Menu

Mohamed Amine HACHEM

En résumé

To evolve in a professional environment favoring competence and intellectual abilities of people and which offers a motivating work place and encouraging work atmosphere, have a professional conscience and listen to the people around you

Mes compétences :
Soudage
Pompe
PWTH
Ingénierie
CND
Contrôle qualité
Inspection
API
ASMI
Piping
Turbine à gaz
Gaz naturel
Turbomachines

Entreprises

  • Sonatrach - Mechanical engineer (static equipment and piping)

    2017 - maintenant Project Rehabilitation & Adaptation Project Algiers Refinery, Algeria:
    •Inspection of the work and followed by requests for inspection (RFI).
    •Supervisor of prefabrication and erection piping and supports and thermal insulation
    •Supervisor of hydro testing of pressure vessels and piping (Test-pack).
    •Answer technical questions (TQ) following the Standard and Standard.
    •Construction of Italian brand cylindrical and cabin furnaces (ITT) according to API 560.
    •Construction of steam boilers and heat recovery brand (MACCHI & THERMAX) according to ASMI I.
  • Sonatrach - Mechanical engineer (static equipment and piping)

    2013 - 2017 Complex of Treatment and Liquefaction of Natural Gas LNG 1/Z, Algeria:

    •Renovation of piping lines according to BECHTEL Specification (Nuance and welding procedures) Job-Leader.
    •Preparation and supervisor of regulatory inspections on pressure equipment (reprobate or derogations) with the mining engineer or API 510.
    •Supervise repairs on static equipment according to ASMI PCC II.
    •Knowledge of different types of Non-destructive control (NDT), but without qualification certificate.
    •Acting as Static Mechanical Service to plan and execute maintenance work.
    •Team Leader (Job-Leader) composed of Pipefitters, Welders and Boilermakers for construction or maintenance work.
  • Sonatrach - Engineer Quality Control (QC)

    2010 - 2013 Complex for the treatment and liquefaction of Butane and Propane LPG 2/Z, Algeria:

    •Supervise the assembly work of rotating machines pumps (Flow serve, Ebara) according to API 610 and compressor (Dresser, York and Atlas Coopo).
    •Systematic reviews of SULZER S1 turbines with two shaft lines.
    •Renovation of the three combustion chambers and their ignition and combustion system of the three SULZER S1 turbines with Man Turbo
    •System installation of detection and extinguishing by CO2 in a power station 5.5 Kva with DESAUTEL.
    •Rehabilitations of two tanks of 75000 m3 sandblasting and painting.
    •Establish construction inspections according to the Quality Control Plan (QCP)

Formations

Pas de formation renseignée

Réseau

Pas de contact professionnel

Annuaire des membres :