. From : June 10th,2010 to July 12th,2010

    • Commissioning with the DeltaV DCS Unit 02 grinding. Lines X / Y / Z Project, in collaboration with MOROCCO
    PHOSPHOR III and IV JORF LASFAR El Jadida.

    • Design and animation of diagrams with DCS DeltaV (new sulfuric line) in collaboration with MOROCCO
    PHOSPHOR I SAFI.

    • Team Leader- instrumentalist in commissioning system’s: Combined cycle GT, ST and HRSG, HTF ,SOLAR
    FIELD (475MW) From: January 18th 2010 to June 04th,2010:solar power plant (ONE) Ain Beni Mathar.in
    (Collaboration with ABENER Construction).

    • Commissioning safety system’s: TAMTRONIC ; SELVANI and AGBAR in all the power plant ISCC

    • Team Leader - instrumentation department. Project: Electrification and Instrumentation 3rd of Decanter: Daoui
    OCP- KHOUREBGA
    .
    • Team Leader - instrumentation department. Project: Construction and commissioning of flow
    Measurement steam and condensate. MOROCCO PHOSPHOR-SAFI.

    • Team Leader instrumentation department. Project: Acid and Fertilizer Unit BMB. BRAZIL MOROCCO
    PHOSPHOR JORF LASFAR El JADIDA.

    • Team Leader: Department of Automation and Control Project: Unit new line sulfuric .MAROC PHOSPHOR I

    • From August 7th, 2004 to September 30th, 2004 Internship two months of his society RACHA SERVICE AGADIR.
    (Pumping stations).

    • From October 01th, 2004 to November 30th, 2004 Internship two months factory COPAG (Jawda) TAROUDANT.
    (Maintenance Machines service) ERKA 1. 2. 3 and 4, production of yarourt pots. ELOUPAK 1 and 2, UHT Milk)

    • Wiring and calibration of instruments Krohn, Resoumonte. Youkogawa. WIKA. ABB ....
    Maintenance-pneumatic, mechanical and safety valves with calibration. etc ....

    • Communication tools under control : Communication protocol HART 375, FLUKE 744 , YOKOGAWA
    ROUSEMENT,ENDRESS+HAUSER ,FISHER....

Formations

  • Ensa (Safi)

    Safi 2014 - 2016 Diploma

    Diploma Maintenance of Industrial Engineering and Safety of Process( ENSA Safi )
  • Lycée Charif El Idrissi (Safi)

    Safi 1998 - 1999 Baccalaureate Degree

Réseau

Annuaire des membres :