Menu

Karima BELKRAOUANE

MOSTAGANEM

En résumé

Mes compétences :
Configuration Management
Quality Control
QHSE Management
ISO 900X Standard
train design
tender documents
technical risk analysis
technical requirements Analysis
regulatory monitoring
low voltage
interpersonal skills
implementation of operational systems and procedur
good communication skills
develop the transport system specifications
System Analysis
Site Quality Management
Rotating Equipment
Risk Analysis
Requirements Management
Requirements Analysis
Quality Assurance
QCD Management
Punch List management
Competitive analysis
Design monitoring
Microsoft Office
Master Scheduling
Insure Quality management
ISO 14001 Standard
Health and Safety
HAZOP
HAZID
Gap Analysis
Design Change Management

Entreprises

  • ENGIE Ineo- Sidi Bel Abbes Tramway Project - System engineer

    2015 - maintenant As a System engineer my mission is to implement and master quality process by
    insuring:
    * Organise and supervise with System Director engineering activities (Signaling, low
    voltage, high voltage,..) according to system engineering V cycle
    * Manage and prepare with Test and commissioning manager the integration and
    validation of test and commissioning activities.
    * Validate with Test and commissioning manager the plans and test procedures of the
    participating subsystems (rolling stock, track, low & high voltage systems, signaling,
    ticketing, AVL-RTPI systems, CCTV, BMS, W-LAN, RADIO, CTM, CCS, OCL, tri colour
    luminous signals ...)
    * Plan and coordinate the site tests of subsystems ;
    * Review consistency between subsystems, system and the project master schedule ;
    * Manage system configuration during the successive project's phases
    * Follow up and monitoring project's interfaces and battery limits
    * Insure Project's change & Configuration Management (from As Designed- As Installed
    to As Built Configuration)
    * Follow up and monitoring engineering documents delivery.
    * In charge of preparing and delivery of Final documentation to client (AS-built
    documents, installation documents, training documents, constructor documents,
    maintenance document,...)
    * Control the technical consistency through a strong interfaces management and quality,
    cost and delays approach.
    * Obtain client satisfaction through requirements management
    * Apply and verify engineering methods and tools ;
    * Manage requirements verification process
    * Insure Quality management ;
    * Insure non-conformities and Punch List management ;
    * Produce competitive analysis and technical risk analysis
    * Manage the integration and validation of test and commissioning activities.
  • Multitec - QHSE freelancer

    2014 - 2014 Achievements and responsibilities:

    1. Outline the approach regarding health and safety for the work as defined in the

    tender documents - outlining how to deal with specific risks and hazards during the
    project (Essentially a preliminary Site-specific Health and Safety Plan)

    2. Prepare HSE process and necessary documents for the contractor's (Multitec) tender

    submission, to fulfill the client's requirements.
  • ALSTOM Transport - Change & Configuration Manager

    2014 - 2015 insuring accuracy and consistency of delivered work products:

    * Control evolution of engineering documentation and verify traceability of evolution
    * Control consistency of the system components and their interfaces
    * Master application of changes to delivered work products ;
    * Control consistency of the physical product with applicable engineering
    documentation
    * Control compliance of delivered work products with requirements
    * Track applied train configuration and issuing configuration baseline at each Gate
    Review
    * Project's Configuration Management (As Designed- As Installed to As Built) ;
    * Monitor design changes along project's life cycle ;
    * Project's Changes & Impacts QCD Management ;
    * Project's Contractual Requirements Management ;
    * Prepare Impacts' technical folders, costs and deadlines.
    * Prepare and manage Project standard's monitoring matrix
    * Prepare provisory project's hand over procedure ;
    * Project's hand over folders monitoring

    Responsibilities

    A. Manage configuration issues during all project phases:
    1. Analyse configuration management requirements from the customer and internally
    from ALSTOM entities
    * Identify work products placed under configuration management from PBS
    (Product Breakdown Structure)
    * Identify configuration items dependencies constraints.

