-
Technip
- Project Quality Manager
Paris
2013 - maintenant
-
Subsea 7
- QA/QC Engineer
SURESNES
2012 - 2013
- Participate in the critically assessment rating and inspection levels definition,
- Conduct the Pre-Production Meetings (PPM) and to facilitate the start of production,
- Review / approve the Suppliers Inspection & Test Plans (ITPs) and related control procedures defined in the Supplier Document Register (SDR),
- Define the scope of inspection prior to assign and coordinating the inspectors,
- Nominate qualified inspectors for the implementation of the surveillance on-site,
- Liaise with SCM to ensure that “Look-ahead Inspection Schedule” and inspections are scheduled,
- Review / approve the Inspection Reports, identify any problems and keep the project and departmental staff informed of progress,
- Process NCR’s raised during inspections and keep the project and departmental staff informed of progress,
- Verify all Technical Queries and NCRs are closed prior to organising the Release,
- Validate the Inspection Release Notes (IRN) and associated Punch Lists,
- Participate in performance evaluation of suppliers / yards as requested,
- Review and approve final documentation,
- Act as Subsea 7 ambassador with regards to HSE matters and participate to the supplier HSE continuous improvement,
- Aid in ensuring that Subsea 7 procedures are in place, known and respected by all relevant staff,
- Assist during the engineering / development phases to ensure that key steps are respected,
- Ensure active QC monitoring of Subcontractors activities, in line with resulting Surveillance level,
- Carry out investigations as required for critical NCR’s and Quality Observations. Ensure feedback mechanisms are in place to continuously improve the way we work with our Clients,
- Ensure the adequate close-out of non-conformity, deviation requests, concession requests and technical queries.
-
Subsea 7
- Mission
SURESNES
2011 - 2012
My mission is to participate in the reduction of the Cost of Non Quality (CNQ) and the improvement of the project performance:
- Analysis of the Quality System of Subsea 7 in order to develop a mapping of strengths and weaknesses of the System.
- Conduct a general survey (782 persons) regarding quality
- Analysis of the survey results and presentation to the top management of Subsea7
- Propose actions to improve the image and the effectiveness of the quality function
- Use of the quality methods and tool
- Propose a project assessment matrix by using the international norm “ISO 10006: 2003”
- All my recommendations became officially the new targets for Subsea7
-
Saipem
- Completion System Coordinator & Project Quality Deputy Manager
Montigny-le-Bretonneux
2010 - 2011
Project: LPG (Liquefied Petroleum Gas) /LDHP (Line Direct High Pressure)- USD 1.8 billion
Client & localization: Algerian oil company SONATRACH / Hassi-Messaoud 900 km south east of Algiers
Project Description:
EPCC (Engineering, Procurement, Construction and Commissioning) project with Triple train LPG treatment plant, associated condensate production facilities and infrastructures in the Hassi-Messaoud oil complex, with a total capacity of 8 million cubic meters a day.
Job description: Completion System Coordinator & Project Quality Deputy Manager
Assist the Quality manager in establishing, implementing and maintaining the quality management system.
Maintain relationship and liaise with clients to follow up the quality issues.
Assist the QA/QC team (35 inspectors) to review the Contractor’s QA/QC Documentation, such as Quality Plan, ITP, QA/QC Procedures, etc. related to EPCC works
Responsible for planning, organizing and managing the overall quality test planning
First responsible for the SAIPEM quality control software (PCOS) dedicated to handle all the quality controls related to the Equipments, Pipeline, Piping, Steel structure, storage tanks, painting, insulation, civil works…)
Manage a team with three (03) operators to control and import the quality control certificates in the project software (PCOS).
Monitoring and coordinating Site Surveillance Programs and reviewing Contractor quality plans.
Coordinates inspection activities for discipline inspectors at site and reports to the Project Quality Manager
Act as liaison between the company, the partner and the Client for all quality control and inspection, testing activities.
Elaborate weekly and monthly quality reporting and progress.
