Menu

Mohsen SAVARI

LÉVIS

En résumé

Mes compétences :
Welding
Procurement
Microsoft Project
Master Scheduling
Installation and Commissioning
Generators
multidiscipline construction coordination
excellent leadership skills
Support Project Management
Rotating Equipment
Primavera P6
Pigging Operations
Oil Terminals
Oil Refineries
Microsoft Word
Microsoft Excel
Master Planning
Job Skills
Heat Exchanger
Ferries
Cranes
CATIA

Entreprises

  • Chantier Naval de Davie ,Canada - Planing Lead(Resolve project)

    2016 - maintenant Container Ship Conversion
  • Chantir Naval de Davie .Canada - Planning Lead(STQ Dual Fuel Ferry Project)

    2013 - 2015 * Prepared Project master-schedule and production master schedule for construction of 2x3000T ferries ( 92 m long ). ;
    * Prepared work breakdown structure and estimation of required resources and budget for production's work-stations and construction activities(Level 3 & 4).
    * Estimation of duration of activities in different disciplines.(steel Fabrication ,block assembly ,blocks erection, piping works, equipment installation, electrical and painting ).
    * Prepared work-packages and work-orders and assisted in preparing construction strategy.
    * Prepared required manpower S-curve and analyzed schedule deviations and prepared corrective actions.
    * Calculation and analysing of Earned Value , Cost and Schedule Performance (CPI ,SPI).
    * Defined progress reporting procedures for different disciplines to have correct and precise reports .
    * Prepared progress reports by aggregating different discipline's progress.
    * Support Project Management team . ;
    * Prepared procurement plan based on construction master schedule and technical requirements.
  • STEAM engineering & industrial company - Project Site Manager

    2009 - 2010 * Did Installation of Equipment such as Loading Arms, Hose Tower, Pig Launchers &receiver and as well as piping and electrical work in Bandar-Imam petrochemical complex liquid export jetty Project (26 M $) .
    * Engineered and constructed temporary construction facilities including buildings, construction and heavy haul roads, temporary utilities.
    * Monitored and followed safety policies for direct hired and subcontractor staff.
    * Organized site activities in piping, mechanical installations and electrical works.
    * Prepared construction master Schedule with MS Project . ;
    * Revised QC documents, turnover in each stage to client for verifications. ;
    * Identified heavy lift requirements. ;
    * Conducted commissioning of pipelines (pig launching, flushing and hydro-test).
    * Conducted preparation of punch list and turnover documents to client (QC final book and as-built drawings).
  • FNP Co. - Project Manager

    2004 - 2009 * Finished 3 PC projects (procurement and construction) as contractor.
    * Procurement ,Construction and commissioning of underground natural gas 8 , 12 inches pipeline .
    * Performed overhaul maintenance(shutdown/turnaround) in Sulphur Recovery and LPG units of Tehran oil Refinery including amine Towers ,Heat exchangers, Cooling fans, Valves and Drums.
    * Piping of Off-site area(tank farm)pipe lines variable size up to 40 inches South Pars Gas Refinery ($ 1.2 M)
    * Conducted project execution in all phases from bid package preparation to final tests and hand over.
    * Directed the performing of pipeline hydro test, pig launching, flushing, Hot tap and gas injection.
  • Iranian Offshore Oil Company - Mechanical Engineer

    2004 - 2004 * Reviewed data sheets, scope and spec of Heat exchanges and vessels as well as estimated
    * material requirements for subsea pipelines and NGL plants of Associated Gas Gathering Project South of Iran (2b$).
  • STEAM engineering & industrial company - Field Engineer & Construction Coordinator

    2000 - 2004 I got appreciation letter from client for on-time commissioning of Powerplant.
    I got appreciation letter from Elin Company for excellent cooperation in construction of MES Powerplnt.
    * Hands-on lead and responsible for assembly and commissioning of 8 X 250 MW turbine, draft tube and generators in Hydro- Electric power plant Under Supervision of ELIN ( ANDRITZ) Company for Generators and VOITH HYDRO for Francis type Turbines.
    * Supervised and conducted the assembly and alignment of Rotor and Stator as well as lower / upper bearing .
    * Conducted Rotor and Stator Stacking and Winding. ;
    * Conducted Assembly of Bearings and Shafts. ;
    * Conducted Run-out Check and alignment Of Turbine and Generator shafts. ;
    * Supervised and provide QC plan and procedures. ;
    * Provided WPS(Welding procedure spec.) for Welding of Upper and Lower Fans.
    * Conducted Heavy lifting and Installation of Rotor( 502 T each) and lower and Upper Bearings brackets.
    * Conducted piping of the utilities(compressed air brake system, HP hydraulic system , cooling water piping and CO2 fire-fighting piping).
    * Collaborated in commissioning of all units.( Rotor balancing , exciting systems ,piping systems).
    * Developed Liaison between different stakeholders of the project (Client ,Turbine and Generator vendor supervisors) .
    * Prepared project master schedule (WBS) ,weekly and monthly progress reports for client and director. ;
    * Monitored and controlled Cost of project ,Quality and Time constraints.
  • IRAN Shipbuilding & Offshore Industries Complex Co. (ISOICO) - Field Project Engineer

    1998 - 2000 Iranian Shipbuilding and Offshore Industrial Complex

    * Performed the installation and commissioning of equipment and machineries including jetty gantry crane, oxy-fuel and plasma steel sheet cutting machines, compressed air system & oxygen and Acetylene plants.

    Selected Achievements
    * Appreciation letter for on time finish and commissioning of MES hydro- power plant issued by client-FARAB company-Iran. ;
    * Satisfaction letter for On-time finish of 3 units overhaul issued by Client -Tehran oil Refinery. ;
    * Satisfaction letter for piping of refinery off site (Tank farm)area. ;
    * Satisfaction letter for preparation of QC documents for two phase well-head facilities installation project.

Formations

  • Université De Montréal - Ecole Polytechnique De Montréal (Montréal)

    Montréal 2012 - 2012 BSc
  • Mc Gill University (Montréal)

    Montréal 2010 - 2011 Project Management
  • Amirkabir University Of Technology (Tehran)

    Tehran 1992 - 1997 AÉROSPATIAL

Réseau

Annuaire des membres :