-
SANOFI
- Ingénieur Projets
Paris
maintenant
-
LAFARGE
- Maintenance Manager
Paris
2009 - 2010
13 Months In charge of the maintenance of mobile and fixed equipments , new projects ,the werehouse and CAPEX
Responsabilities
-the planning, scheduling and supervision of the overall Maintenance
-to Manage my subordinates' performance, and recommends
developmental programs and work improvements techniques;
-Sets rehabilitation plans to maintain the continuous productivity of the equipment and minimize the occurrence of sudden breakdowns.
-Prepares necessary reports and data analysis and set action plans and recommendations
-Proposes systems to increase and monitor operations efficiency
-Investigates accident causes and proposes prevention methods and safety plans
-Prepares and monitors the operational budget and manpower;
-Conducts expenditures control on material consumption, overtime hours...
-Responsible for establishing and implementing work standards;
-To maintain an inventory of full products and raw materials. To ensure that
there is always sufficient quantity to meet demand. To rotate inventory.
-To manage warehousing and loading operations to ensure efficient operation.
-To set policy and procedures for warehouse operation.
-To develop procedures to minimize loss or damaged product in warehouse.
-To prepare departmental budget for manpower and materials requirements.
-
JA DELMAS, Concessionnaire CATERPILLAR
- Technical Manager
Bordeaux
2008 - 2009
Project
for Their projects in Mauritania in offshore and onshore environment,
Main responsibilities:
- Technical support to service sales, field service, Technical support to
10 Months customers. Technical problem solving of customer claims and involvement of
product company in the problem solving process.
- Participate in root cause investigations initiated by product companies. Make
and report inspections and investigations made at sites,
- Archive the report in Bordeaux Short product trainings for customers using
Softwares and Equipments like: COMPASS, SPI2, SIS , ET , Generators,
compressors, machines (compactors-Backhoe Loaders-Hydraulic Excavators
Motor Graders-Off-Highway Trucks-Scrapers- Track-Type Tractors etc),
planning and Costs calculating etc , diesel engines ( Perkins -Caterpillar )
and forklifts Hyster Mobile Cranes (TEREX - O/k ), Transmissions in the same
time responsible for the Maintenance/commissioning / Warranty
-
CAF
- Maintenance / Warranty Engineer
Paris
2007 - 2008
Project
Project of acquisition of 17 Diesel Trains for Algeria
- Responsible of maintenance /Warranty of different
Equipments like : power generation, diesel engines (MAN) diagnosis and
vibration testing ,turbo transmission ,hydraulic systems pneumatic systems
18 Months (SAB WABCO) (BOSCH) micro processor control , gearboxes, electronic and
electrical control systems ( SEPSA -VOITH for the turbo transmission) ,A/C
systems (MERAK) , heat exchanger Cooling Systems ,Alternators
( SIEMENS),advanced brake systems (FAIVELEY) .
- Manufacturing units inspection in Spain ,establishment of procedures for
project monitoring .
- Maintenance and warranty receipt trains in Algeria , testing and delivery .
-
Schlumberger ( WesternGeco ) Algeria
- Chief Mechanic
2006 - 2006
Project
Geophysical Gas project in In Amenas ( Algeria )
- Seismic equipments Maintenance :
diesel engines (caterpillar-Detroit),caterpillar units, Transmissions (caterpillar), drive train components, air compressors, micro processor controls, electro- mechanical equipment, Hydraulic systems, hydraulic pumps (caterpillar) pneumatic systems, gearboxes (Caterpillar), generators (caterpillar), Seismic units (Caterpillar desert explorer), Drilling units .
6 Months
-
Halliburton Energy Services
- Mechanical Engineer
2003 - 2006
Permanent
Oil / Gas equipments Maintenance
- responsible in charge of variety of equipments including;
diesel engines (Caterpillar, Detroit, Cummins), well operation units
31 Months (coiled tubing-frac / simulation- well control - cementing), transmissions, drive
train components, winches, high pressure pumps 10 KPS, centrifugal pumps,
sand conveyor systems, air compressors, micro processor controls, electro-
mechanical equipment, hydraulic systems, pneumatic systems,
mobile/overhead cranes, wellhead attachments and pressure equipment,
gearboxes, PTO's, generators, chemical metering systems, 12/24v electrical
systems, A/C systems
-
SBC
- Mechanical Foreman
2000 - 2003
SBC Setting up factory in Skikda ( Algeria )
- setting up of both and glass production line and PET production line as well as
the setting up of the boiler and the cooling groups, Drilling and water
treatment unit installation equipment and CO2 gas unit .
- Mechanical Foreman : responsible in charge of the Factory equipment
41 Months maintenance Factory equipment spare parts were housing management,
spare parts manuals codifications and equipments, annual maintenance
program elaboration.
- Maintenance of heavy/light vehicles Supervisor : maintenance of
light and heavy trucks, coca cola vehicles spare parts management as well as
engines and vehicles maintenance program supervisor.
- Maintenance / Production Supervisor : Production and maintenance
management .