Saint Ouen2010 - 2011ALGERIE Alstom Project Terga 3x 400 MW
Contractor: Orascom ( Egyptian Compagny)
Eleco (Chinese Compagny)
In charge of erection of instrumentation.
-Define weeky program
-Control respect of erection in accordance of Alstom precedure ( GS093 GS092 GS040)
-Control of manpower and toolong available on contractor side
-Organise erection avoid any disruption with other activities.
-Follow up of leak test
-Control of furniture in accordance with technical specification
-Daily Report to manger on site activities and progress
-HSE report
-Training of Instrumentation for local manpower and foreman.
TOTAL
- E&I Engineer
COURBEVOIE2008 - 2009YEMEN BLOC –Kharir CPU
In charge of E&I projects on site from the construction phase up to the precommission phase for TOTAL Yemen ( ICAPS/OPERCOM Procedure)
-Flare upgrade Project ( contracteur Hawk)
Rewanping of a CPU including the installation and set up of several new vessels (KOD-Degassing boot-Flare-Blowers etc…)
-Fire Fighting and F&G Projects (contracteur TANMIA)
Construction of a FIFI and F&G network including instrumentation, electrical and PLC installation.
-Installation at an electrical and HVAC network in miscellaneous buildongs ( workshop, air strip terminal building, CPU control room)
TOTAL
- Instrumentation supervisor
COURBEVOIE2007 - 2008ANGOLA COBO BLOC 3 TOTAL Production
Maintenance supervisor
-Maintenance monitoring on site
-Writing and modification preventif
-Follow up of manpower, reporting, checking of articles by SAP.
-Training of Angola manpower to the instrumentation expertise.
-Follow up of rewamping campaign on a Fuel-Gas unit.
-Have worked on the following equipment:
Flowmeter with CORIOLIS effect, type Micro Motion, rosemount
Electromagnetism: Endress-Hauser, Krohne
Valves TOR: AMRI
Controles Valves: Fisher, Masoneilan, Samson
Level: Capacitif, Delta P, plongeur
Fire detection: Central CERBERUS ( Type BCII), regular check of detectors.
Gaz detection: Regular check of GENERALE MONITOR Sensors