Paris2012 - maintenant -Swap project from NSN & Huawie to ALU
- Analyze before and after swap through drive test using TEMS and ACTIX (2G & 2.5).
- Acceptance report of DT using check list.
- Parameters mapping before swap (NSN with ALU and Huawie with ALU)
- KPIs mapping before swap (NSN with ALU and Huawie with ALU)
ALCATEL
- RNO consultant (TOGOCEL project)
Paris2012 - 2012- Radio planning and optimization
- Analyze complaints through 2G & 2.5G drive test using TEMS
- Generating of daily and weekly HW problems at cell and BSC level
- Frequency and parameters change in order to improve or enhance the KPI
- Implementation of the parameter change at OMC side using PRC
- Cheking and making trial for new features for B10
- Make CS & PS parameters audit on all network.
- Make job training to local Engineers.
ALU EMTS (etisalat Nigeria)
- RNO consultant
2010 - 2011Troubleshoot daily HW issues using NPO/OMC for ALU
Check daily QOS and analyze performance degradation
Analyze complaints through 2G & 2.5G drive test using TEMS investigation tool (Ericsson)
Analyze coverage and performance through 2G Q-Voice campaigns using Actix post-processing tool
Improve KPIs by generating appropriate actions for all above issues (frequency/parameter tuning, mechanicals actions, reset) under plug & play CSV files using NPO station or excel/access macros
Create site data base for new site using Map Info, Planet and Excel tools
Perform periodical parameters audit with excel/access macros
Perform a successful automatic frequency plan project using OPTIMI, ATOL & PLANET tools
Support BSC/LAC policy definition in cooperation with BSS / NSS teams
OrascomTelecom Algerie
- Radio Optimization Senior Engineer
Alger2006 - 2011Ingénieur d’optimisation GSM/GPRS
•Radio Planing : étude des nouveaux sites pour couverture et densification, verification type d’antenne,tilt et HBA .
•Générer le daily et weekly des HW problemes au niveau des cellules et des BSC .
•Resolution des problemes radio (Coverture et qualitè) basé par le drivetest compaign (TEMS et Ascom ACTIX) et les KPI’s.
•Changement des fréquences et des parametres dans l’ordre d’ameliorer ou augmenter les KPI’s (Call drop, CSSR, HO Sucess,…)
•Création des Site database pour les nouveaux sites (Fréquences, parameters and neighbouring).
•Audit des paramétres dans tout le réseau.
•OMC (changement des paramétres, changement des fréquences….)
•Drivetest et analyse des logfiles (TEMS Investigation et Actix Ascom)
•Dans l’ordre d’implementer le changement des paramètres dans l’OMC plus rapidement, génére des fichiers CSV, aussi pour : HO Delete, HO addition, changement de parametre pour les cellules et les HO relations….
•Project de HO audits avec l’équipe NSS, dans l’ordre de vérifier les déclarations des LAC manquant au niveau NSS.