    2. Define, create, publish and establish configuration base lines : Gather and manage

    necessary information from Sub-Systems and suppliers

    3. Establish and maintain project configuration management plan :
    * Apply standard process of involved product line ;
    * Ensure respect of naming conventions and versioning scheme
    * Create the configuration management plan on the basis of engineering
    management plan
    * Consolidate project with sub-projects' configuration management plans
    * Obtain customer approval of the Configuration Management Plan

    4. Interface with CCN PLM concerning project needs in terms of IT tools managing
    configuration
    * Evaluate project needs in term of configuration management tools
    * Provide support to configuration management system users

    B. Manage change requests and related issues during all project phases:

    1. Manages application of standard change management process
    * Before approval of the change order, review Change Requests and assign
    Change Requests to Change Analyst and CCB approval.
    * After approval of the change order, ensure that action plans are built and
    follows then their execution
    * Within the framework of my functions, participate in technical
    consultations, keeps overview of the scope, follow up application of
    changes and ensures REX of modification process application to the owner
    of the process
    2. Coordinate all stakeholders on change issues
    * Interfaces with Sub-Systems and supplier teams in order to analyse impact of
    Sub-Systems changes on train design
    * Informs Sub-Systems and supplier teams about changes decided at integrator
    site.
    * Informs Validation Manager about all changes and follows potential update of
    Validation Plan
    * Coordinates actions among all project stakeholders (Technical team,
    Industrial team, Manufacturing team)
    3. Organize and chair meetings of the Change Control Board
    4. carry out change management activities with respect of QCD objectives, defined by
    the Project Manager
    - Q: Apply as defined, manage risk of deviation ;
    - C: Optimize application, check respect of cost objective with cost manager ;
    - D: Reduce global application time of Change Orders, avoid additional
    delays at consultation, production,

    C. Ensure all necessary information about train applicable configuration is
    available to all project's teams.

    D. Manage Requirements (Responsible of the deployment and execution of
    the Requirements Management process):
    1. Planning and Monitoring activities:
    * Creating and maintaining a Requirements Management Plan
    * Deploying an operational Requirements Management System
    * Evaluating people skills and their involvement in the process
    * Monitoring and controlling activities and evaluating process performance.

    2. Requirements collection and identification activities:
    * Capturing requirements ;
    * Identifying and characterizing requirements.
    3. Requirements clarification: Getting a common understanding between
    Requirements Provider and Receiver.
    4. Perform requirements analysis, development and allocation activities:
    * Make a gap analysis, impact and risk evaluation ;
    * negotiation between Requirements Provider and Receiver
    * Requirements' creation and modification, and maintenance of the traceability.
    5. Requirements verification and validation: Checking requirements phrasing,
    completeness, consistency, traceability, coverage, and implementation.
    6. Managing requirements configuration and change management activities (manage
    changes on Requirements Management configuration items all along requirements
    development and allocation, from project level to lowest levels).
  • KCA DEUTAG - QHSSE and Training Coordinator

    2014 - 2014 Achievements and responsibilities:

    1. Directing & Coordinating Quality, Health Safety & Environmental activities in

    accordance with KCAD QHSE Management Systems

    2. Monitor compliance against the monthly HSE/ Training schedule.

    3. Oversee implementation and training of operational systems and procedures.

    4. Demonstrate & promote safety leadership.

    5. Ensure all rig personnel understand & comply with KCAD Quality and HSE

    requirements.

    6. Lead HSE Trainings

    7. Advise all rig personnel on QHSE matters.
    8. Provide QHSE support on site as required.
  • Saipem - Mechanical QHSE Engineer

    Montigny-le-Bretonneux 2011 - 2013 (INTERNE) in SAIPEM Arzew Project (LNG-3 Construction Plant) in the
    framework of courses taken for the Quality, Health, safety and Environment Master coorganized by Saipem/Eni and Oran University of Science and Technology - Mohamed
    Boudiaf

    Roles and responsibilities:
    - Assist mechanical erection inspections ;
    - Assist functional tests during pré-commissioning, commissioning and start-up of
    mechanical rotating equipments.
    - Perform HSE inspections for mechanical works.
  • ENIE - Mechanical Engineer Trainee

    Lyon 2010 - 2010 perform mechanical repairs at machining tools in the workshop

Formations

  • ENI Corporate University - IGCMO (Oran)

    Oran 2011 - 2013 Mechanical QHSE Masters Degree

    this Master was to provide both of professional skills and academic education


  • Djillali Liabes University (Sidi Bel Abbes)

    Sidi Bel Abbes 2008 - 2011 Bachelors Degree

    Mechanical Engineering Bachelor Degree majored in Energetics and Environment.
  • Abdelhamid Ibn Badis University (Mostaganem)

    Mostaganem 2004 - 2009 Bioengineering

Réseau

Annuaire des membres :