24 ans d'expérience dans l'industrie.
- Ingénierie/Bureau d'études
- Commissioning & Start-up.

- Pétrole/gas

-Centrale thermique, usine incinération

-Chaudiéres

-Nucléaire

J'ai aussi réalisé des devis/chiffrages ainsi que des commandes et suivi de différents sous traitants.

Je travaille principalement en anglais.

J'ai l'habitude de voyager.

Engineering, commissioning and start-up

Oil & Gas
Steam Generators ( boilers)
Electric power plant
Nuclear

Mes compétences :
Control System
Ingénierie
Nucléaire
Offshore
Onshore
quotation
Start up
Supervision
Gestion de projet
Thermique
Environnement
Automation and control

Entreprises

  • PARIFEX - Control Engineer

    maintenant Total E&P Angola FPSO CLOV Deep Development Project – 2011

    Total E&P Nigeria Limited FPSO USAN Deep Development Project – 2009 -2010

    TOTAL E&P ANGOLA FPSO GIRASSOL – Water Injecton Project – January/ 2009

    Total E&P Angola FPSO PAFLOR Deep Development – 2008

    SONANGOL P&P PLATFORM PAL P2–2007

    TOTAL LUSSAGNET (FRANCE)–Revamping of boilers & Glycol – 2007

    TOTAL YEMEN YLNG Project –AMEC SPIE – 2006

    QUATAR GAS II LNG Project –TECHNIP – January to December 2005
    Functional analysis (450 P&IDs and 10 000 I/O).
    Participation to HAZOP & P&IDs revues
    Velocity Approach Meter System specification
    Requisition for inquiry
    Analysis of technical offers
    Technical Bid Tabulation
    Technical Bid Evaluation
    Clarifications Meeting with vendors.

    EXXON FPSO ERHA Project – SAIPEM – March 2003 to December 2004
    Team leader
    Topside & Hull PCS-PSS functional analysis
    P&IDs review
    Assistance F.A.T
    Follow-up, Punch list and weekly meeting management

    TOTAL SOUTH PARS 2 & 3 – TECHNIP - July 2002 - December2002
    Facility B and Dalan Gas treatment Facility A projects:

    Modification of I.C.S.S Architecture
    Modification of existing Telecommunications Architecture
    Control philosophy
    Specifications for DCS, ESD and F&G (YOKOGAWA)
    Telecommunications Specifications
    Requisition for inquiry.
    I/O &, serial link, package list

    ALTOSM POWER BOILER – February 2001- march 2002
    Waste energy plant project (France):

    One line diagram HV/MV/LV
    I.C.S.S Architecture
    Control & instrumentation Specifications
    Piping &instrument diagrams
    Power balance
    Electrical consumer, instruments, I/Os, serial link List etc
    Layout I.T.R, C.C.R and Electrical Room
    General Routing
    Requisition for inquiry.

    C.I.A.C Cogeneration Project – September 2000 - November 2000

    Electricity & Control system supervisor on cogeneration plant (team leader)
    TAG, Post-combustion Boiler & Utilities.

    GEOSTOCK -Revamping project- ALSTOM / EBIM. April 1999 - May 2000
    System Architecture
    Functional analysis
    Typical
    System Programming (PLCs Schneider)
    FAT
    Pre-commissioning, commissioning & Start-up
    Training of operators, technicians and engineers.

    SENELEC (SENEGAL) – ELECTRICAL POWER - MONTALEV December 1997 - March 1999
    Pre-commissioning & commissionin

Formations

Pas de formation renseignée