Menu

Karim HAWEM

SOUSSE

En résumé

Je suis un technicien superieur genie mecanique option energetique ISET Nabeul

Mes compétences :
HSE
Firefighting
Technical Training
Plumbing
Planned Maintenance
Air Conditioning
planning of maintenance and control
fire protection training
Team player
System Evaluation
Residential Buildings
Orthopedics
Ophthalmology
Microsoft Word
Microsoft Excel
MEP project design
High skills
Heat Exchanger
HVAC
Good experience
Fire Protection
Commercial Buildings
Audit
Assembly Plants
A Checks

Entreprises

  • Fattouma Bourguiba Hospital - Assistant Director of Engineering

    2014 - maintenant Assist and Conduct the HVAC works of Operating rooms; Orthopedic, ophthalmology and Nero surgery based on the new recommendations, regulations, of Indoor Air Quality controls and technical standards ISO 7 .and NFS 90-351

    -Assist the Commissioner's fire and security representative to prepare the regular fire inspections
    - Prepare the program with subcontractor Company to Check and control the fire fighting equipments; portable extinguishing, fire pumps, fire cabinet and exhaust ventilation system ....
    -Inspection and supervise of automatic Fire Alarm Installations in boiler room ,Air Handling systems room, kitchen, Laundry, the important parts of Building
    - Prepare with the Health Services a regular planning of maintenance and control to prevent from the risk of Legionella and other microbial ,in the potable and sanitary water tank an and facility's air handling systems
    -Manage the necessary stock and prepare requisitions for supplies and installations ; water supply equipments, cooling and heating system s, air Filtration equipments (Special treatment area filters and standard filters)

    - Assist in providing information and updates on on-going maintenance works to other departments

    On routine basis.

    - Prepare the check programs, and record the all parameter (temperatures ,pressures ,TH .ph ) , through out the control systems of the HVAC machine; Boiler ,Chiller, Heat Pumps, air handling SYSTEMS ,radiant Heating, central utility, pumps ,Fire pumps, cold and heat Water Tanks, ...
  • Fattouma Bourguiba Hospital - Assistant Director of Engineering

    2014 - maintenant
  • HOPITAL UNIVERSITAIRE - TECHNICIEN SUPÉRIEUR DE CLIMATISATION

    2014 - maintenant RESPONSABLE DE MAINTENANCE DES EQUIPEMENTS FRIGORIFIQUE ET FROID
  • CLINIQUE LES OLIVIERS - RESPONSABLE de MAINTENANCE

    2013 - 2014  Gérer et encadrer une équipe de maintenance
     Planifier les travaux de l’équipe de maintenance.
     Suivre les paramètres d’exploitation des installations et équipements de différents services de la clinique
     Préparer des rapports de visites et des inspections
     Assiste les visites de maintenance des différents corps de métiers
  • LES OLIVIERS CLINUQUE - Maintenance Chef

    2013 - 2014 Perform preventive maintenance of heating, cooling, air conditioning, ventilation equipments and the monitored systems, according to the control schedules.
    - Maintain and repaired all equipment, such as compressors, pumps, ventilating fans, burners, and air conditioning control systems.
    -Perform routine maintenance on equipment and determining when and what kind of maintenance is needed.
    Participate to preparing a new project; material receiving, site meeting, to the all project phases (construction and commissioning phase)
    *Change of Gas Piping Systems and construction of a new measurement station, that supply gas at a pressure compatible with the boiler room, the laundry and the central kitchen
    *Install a new water treatment systems Supply and Distribution
    *Install an automatic control systems of Boiler room, Water Supply and Distribution systems, pumps.
    *Install a new fire fighting systems
    *Change of Medical Gases piping; Supply and Distribution
    -Coordinate with other services for preparing an installation programs
    -Good experience in supervising many services in Clinique ; Operating Rooms, laboratory ,Treatment Rooms, Delivery Rooms, Recovery Area and Supply Store Rooms Areas
  • Movenpick Resort - Assistant Director of Engineering

    2013 - 2013 Organize and set up preventive maintenance programs for all electrical and mechanical equipments
    -Conduct all preventive maintenance checks in coordination with a chef engineer
    -Manage stock and prepare requisitions for parts and supplies
    -check and prepare a regular inspection of different Mechanicals, electrical, Plumbing and fire fighting systems
    -Answer all guest inquiries with courtesy and efficiency
    -Maintain and repair facility swimming pool, SPA equipment
    - Manage subcontractor in their works and ensure their works are performed at the desired level of quality, standards and complete in target time
    -Coordinate with the outside contactor for the necessary maintenance work that was carried in the facility
    -assessed the accuracy of HVAC and refrigeration PM and gave feed backs to management
  • HOTEL MOVENPICK SOUSSE - ASSISTANT DIRECTEUR TECHNIQUE

