-
SAIPEM Contracting Nigeria Limited
- Engineer
2013 - 2016
* Installation Aids reports preparation (sea fastening structure check, grillage, barge deck check, hand calculation (API RP 2A, AISC,...) , for many structures (buoyancy tank, foundation, system O...)
Offshore Structural Lead - system F & G (Flowline & Gas) + Lead structure system R (Riser) Water injection
Projet offshore : EGINA - (Nigéria)
* Verification of all calculation reports and drawings issued by Engineers and designers on the two SHR subsystems which I am in charge (System F&G and System R)
* Designed Structure are as following: Production Flet, Water Injection Flet, gas Export Flet, PLEM, PWMD, LBMS, System R Top assembly water injection, System R bottom assembly water injection.
* Management of 15 engineers Nigerians in Lagos (follow up of engineering calculations, checking of all issued reports, technical support, make all necessary data available, respect for deadlines).
Reports issued for the system F & G:
* 1. Plem In-service report (In-place phase, retrieval) ;
* 1. Plem Pre-service report (Lifting in air, lowering in water, transportation phase)
* 1. Plem local check (Padeye check, Articulation Yoke check, Buoyancy yoke padeye, Lifting padeye,mudmat deployment analysis, mudmat rotating system, mudmat locking system, mudmat wing stopper, snagging loads, hub support, valves support, ROV Docking beam, launch trolley interface,...)
* 1. LBL (Long Base Line) array Frame design report ;
* 1. Flet In-service report,
* 1. Flet Pre-service report,
* 1. Flet Local check ;
* 1. LBMS and PWMD design reports (Lateral Buckling Mitigation Sytem and Pipe waking mitigation device)
* 1. System F&G -Production, WI, GE Flet & ITA Anchor point Design report
The following phases are studied: Lifting in air, lifting in water, installation, upending, sac bending 0° & 45°, In-place, Retrieval, transportation (Sacs members unity check, joint transfer load and strength 50% check)
* 1. PLEM and Flet Requisition
Reports issued for system R:
* WI-TA In-place report ;
* 1. WI-BA (Water Injection bottom assembly) In-place report
* 1. WI-TA (Water Injection Top assembly) Installation report
* 1. WI-BA Installation report ;
* 1. WI-TA Miscellaneous report (vérification des padeye, gutter, upper connection,...)
* 1. WI-BA Miscellaneous report (vérification du hub support, padeye)
* 1. WI-BA Gooseneck analysis ;
* 1. Prod, WI, GE, TA & BA Lifting and transportation report ;
* 1. WI-BA Riser connection report ;
* 1. WI-TA Riser connection report (TJB, sleeve and plated components check)
* 1. WI TOP Assembly- Clamping system analysis report (check en static et fatigue )
For fatigue case, the following scenarios are studying:
* Thermal fatigue
* Wave fatigue
* VIV Fatigue
* Verification of Water injection top and bottom assembly drawings
* 1. Preparation and verification of requisitions, correction of weight control report
* 1. Answering Requests and issues from Fabrication Yard. ;
-
SAIPEM
- Offshore Calculation Engineer
Montigny-le-Bretonneux
2008 - 2013
Project offshore: USAN - (Nigeria)
Achievements:
* SACS Modeling and reporting design of Top and Bottom Assembly, calibration of mass, COG, buoyancy.
* Static studies and reporting design of the Top Assembly and Issuing corresponding calculation report.
* Static and Fatigue studies and reporting design of the TA and BA connecting piece and issuing the corresponding calculation report.
* Static and Fatigue studies and reporting design of the TA and BA upper connector and issuing the corresponding calculation report.
* SACS Modeling and reporting design of : PIP - SHR TOP ASSEMBLY LIFTING &
* TRANSPORTATION ANALYSIS REPORT (design loads in empty & flooded condition, padeye calculation, lifting & upending, transportation)
* Development of fatigue method of calculation (data from Global analysis, SCF, curve S_N, delta stress) and calculation of damages and reporting.
* Structure design, report, updating report and answering company comments. ;
-
Aluminum
- MTO engineer
2006 - 2007
NKM NOELL Special Cranes
Confirmed structural
Project: production
* Lifting bridge and opening of containers (project 24501) ;
* Container turnover, (project 24502)
* Mobile beams (project 16068) ;
* Specific machines (rods, carbon, ovens) (project 24505)
Achievements:
* Drafting of the technical documentation (Nomenclature, plans of installation and operation of machinery, maintenance)
* Several software developments in visual basic for the nomenclature of important machines management (management of the nomenclature, mass, common pieces, details of each component...)
