Freelance
- Electrical Leader
2018 - maintenant
Spécialisé en construction, commissioning, start-up et maintenance partie electricité
-
DIETSMANN OFON NIGERIA
- Electrical leader
2012 - 2018
* Supervision maintenance corrective and preventive on site under UNISUP.
* Follow construction and commissioning Ofon phase 2 in Korea. ;
* Follow commissioning and start - up OFP2. ;
* Head of power plant 3 X 35 MVA Rolls Royce RB211 under PDCS Schneider. ;
-
DIETSMANN OFON
- Electrical leader
2012 - 2018
Dates and Employer
: DIETSMANN OFON Type of business or sector Sector of the energy: oil & gas.
Sector of industry: oil & gas production
Main activities and responsibilities ➢ Supervision maintenance corrective and preventive on site under UNISUP
* Follow construction and commissioning Ofon phase 2 in Korea at Ulsan
* Follow up commissioning and start - up OFP2.
* Head of power plant 3 X 35 MVA Rolls Royce RB211 under PDCS Schneider
* Writing start-up and black-start procedures
-
DIETSMANN TOULOUSE FRANCE
- Electrical HVAC Supervisor
2012 - 2012
* Maintenance procedures writing for PAZFLOR Project ;
-
DIETSMANN TOULOUSE FRANCE
- Electrical HVAC Supervisor
2012 - 2012
Type of business or sector Sector of the energy: oil & gas.
Sector of industry: oil & gas production
Occupation or position held Electrical HVAC Supervisor
Main activities and responsibilities ➢ Maintenance procedures writing for PAZFLOR Project
Page 1/4 - Curriculum vitae of Boyer Pascal
-
DIETSMANN YANGA CONGO
- Electrical HVAC Supervisor
2010 - 2011
* Supervision maintenance corrective and preventive on site under UNISUP.
* Head of power plant 3 X 13 MVA Nuovo Pignone MS 3002 under PDCS Sarrat Ind. ;
-
DIETSMANN YANGA CONGO
- Electrical HVAC Supervisor
2010 - 2011
Dates and Employer August 2010 - December 2011 : Type of business or sector
Sector of the energy: oil & gas.
Sector of industry: oil & gas production
Main activities and responsibilities ➢ Supervision maintenance corrective and preventive on site under UNISUP
* Head of power plant 3 X 13 MVA Nuovo Pignone MS 3002 under PDCS Sarrat Ind
* Start-up Libondo platform
Dates and Employer
-
SAIPEM BLOC 3/85
- Electrical HVAC Supervisor
2006 - 2010
Dates and Employer
: SAIPEM BLOC 3/85 Type of business or sector Sector of the energy: oil & gas.
Sector of industry: oil & gas production
Main activities and responsibilities ➢ Supervision maintenance corrective and preventive on site under UNISUP
* Head of power plant 3 X 33 MVA Nuovo Pignone MS 5001 under PDCS ICE
-
Saipem
- Electrical HVAC Supervisor
Montigny-le-Bretonneux
2006 - 2010
* Supervision maintenance corrective and preventive on site under UNISUP.
* Head of power plant 3 X 33 MVA Nuovo Pignone MS 5001 under PDCS ICE. ;
-
Entrepose Contracting
- Electrical Supervisor
Colombes
2006 - 2006
Dates and Employer July 2006 - October 2006 : ENTREPOSE CONTRACTING
Type of business or sector Sector of the energy: oil & gas.
Sector of industry: oil & gas production
Occupation or position held Electrical Supervisor
Main activities and responsibilities ➢ Follow - up of electrical construction
* Coordination of several subcontractors
* Liaises with engineering department
-
Entrepose Contracting
- Electrical Supervisor
Colombes
2006 - 2006
* Follow - up of electrical construction ;
* Coordination of several subcontractors
* Liaises with engineering department ;
-
TECHNIP DANDE SPOOLBASE ANGOLA
- Electrical HVAC Supervisor
2005 - 2006
* Follow - up of electrical construction ;
* Coordination of several subcontractors
* Liaises with engineering department ;
* Commissioning of electrical network and production line ;
* Head of power plant 4 X 350 KVA Benza Internaco ;
-
TECHNIP DANDE SPOOLBASE ANGOLA
- Electrical HVAC Supervisor
2005 - 2006
Type of business or sector Sector of the energy: oil & gas.
Sector of industry: oil & gas production
Occupation or position held Electrical HVAC Supervisor
Main activities and responsibilities Follow - up of electrical construction
* Coordination of several subcontractors
* Liaises with engineering department
* Commissioning of electrical network and production line
* Head of power plant 4 X 350 KVA Benza Internaco
➢
Page 2/4 - Curriculum vitae of Boyer Pascal
-
SAIPEM PORT HARCOURT NIGERIA
- Electrical Supervisor
2004 - 2004
* Refurbishment of equipments from Cawthorne Channel Project
* Modification of lay barge BOS 270 to 36'' line up ;
-
Saipem
- Electrical Supervisor
Montigny-le-Bretonneux
2004 - 2004
Dates and Employer June 2004 - October 2004 : Type of business or sector
Sector of the energy: oil & gas.
Sector of industry: oil & gas production
Main activities and responsibilities ➢ Refurbishment of equipments from Cawthorne Channel Project
* Modification of lay barge BOS 270 to 36'' line up
-
Saipem
- Electrical Supervisor
Montigny-le-Bretonneux
2003 - 2004
* Maintenance of equipments
* Electrical quotations of GTS 4 Project ;
-
Saipem
- Electrical Supervisor
Montigny-le-Bretonneux
2003 - 2004
Dates and Employer October 2003 - May 2004 : Type of business or sector
Sector of the energy: oil & gas.
Sector of industry: oil & gas production
Main activities and responsibilities ➢ Maintenance of equipments
* Electrical quotations of GTS 4 Project
Dates and Employer
-
BOUYGUES OFFSHORE
- Electrical Supervisor
Paris
2002 - 2003
* Head of 3 X 906 KVA Caterpillar
* Maintenance of equipments and infrastructures ;
-
BOUYGUES OFFSHORE KOME
- Electrical Supervisor
2002 - 2003
Dates and Employer
: Type of business or sector Sector of the energy: oil & gas.
Sector of industry: oil & gas production
Main activities and responsibilities ➢ Head of 3 X 906 KVA Caterpillar
* Maintenance of equipments and infrastructures
-
EDF / GDF VAL DE CHARENTE
- Electrical Team Leader
1992 - 2002
Type of business or sector Sector of the energy: electrical distribution.
Sector of industry: electricity
Occupation or position held Electrical Team Leader
Main activities and responsibilities ➢ Construction & maintenance overhead, underground electrical network
* Construction HV/LV distribution station
* Under voltage work
Page 3/4 - Curriculum vitae of Boyer Pascal
-
EDF
- Electrical Team Leader
Paris
1992 - 2002
* Construction & maintenance overhead, underground electrical network ;
* Construction HV/LV distribution station
* Under voltage work ;