Menu

Lazreg BACHIRI

Paris

En résumé

Mes compétences :
Automaticien
Instrumentiste
C Programming Language
Audit
Telemetry
TETRA
Synchronous Digital Hierarchy
Siemens Hardware
Quality Management
Quality Control
PAGA
PABX
P&ID
Natural Gas
Microsoft Word
Microsoft PowerPoint
Microsoft Outlook
Microsoft Excel
Matlab
Intrusion Detection System
Hipot testing
Good computer skills
Fire & Gas
FORTRAN
Engineering, Procurement and Construction
Diesel
CCTV
C++
BSI

Entreprises

  • Technip - Instrumentation & Control system Inspector

    Paris 2014 - maintenant Client: SONATRACH ``Engineers India Ltd (EIL) PMC''
    Project: Algiers Refinery Rehabilitation and Adaptation Project
    Location: Sidi Arcine, El Harrach, Algiers, Algeria

    Responsibilities:
    * Preparation of Quality Control Plan (QCP). ;
    * Coordination with client, vendors, subcontractors, third party inspection for material approval,
    design approval, billing certification.
    * Received RFI for Inspection from the Construction. ;
    * Review and check the P&ID drawings, the attached documents as per standards and
    specifications......etc.
    * Ensure that installations are in accordance with drawings, specifications, supplier
    requirements and applicable codes and standards (IEC, BS) and that any changes are properly
    managed and documented in accordance with project procedures.
    * Witness and acceptance of installation and functional test activities as required by inspection
    and test plans to provide owner assurance over E&I completion and commissioning activities.
    * Assure that contractors are following vendor and best industry standards (SAT) for precommissioning and commissioning for all systems.
    * Raise Site Queries and Non-Conformance (Root cause analysis) Reports in accordance with
    project procedures and verify physical close-out of Site Queries, Non-Conformance Report
    and Punch Items.
    * Participate in punch-out of systems as part of completions and hand-over process.
    * Review Instrument and System Completion documentation to ensure completeness
  • Saipem - Instrumentation & Control system Inspector

    Montigny-le-Bretonneux 2013 - 2013 Client: SONATRACH
    Project: LNG Arzew - GNL3Z
    Location: Arzew, Oran, Algeria
    Project Scope: EPC contract (engineering, procurement and construction) for a natural gas
    liquefaction plant (LNG). It includes the construction of 09 Process Unit, Offshore Flare, Jetty and
    breakwater, Loading Arms, BOG Compressors, LNG, LPG and Butane Tanks, 16 Buildings and
    over 600 equipment's (Mega Train).
    Responsibilities:
    * Plan, organize, control and execute all works in accordance with Quality plans and
    documented procedures.
    * Record by means of the applicable ITP and relevant forms, all inspection examinations and
    test required with approved procedures and Engineering documents.
    * Know and ensure the control and calibration of equipment's and tools and measuring device
    for test inspections and measurements.
    * Visual and dimensional inspection for direct mounted transmitters, control valve, and primary
    flow elements.
    * Functional test and calibration for switches, E/P transducers and converters, pressure and
    temperature gauges, temperature and pressure transmitter, and miscellaneous transmitters.
    * Insulation and continuity checking for underground cables, main and secondary cables, heat
    tracing cables and grounding networks.
    * Performing the pressure testing and lines blowing of process piping, control valves pneumatic
    circuits.
    * Final installation inspection for different types of instrument and control valves.
    * Calibration and field installation inspection for safety relief valves and motorized valves.
    * Performing the loop checking for all type of electronic transmitters, switches, valves and
    temperature elements.
    * Site acceptance test and functional check for automation systems and consoles.
    * Recording systematically the non-conformity reports issued on site and checking that the
    settlement of non conformities is in accordance with the site requirements.
    * Review of all instrument accepted documents such as Instrument data sheet, Instrument and
    Piping diagram (P&ID), instrument loop diagrams and vendor drawings with latest revisions
    * Reviewing all quality control inspection report documents signed by QC inspector and client
    representatives.
    * Inform systematically to the QA/QC Manager on the progress of the field quality verification
    and inspection activities and assist in preparing the supporting quality documentation required
    to issue the mechanical completion certificate and loop release.
    * Responsible for punch list clearing to ensure that the installation of instruments are complete
    and accepted by the client.
    * Preparation of pre-commissioning activities for handover of packages and sub-system.
  • Invensys - Electrical & Instrumentation Supervisor

    Cergy 2012 - 2013 Client: SONATRACH
    Project: Telemetry project Hassi-Messaoud 750 wells
    Location: Hassi-Messaoud, Algeria
    * Installation of tubing and fitting ;
    * Installation of instrument (PT, PDT, TT, FT.......) ;
    * Installation of Intrusion detection system ;
    * Installation of RTU SMAR DFI302 and SCADA P6009 system,
    * Fixing the orientation of the tetra antenna and solar panels
    * Instrument Loop check
    * Power on the system ;
    * Test and pulling instrumentation and power cable ;
    * Programming different spots of construction activities
  • Saipem - Instrumentation & Control system Inspector

    Montigny-le-Bretonneux 2010 - 2012 Client: SONATRACH and ENI
    Project: Gas Treatment Unit MLE (Menzel Ledjmet East)
    Location: Hassi Messaoud, Algeria
    Project Scope: The MLE project includes mainly the construction of 24 oil/gas wells, 6 gas
    gathering Manifolds; a Central Processing Facility (CPF), including sales gas compression, LPG
    recovery, oil and condensate stabilization products storage and pumping system, associated utilities
    and 4 export pipelines for sales gas, LPG, condensate and oil.

    Responsibilities:
    * Deals with reviewing of all ITP's/QCP/Method Statement/ Material Approval prior for project
    plan preparation.
    * Able to analyzed every area to be survey and witness prior for RFI to be offered to the main
    client for inspection.
    * Assigned to witnessing repair and calibration of instrumentation.
    * Analogue and digital controllers Fire & Gas detection/protection systems,
    * Project Duties included review of loop folders for final acceptance by the QA/QC Dept.
    before transferring to Commissioning.
    * Subcontractor On-site audits. ;
    * Followed all safety practices and procedures and corrected unsafe work practices

Formations

  • University Of Science And Technology Of Oran Mohamed Boudiaf (Oran)

    Oran 2005 - 2010 Diploma

    End of study project:
    Creating & editing Logic Program of PLC SIMATIC S7-300 (SIEMENS) using
    Step7 and the supervision with WINCC to control clinker burning workshops

Réseau

Annuaire des membres :