Menu

Patrick MARCEL

SURESNES

En résumé

Pas de description

Entreprises

  • Subsea 7 - Projects Director

    SURESNES 2015 - maintenant SUBSEA7- Overall direction of Sonamet’s Fabrication Projects for Major EPC contractors or Oil Companies
  • Sonamet, Joint venture of Subsea seven and Sonagol - Project Manager

    2011 - 2015 SINCE MARCH 2011: SONAMET, Angola

    Management of CLOV Surf Project (158 millions USD project)

    Preparation work prior fabrication:
    • Preparation/refurbishment of all workshops and fabrication areas that will be needed.
    • Purchasing of all materials needed for the scope of work
    • Preparation of the planning, definition of fabrication sequences for each scope of work.

    Fabrication of subsea structures (52 PLETS, 3 Anchor Piles, Double Joints, Pipe in Pipe, 2 towers, 3 Buoyancy tanks, 52 Jumpers and Spools).
    • Interface with Company
    • Technical and Financial review
    • Planning, procedures, budget review.
    • Organisation of the project team and its activities.
  • sbsea7 - Project Fabrication Manager

    2009 - 2011 Management of Pazflor Surf Project (30 millions USD project)
    Fabrication of subsea structures (16 PLETS, 10 Anchor Piles, 23Jumpers and Spools).
    • Interface with Client
    • Interface with Company (TOTAL)
    • Follow-up of fabrication Activities
    • Technical and Financial review
    • Planning, procedures, budget review.
    • Organisation of the project team and its activities.
  • Subsea 7 - Project Fabrication Engineer

    SURESNES 2008 - 2009 Block 15 Gas Gathering Project (EXXON)
    Fabrication of subsea structures (PLETS, Suction Piles, buoyancy tanks, and Double Joints)
    • Manage the interface with Yard departments, sub contractors & clients.
    • Organisation of daily fabrication activities to
    • Preparation of fabrication schedule including procurement, engineering, construction, testing stages and load out. Definition of required resources.

Formations

Réseau

Annuaire des membres :