Menu

Ould Hadda AMOKRANE

Montigny-le-Bretonneux

En résumé

Works experience 14Years ELECTRICAL SUPERVISOR
Pre commissioning and commissioning
 Test electrical protections and settings
 UPS and Battery charger
 HV,MV,LV power transformers
 HV switchboard 20KV, MV switchboard 6.6kV, LV switchboard 0,4kV
 MV motors, LV motors, DC motors.
 Ratio of current transformer and voltage transformer
 Electrical interlocks
 Electrical Commissioning of Emergency diesel generator
 Commissioning of Lighting system
 Assistance for commissioning ECS system
 Assistance for commissioning of anti intrusion system
 Process- loop-checks and instrumentation calibration

ALGERIA January 2013 until September: SAIPEM CONTRACTING ALGERIA (Sonatrach Project Gas Liquid Extraction Associated Hassi Messaoud and Oil Separation LDHP ZCINA
NIGERIA August 2011 until July 2012: SAIPEM NIGERIA CONTRACTING LTD with subcontractor Algerian Company RE EL SERVICES Project OML58 Upgrade, revamping of the existing Flow Station and for increasing the overall safety of plant operation
ALGERIA February2010 until July2011: ANSALDO ENERGIA SPA (Sonelgaz Project Electrical Power Plant 2X215 MW M`sila)
LIBYA September2009 until December2009 : GE OIL&GAS NUOVO PIGNONE/BONATTI SPA with subcontractor Algerian Company RE EL SERVICES Project Revamping of Power Plant 4x20mw Messla
FRANCE may2008 until august 2009: SAIPEM/SOFREGAZ with subcontractor Algerian Company RE EL SERVICES project LNG Terminal Fos-Cavaou (Marseille)
LIBYA august2007 until April2008: GE OIL&GAS NUOVO PIGNONE /BONATTI SPA with subcontractor Algerian Company RE EL SERVICES (Greenstream Project steam production Mellitah)
ALGERIA May 2007 until July 2007: VATECH-SIEMENS with subcontractor Algerian Company RE EL SERVICES (Sonelgaz GRTE Project Substation 220 / 400kV BIR GHBALOU Bouira)
LIBYA June 2006 until April2007: GE OIL&GAS NUOVO PIGNONE /BONATTI SPA with subcontractor Algerian Company RE EL SERVICES (Greenstream Project steam production Mellitah)
ALGERIA February 2006 until May 2006: AREVA with subcontractor Algerian Company RE EL SERVICES (Sonelgaz GRTE Project distribution station 63&220 KV Tebessa)
LIBYA June2004 until January2006: GE OIL & GAS NUOVO PIGNONE /BONATTI SPA with subcontractor Algerian Company RE EL SERVICES (Greenstream Project Gas Compressor Station Mellitah)
ALGERIA October2001 until December2003: ANSALDO ENERGIA S.P.A with subcontractor Algerian Company RE EL SERVICES (Sonelgaz Project Electrical Power Plant 2X215 HAMMA Alger’s)
ALGERIA January2001 until September2001 : NUOVO PIGNONE S.P.A / BANTINI with subcontractor Algerian Company RE EL SERVICES (Sonelgaz project Electrical Power Plant 3X110 MW Hassi karkine)
ALGERIA June 1999 until December2000: NUOVO PIGNONE S.P.A with subcontractor Algerian Company RE EL SERVICES (Sonelgaz project Electrical Power Plant 3X110 MW Hassi massaoud)


Mes compétences :
Calibration
Electrical
Switchboard
Test
Transformers

Entreprises

  • Saipem - Superviseur Electricien

    Montigny-le-Bretonneux 2011 - maintenant Commissioning

Formations

Pas de formation renseignée

Annuaire des membres :