Assure the maintaining of ISO 9001 requirements by all the quality team
Support for follow-up and check all the relevant QCP and Items identification as per Engineering and vendors Drawings.
Assure that all subcontractors Quality Documentation are issued and conform with SAIPEM management requirements
Tool box meeting preparation and presentation for SAIPEM team and subcontractors
Monitoring of the project non conformities during the different project phases
Follow up of preventive and corrective actions
Assurance of internal and external quality audits in line with ISO 9001 and ISO 10006.
Produce audit schedule to cover work scope & subcontractor surveillance
Assure the Quality documentation and registers Soft and hard Archive (NCR, Instruments calibration, WPS and PQR…)
-
Saipem
- Completion System & QC Coordinator
Montigny-le-Bretonneux
2009 - 2011
Project : UTBS (Unité de Traitement du Brut et sa Stabilisation)- USD 1 billion
Client & localization: Algerian oil company SONATRACH / Hassi-Messaoud 900 km south east of Algiers
Project Description:
GOSP (Gas Oil Separation Plant) project type: Crude oil gathering system and associated gas treatment plant:
-3 trains of 100.000 bbl/day each
-4 trains of compression
-Storage tanks: 4×50 000 m3 + 1×20 000 m3 Off Spec
-Oil, Gas and Water pipelines (45 km)
Job description: Completion System & QC Coordinator:
-Quality Control test planning of all the project disciplines and activities by using the SAIPEM project software.
-Configured SAIPEM Database for all Construction, Pre-commissioning and commissioning activities (liaison with QCP, system and sub-system association).
-Responsible for a team of five (5) operators to control and import the quality control certificates in the project software (PCOS –Project completion system).
-Train SAIPEM operators on using the project software (Quality, pre-commissioning, commissioning phases)
-Ensure the implementation of approved Quality Plan, ITP, Inspection & Test Procedures for the EPCC scope of work to be executed both during the construction phase and during pre-commissioning and commissioning phase
-Provide necessary support to the Discipline QC Inspectors to ensure that all inspection and testing with Hold and Witness Points are adequately attended.
-Identification of missing certificates, backlog or not applicable tests for each Disciplines (Equipments, Piping, fabrication, pipeline, Civil, steel structure....)
-Periodic Quality Control Progress reporting for each disciplines, system and subsystems
-Follow-up of all the Test Pack (Pipeline & piping Hydro testing) certificates and assure the load in Software database
-Management of Quality Control Documentation to ensure Mechanical Completion, pre-commissioning and Commissioning to issue Provisional acceptance Certificate
-Help to the achievement of the mechanical completion objective and handing over of the systems to the Client
-
RYM SEKOURA
- Sales process Leader
2005 - 2008
In charge of external relations (Partners and Customers)
Establish a system for Algerian and International request offers for all the company
Preparation of national and internationals technical tenders
Help the technical direction and company president in the preparation of commercial tenders.
Implementation and application of ISO 9001 inside the Commercial department
Preparation of Consortiums and joint-Venture with foreign partners.
Follow up of partners business in Algerian area.
-
RYM SEKOURA
- Construction activities coordinator
2005 - 2008
Coordination between projects sites and head office in Algiers
Interface with different departments to meet the needs of projects according to the projected schedules (Employers, Materials…)
Realization of Internal Audit on different projects sites
Analysis of the construction reporting to implement preventive and corrective actions
Coordinate with Algerian authority (DPEM/ARH) for the approval of the PQR/WPS
Update with the specialists all the NDT (RT ,MT, PT,VT..) procedure specified to each project
-
Sonatrach / EPPM
- Doc Controller & Client Project Manager Assistant
2004 - 2005
Organize and prepare the weekly and monthly meetings
Elaboration of administrative reports and consolidation of daily technical reports
Writing, sending, archive of all project correspondence
Follow up of the client project documentation (procedures, specifications, drawings…) and ensure that project is using the lasts revisions.