Orchidea BRIGATO

BUC

En résumé

Pas de description

Entreprises

  • Saipem sa - Paris - Project Planner

    2011 - 2012 2011-Today Inatis

    Project Planner: Logic network development, Progress tracking and Reporting

    Project: Natural gas liquid extraction and oil separation Hassi Messaoud ZCINA for SAIPEM SA Offices c/o Saint Quentin en Yvelines (France).

    I am the lead planner of the project, my duties includes: expand and develop the existing schedule, develop a new schedule for commissioning, prepare and present detailed planning information (Gantt charts, histograms, PERT charts, Baselines Schedules, S Curves & Progress reports) and apply performance analysis. Develop, maintaining, and analysing critical path plans. Create work breakdown structures suitable to the programme of work. Constant collaboration with the site to ensure reliability of the schedule and to monitor the progress. Integrate Engineering Procurement Construction and Commissioning data in an organic schedule. Maintain progress data, produce weekly and monthly reports. Constant collaboration with the top management to produce project summaries and progress analisys
  • GENERAL ELECTRIC - ENERGY - Belfort,Fr - Project Planner

    2008 - 2010 2008-2010 Wide Control

    Project Planner: Logic network development, Progress tracking and Reporting

     Projects: Engineering Procurement and Realisation of Turbogas Plants for GENERAL ELECTRIC - ENERGY. Offices c/o Belfort (France).

    I am responsible for planning, scheduling of the project, my duties are including: prepare and present detailed planning information (Gantt charts, histograms, PERT charts, Baselines Schedules, S Curves & Progress reports) and apply performance analysis within a project environment. Developing, maintaining, and analysing critical path plans and related schedules. Create work breakdown structures suitable to the programme of work. Analyse planning data and modifications as required to achieve imposed targets through time based analysis and/or resource limited based scheduling. Maintain progress data on live programs and produce progress reports.

     Projects: Engineering, Procurement and Realisation of Water Production Plants for GENERAL ELECTRIC - WATER. Offices c/o Belfort (France) and Milan (Italy).

    I was in charge for developing Project Control procedures, implementing and optimising them. The objective was to improve and structure a new PC methodology for the Business and to diffuse it between the project teams. I helped to smooth the process of migration of all the active projects on a P6 platform and I developed a convenient reporting system. In parallel I was responsible for the development and tracking of 25 projects.
  • SNAMPROGETTI - IT - Project Planner

    2006 - 2008 2006-2008 Wintec

    Project Planner: Logic network development, Progress tracking and Reporting

     Project: Engineering and realisation of a Turbogas Plant for SNAMPROGETTI. Offices c/o Ferrara.

    I was responsible for planning of the project, develop the baseline schedule, crate the WBS and code structure in compliance with Company and Subcontractors’ guidelines, optimize the schedule at a level 4 detail. Progress updates was on a weekly basis, I was responsible to collect and integrate the data from all Subcontractors, to verify the Company’s procedure was systematically applied, to provide them support in order to uniformize theyr methods and tools to the Company’s procedures. S-curves, Weekly and Monthly reports, constant contribution of data and analisys to the Head Office.
    I also was supporting the Cost control Manager collating, verifying and validating data and information for cost/ pricing spread sheets preparation with regards personnel, equipment, consumables and subcontract services for work

     Project: Engineering Procurement and Construction of Serenissima Refinery Plant for SNAMPROGETTI. Offices c/o Mestre (VE).

    I developed the Master Schedule at a level 3 detail for the new refinery realization, affected resources and implemented a weighting system in order to obtain Leveling and S-curves analisys.
    I attended to several meetings with the Customer and Snamprogetti’s top management with the purpose of discuss and optimise the schedule.
  • E. Mantovani s.p.a. - IT - Project Planner

    2003 - 2006 2003-2006 Ing. E. Mantovani s.p.a.

    Project Planning and Cost Control: Development of cost and resource based schedules, Progress tracking and Performance analysis, Reporting.

    Projects:
     Engineering and realisation of MOSE hydraulic structure for tide regulation. Offices c/o Mestre (Venice) and Padova.

     Realisation of Adriatic LNG pipeline for SNAMPROGETTI and EXXON MOBIL. Offices c/o Porto Viro (Rovigo).

    Interfacing with the planning staff for the projects MOSE and Adriatic LPG reporting to the Project Manager, with responsibility to create and supervise the flows of Product Costing and relevant updates, to prepare the reporting packages, budgets, forecast and updates in compliance with Head Quarter requirements, producing analysis and business performance (KPI), producing expense and efficiency analysis. I have managed activities of engineering, procurement and construction, maintaining the routine of analysis of manufacturing cost accounting and the activities related to the work period closings. I have collaborated, in according to the procedures and Business politics, to the elaboration of annual plans, of budgets and forecasts, participating in the definition and implementation of work progress reports, tabular and graphics reports for the Project Management. I participated in the activities of preparation, assemblage and of data collection of budget, supporting the business unities involved in the analysis and survey of consolidated data and formulation of forecasts. I have contributed noticing and analyzing the results and variances of budget and supporting the interested units in the determination of corrective actions, elaborating reports and periodic statistics, highlighting the profitability of the disciplines and made data available to the responsible persons for the evaluation of project status.
  • TECNOMARE - IT - Cost Control

    2000 - 2001 2000–2001 HCR & Associates

    Cost Control and Document Control: Manpower cost analysis and Performance tracking, Creation and maintenance of Document database, Reporting

     Projects: Offshore oil&gas plants engineering. Offices c/o TECNOMARE, Venice.
  • ANSALDO - Planning Technical Support

    2000 - 2001 2000–2001 HCR & Associates

    Planning Technical Support: migration of all the logic networks from MSProject to Primavera P3 format

     Projects: Realisation of facilities for nuclear plants. Offices c/o ANSALDO, Sesto S. Giovanni (Milan).
  • ASG Scarl, Piacenza. -IT - Cost Control Technical Support

    2000 - 2001 2000–2001 HCR & Associates

    Cost Control Technical Support: integration of Cost and Codes in the logic network, development of a Cost and Planning integrated Control system

     Project: Realisation of the High Speed railway network. Offices c/o ASG Scarl, Piacenza.
  • American military base at Sigonella - Project Planner

    2000 - 2001 2000–2001 HCR & Associates

    Project Planner: development of the baseline schedule

     Project: Realisation of buildings for the American military base at Sigonella. Offices c/o CMC, Sigonella (Catania).
  • ASTALDI spa - IT - Project Planner

    1999 - 2000 1999–2000 ASTALDI spa

    Project Planner: Progress tracking and Reporting

     Project: Realisation of the hydro-electic plant in Pont Ventoux. Offices c/o Susa (Torino).

    Project Planner: Progress tracking and Reporting

     Project: Realisation of the Zagreb-Gorica motorway. Offices c/o Zagreb (Croatia).