    2013 - 2013  Encadrer et coordonner les activités d’installateurs et ouvriers sur chantier.
     préparer les travaux, planifier des opérations, déterminer les procédés techniques des différents composants à installer.
     Assurer les opérations d’approvisionnement nécessaire : choix des matériels, réception des livraisons, préparation du stock.
  • Sonmez metal - Inspecteur qualite

    2008 - 2008 - Monitors the day to day activities of the Contractor.
    - Ensure that all Mechanical work is performed in accordance with the scope of work, the Specifications, the approved plans and procedures and the Approved for Construction drawings.
    - Keep the Site Quality Coordinator and the Construction Superintendent updated of the status of facility / Mechanical related quality issues.
    - Ensure that assigned facilities and Mechanical works and surveillance are performed in accordance with the Inspection & Test Plans.
    - Perform QC of all daily facility / Mechanical works reports and inspection records.
  • Hammamet Airport - QA/QC Inspector

    2008 - 2010 Client; TAV Construction; Mechanical subcontractor SONMEZ METAL: Turkish Company
    - building inspection of ;l HVAC ,fire fighting ,plumbing Installation ,chillers ,arc chute, boilers ,burners ,fan coil, fire dumpers Air handling units, Exhaust fans ,pumps and expansions Tanks ,Diffusers grills flexible duct and dumpers ,air duct manufacture installation and insulation
    VAV systems, split units, Fm -200, Fire pumps, Fire cabinet and Fire sprinkler flush reservoir
    Pumps and pressure tanks, sanitary

    - Ensure all Mechanical works are performed in accordance with, the Specifications, the approved plans and the quality procedures.
    - Conduct the QC Mechanical reports and prepared. The daily QC records and the finale acceptance documentation as required ;
    - Keep the Site Quality Coordinator and the Construction Superintendent updated of the status of MEP work, related quality issues.
    -Visual inspection, pipe installation demonstration
    - Material receiving inspection and overall HVAC equipments, and pipes
    -Inspection of the HVAC duct installation .Start up, air balancing, duct smoke test .
    -Pre commissioning and commissioning of the HVAC installations.
    -Inspection of the steel pipe, welding demonstration, pressure test
    -Coordinates other disciplines interfaces, like electrical and instrumentation department civil underground distribution and facilities
    Coordinate with studies departments and design office to prepare a necessary drawing or technical specifications documents for inspection
    Prepare a request for inspection RFI; test plants and equipments, incoming material inspection

    Follow site safety rules, practices and assist site team in promoting a culture of the safety in the site participate in the HSE training in the site.

    - Ensure that all Mechanical works are performed in accordance with, the specifications, the approved plans and the quality procedures.

    Keep the Site Quality Coordinator and the Construction Superintendent updated of the status of facility / Mechanical related quality issues
  • NAHRAWESS HOTEL - Technician Chef

    2004 - 2008 2O11 (August) -2012(December): Technician Chef at NAHRAWESS HOTEL and marine Spa in Hammamet AND Sousse;
  • SIGMA - Technician

    LA CHAPELLE SUR ERDRE 2002 - 2003 : Technician at SIGMA engineering; MEP Studies Company in
    Providing all services that may be required for a project

    -Good experience in supervising many construction projects; (colleges, hospitals, and hotels)
    - Ensure all works are done in accordance with drawings and technical specifications
    -Participate to preparing; Design, technical report, system evaluation and budget cost estimating for many MEP projects.
    -Coordination with other sections (Architecture, Structure, Electrical, ULV... ) during synthesis of shop drawings.
    -knowledge in MEP project design; Heating, cooling ,refrigeration and conditioning system s, ventilation systems, air Conditioning systems ,air Filtration, Plumbing and Sanitary Drainage systems, Fire fighting system.
    -High skills in MEP commissioning.
    - Assist Department in conducting regular systems audit.

Formations

  • ISET Nabeul (Menzel Bouzelfa. Nabeul)

    Menzel Bouzelfa. Nabeul 1997 - 2002 Mécanique

Réseau

Annuaire des membres :