Subsea 7
- Projects Director
SURESNES
2015 - maintenant
SUBSEA7- Overall direction of Sonamet’s Fabrication Projects for Major EPC contractors or Oil Companies
-
Sonamet, Joint venture of Subsea seven and Sonagol
- Project Manager
2011 - 2015
SINCE MARCH 2011: SONAMET, Angola
Management of CLOV Surf Project (158 millions USD project)
Preparation work prior fabrication:
• Preparation/refurbishment of all workshops and fabrication areas that will be needed.
• Purchasing of all materials needed for the scope of work
• Preparation of the planning, definition of fabrication sequences for each scope of work.
Fabrication of subsea structures (52 PLETS, 3 Anchor Piles, Double Joints, Pipe in Pipe, 2 towers, 3 Buoyancy tanks, 52 Jumpers and Spools).
• Interface with Company
• Technical and Financial review
• Planning, procedures, budget review.
• Organisation of the project team and its activities.
-
sbsea7
- Project Fabrication Manager
2009 - 2011
Management of Pazflor Surf Project (30 millions USD project)
Fabrication of subsea structures (16 PLETS, 10 Anchor Piles, 23Jumpers and Spools).
• Interface with Client
• Interface with Company (TOTAL)
• Follow-up of fabrication Activities
• Technical and Financial review
• Planning, procedures, budget review.
• Organisation of the project team and its activities.
-
Subsea 7
- Project Fabrication Engineer
SURESNES
2008 - 2009
Block 15 Gas Gathering Project (EXXON)
Fabrication of subsea structures (PLETS, Suction Piles, buoyancy tanks, and Double Joints)
• Manage the interface with Yard departments, sub contractors & clients.
• Organisation of daily fabrication activities to
• Preparation of fabrication schedule including procurement, engineering, construction, testing stages and load out. Definition of required resources.