* Drafting of control quality plans of many machines, realization of a software for price assess of a conveyor ;
-
Aircel
- Engineer aeronautique
Gurgaon
2005 - 2006
: Aerospace project A380 - TRENT900 - TR & FFD
Achievements:
* F.E Modeling and static study of Rod R1_R2 LINKS ;
* Drafting of several certification files:
* R1 & R2 LINK & R1 - R4 pins TRENT900 TR & FFD in static ;
* R1 & R2 LINK TRENT 900 TR & FFD in FATIGUE ;
* R1 - R4 pins TRENT 900 TR & FFD in FATIGUE ;
* Commenting several calculation files written by the subcontractor AerMACCHI on certification records of TRENT900 records
* Answers to Aircraft maker AIRBUS questions on several calculation file on the TRENT 900
Aeronautic confirmed Engineer
Project A380 - GP7200 - TR & FFD
Achievements:
* Modeling E.F and static study of the PRD - 6O'clock BLOW OUT COMPOSITE PANEL DOOR
* Modeling carried out in both closed - door configurations door open
* Modeling is performed for the monolithic element QUAD areas and the nida nutrient HEXA (element TRIA not tolerated in the model)
* Writing certification for 6 O'clock BLOW OUT COMPOSITE PANEL DOOR - GP7200-TR, cable fitting, Latch, Goosenecks, Lugs, pins, Fasteners,... (160 pages).
* Drafting of several certification files (12 files of certification concerning several sub structures):
* R1 & R2 LINK & R1 - R4 pine GP7200 TR & FFD in static ;
* R1 & R2 LINK GP7200 TR & FFD in FATIGUE
* R1 - R4 pine GP7200 TR & FFD in FATIGUE ;
* Comment on several calculation files written by the subcontractor AerMACCHI on certification GP7200 records
* Answers to Aircraft maker AIRBUS questions on several calculation file on the GP7200
Aeronautic confirmed Engineer
Project: Project TRENT900 - Mission in Italy at AerMacchi location
Achievements:
* The transitional efforts (Transit Load) processing and analysis of their impact on certification (MS and RF values). ;
-
Euro Engineering
- Ingenieur structure offshore confirme
2005 - 2016
-
Peugeot Citroen
- Ingenieur recherche et developpement
Москва
2004 - 2005
Responsible of research and development activity
-
PMTC
- Structural Lead manager of vehicle equipment
2001 - 2004
Innovation in the research and Development Department.
Achievements:
* Participation in the definition of the 2-wheels vehicle. ;
* Sizing of braking and suspension system ;
* Numerical simulation of different brake systems ;
* Study of a new suspension (all rubber) ;
* Development of a model to predict the road behavior of a new vehicle. ;
* Technologies implemented: RDM, finite element calculation ;
* Patents on several products (anti-theft...)
Technical environments:
* NASTRAN, PATRAN/IDEAS, ADAMS, MATLAB ;
-
Ségime
- Engineer
2000 - 2001
Project: objective evaluation of the drivability and behavior of a vehicle
Achievements:
* Definition of influential parameters on the drivability of a vehicle (brake pedal effort, racing brake pedal, brake pressure, acceleration, lateral acceleration...)
* Formulation and translating these measures and parameters values in mark witch scale with max value=10. (value/10) ;
* Participation in the realization of road tests ;
* Software development for exploitation of the results of the various measures. ;
-
PEUGEOT S.A
- Mechanical Engineer
Paris
1996 - 2000
Project: Industrial doctoral thesis: analysis and corrections of a model finished a load floor
Achievements:
* Correction and updating of Finite Elements models by substructuring. (Correlation calculation - Test and measurement of the structure Answer)
* Measurements of the dynamic behavior of the structure (application of forces and measurement of displacements at chosen points on the structure).
* Measures of the forced structure answer and deduction of own structure modes and frequency in the frequency band [0-150 Hz]), application scanning sinus as efforts, and smart choose of the measurement points.
* Demonstration of the difference between the measured and calculated vallues using the measurements and finite element calculation responses
* Structure meshing using methods of sous-structuration. ;
* Location of areas with a dominant defect (Fixed points, junction between substructures, thickness, stiffness of the substructures, the overall mass, rib...)
* Proposal of adapted physical corrections on (thickness and stiffness)
* Development of new methods of condensation and substructuring which are more suited to industrial structures.
* Development of graphical software friendly user interface with Matlab in interaction with Nastran for the F.E.M correction of industrial structures (enter measurements, choose from a list of proposed areas with dominant defects, automatic calculation.
Technical environments:
* NASTRAN, PATRAN, IDEAS, MATLAB
// Graduates
-
engineering school
- Mechanical Engineer
1995 - 1995
ENSMM - National high engineering school of mechanic and Micro technique
Of Besançon (France)
Ecole nationale supérieure de Mécanique et des Microtechniques de Besançon
Option Mécanicien