-
CHEMONICS EGYPT
- Supervisor Construction Manager
2009 - maintenant
Construction Management - Perform a technical, organizational and supervisory role on the project. Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems. Responsible for site security, health and safety, and supervision of materials. Acting as the main technical adviser on the construction site for subcontractors, crafts people and operatives. Liaising with the local authority to ensure compliance with local construction regulations and by-laws. Resolving any unexpected technical difficulties, and take actions to deal with the results of delays, bad weather, or emergencies at construction site. Preparing weekly project status report. Inspect and review projects to monitor compliance with construction safety codes, and other regulations. Schedule the project in logical steps and budget time required to meet deadlines. Prepare Bids Studies, Technical Submittals, Execution Method Statement, And Commercial Clarification Submittals. Participate in contract negotiations. Plan, Schedule, follow-up, Cost Control, the entire company project. Participate in Dispute & Claims preparation, technical, finance and submittals.
-
ARABTEC Construction, L.L.C. Dubai, UAE.
- Senior Project Engineer
2007 - 2009
Construction Implementation - Supervisor of construction and finishing work of multistory car park "A" with space for more than 5,000 vehicles, 140,000 square meters, and 9 levels.
-
ARABTEC Construction, L.L.C. Dubai, UAE.
- Project Engineer
2006 - 2007
Construction Implementation - Supervisor of finishing work of multistory car park with space for more than 2,500 vehicles, 75000 square meters, and 5 levels.
-
ECC-Development (Lift Slab Misr)
- Construction Manager
2002 - 2006
Construction Management - Plan, direct, coordinate, budget, usually through subordinate supervisory personnel, activities concerned with the construction and maintenance of structures, facilities, and systems. Participate in the conceptual development of a construction project and oversee its organization, scheduling, and implementation.
-
Egyptian Arab Contracting – EAC.
- Projects Engineer
1989 - 2002
Construction Management - Prepare technical proposals. Participate in interview presentations. Plan, Organize, Direct, Execute, and Control project team activities. Define project scope, budget, and schedule. Review and / or supervise technical aspects of work. Primary responsibility of quality control and client contact. Set goals and evaluate staff performance. Serve as a resource and mentor to less experienced staff members. Commit resources of the firm issuing start and stop orders relating to the project progress and clients directives within contract requirements.
-
Egyptian Arab Contracting – EAC.
- Resident Site Engineer
1987 - 1989
Construction Implementation - Prepare the necessary designs and plans of the new pipelines routes to permit a perfect connection to both the existing sewer system and existing pumping station and to allow for future expansions. Diversion of all utilities located within working area. Construction of two sleeve tunnels crossing under King Faisal road with diameter 2900 mm and a total length of 139.5 m, using unbolted tunneling technique, to act as a sleeve enclosing the new Force Main and Gravity lines. Install of 790 LM. Lined steel and ductile iron pipes with 450 mm, 900 mm, and 1000-mm diameters, inside the two sleeve tunnels. Construction of 1200-mm dim., pipe jacking, is crossing under the gravity lines. Install of 1500 LM. Ductile iron pipes with 1500-mm diameters. Execution of jacking & receiving shafts, by employing the shaft sinking technique. Execution of all deep de-watering activities. Execution of the required R.C. valve chambers and manholes, all.
-
Egyptian Arab Contracting – EAC.
- Site Engineer
1985 - 1987
Construction Implementation - Execution of jacking & receiving shafts, by employing the shaft sheet pilling technique. Execution of all deep de-watering activities. Execution of the required R.C. valve chambers and manholes, all.
-
Egyptian Engineering Armed Force
- Lieutenant Reserve Officer
1982 - 1985