Certified project manager with solid experience in industrialization and mechanical processes.
Mes compétences :
Aéronautique
Composites
matériaux
Matériaux composites
Mécanique
Entreprises
ALSTOM GROUP
- Sub System Manager via Akka Technologies
Saint Ouen2013 - maintenantProject components : 240 bogies in service and 5 replacement bogies
Concerned elements : connecting rod, bearing box, frame, cross-beam and occasional parts
Background : the 245 bogies of the Lyon and Nantes Tramways/Trains had several elements to be replaced due to defective design.
The project consisted of determining a plan for continuous exchange of bogies between the Alstom and the SNCF sites. Each batch of bogies is fitted in Alstom site on a new production line. The concerned elements are either replaced or controlled by specific process.
Achievements :
Creation of a new production line of tramway/train bogies for retrofitting
Production management
Planning establishment
Cost control
Writing of specifications for subcontracting and services
Supervise the transportation of the bogies between Alstom and the client sites
Write quality documents related to the bogies
Installation of a new system of bogie oil circuit decontamination
Establish and secure the working site process.
ALSTOM GROUP
- Quality inspection : Citadis tramway projects via Akka Technologies
Saint Ouen2012 - 2013Work in the quality department on 4 CITADIS tramways projects for the following cities :
Tours (21 trains with 7 wagons)
Rouen (27 trains with 7 wagons)
Le Havre (22 trains with 5 wagons)
Casablanca (74 trains with 5 wagons)
Achievements :
Ensure the quality of the entire production line :
Establishment and update of the Non Compliance Reports (NCR) state of each train
Supervise quality inspectors on the non compliance observation and their curative
Follow of the advancement of the curatives with the person in charge
Follow of update and closure of NCR in SAP system
Ensure the success of the different steps :
Ensure that all NCR that could block electrical tests have no curative actions
Supervise the NCR procedure (after tests)
Give the final state for the Manufacturer Delivery Document
PSA Peugeot Citroën
- Planning & cost control manager via Akka Technologies
Rueil Malmaison2011 - 2012Second part of the project inside the welding shop department :
An industrial phase following by the final mounting of the production line in the PCMARus plant in Russia with : transfer of the equipment, their assembly, settings, production tests and increase of production rate.
PSA Peugeot Citroën
- Planning & cost control manager via Akka Technologies
Rueil Malmaison2011 - 2011First part of the project inside the welding shop department :
A body in white phase of the production line in Sochaux including : the assembly, settings, and the production tests.
Achievements :
Planning function :
Creation and management of the Pre Series Vehicle production planning :
Creation, update and application of the required documents during the body in white phase in Sochaux (France)
Production management and monitoring of the deliverable bodies for painting department
Monitor the delivery of parts for the line tests
Monitor the construction line progress in accordance with the different steps (production agreement document, delivery agreement document, switch over agreement).
Lead the delay management :
Update and monitor the global project planning with MSProject
Supply the parts needed for the settings phase
Monitor the suppliers payments.
Synthesis function :
Creation and update of a synthesis file including project indicators (deliveries indicators, technical improvement, quality, and production).
Costs function :
Lead the cost estimates synthesis (Investments ; expenses ; hazard costs)
Investment plan
Project investment application
Aernnova ICSA
- Stagiaire fin d'étude : ingénieur de production
2010 - 2010Composite material parts production and quality management :
- Composite material parts production management for A320, A340 and A380 projects
- Process improvement
- Defects analysis and improvement proposal to the client (Airbus)
- Respect of Lean Manufacturing
Accomplishment : decrease of raw material waste
Formations