Paul KLEBAIS

Cergy

En résumé

I am a highly experienced Commissioning individual in the Oil Gas Petrochem and Power Generation areas worldwide with over 28 years experience looking for my next assignment .

Mes compétences :
Power generation
Process
Qualité
Calibration
Quality Control
Programmable Logic Controller
Petrochemicals
Onshore Oil & Gas
Offshore Oil & Gas
Generators
subsequent troubleshooting
problem solving
overall supervision
negotiation of service contracts and planning
detailed analysis
X25
Transducers
The Project Management
System Evaluation
Siemens Hardware
SCADA
QHSE Management
Project Management
Product Development
Pneumatics
PC Hardware
Mechanical Completion
LAN/WAN > WAN
LAN/WAN > LAN
Installation and Commissioning
Infusion pumps
EXOP Advanced First Aid Training
Control and Instrumentation
Commissioning coordination
Assurance qualité
Amélioration continue
Gestion de projet
Management
Industrie pharmaceutique
Bonnes Pratiques de Fabrication
Production
Recrutement

Entreprises

  • ABB - Commissioning Manager

    Cergy 2014 - 2014 Dolwin Alpha and Borwin 500 Million Pounds

    Duties include

    The Coordination of Commissioning Activities for the completion of Pre Commissioning and Commissioning of the above Platforms

    The writing of procedures for outstanding works on Dolwin Alpha

    The writing of procedures for Borwin Test and Commissioning
  • ABB - Commissioning Manager

    Cergy 2014 - 2014 Dolwin Alpha and Borwin 500 Million Pounds

    Duties include

    The Coordination of Commissioning Activities for the completion of Pre Commissioning and Commissioning of the above Platforms

    The writing of procedures for outstanding works on Dolwin Alpha

    The writing of procedures for Borwin Test and Commissioning
  • ABB - Commissioning Manager

    Cergy 2014 - 2014 Dolwin Alpha and Borwin 500 Million Pounds

    Duties include

    The Coordination of Commissioning Activities for the completion of Pre Commissioning and Commissioning of the above Platforms

    The writing of procedures for outstanding works on Dolwin Alpha

    The writing of procedures for Borwin Test and Commissioning
  • ABB - Commissioning Manager

    Cergy 2014 - 2014 Dolwin Alpha and Borwin 500 Million Pounds

    Duties include

    The Coordination of Commissioning Activities for the completion of Pre Commissioning and Commissioning of the above Platforms

    The writing of procedures for outstanding works on Dolwin Alpha

    The writing of procedures for Borwin Test and Commissioning
  • ABB - Commissioning Manager

    Cergy 2014 - 2014 Dolwin Alpha and Borwin 500 Million Pounds

    Duties include

    The Coordination of Commissioning Activities for the completion of Pre Commissioning and Commissioning of the above Platforms

    The writing of procedures for outstanding works on Dolwin Alpha

    The writing of procedures for Borwin Test and Commissioning
  • ABB - Commissioning Manager

    Cergy 2014 - 2014 Dolwin Alpha and Borwin 500 Million Pounds

    Duties include

    The Coordination of Commissioning Activities for the completion of Pre Commissioning and Commissioning of the above Platforms

    The writing of procedures for outstanding works on Dolwin Alpha

    The writing of procedures for Borwin Test and Commissioning
  • ABB - Commissioning Manager

    Cergy 2014 - 2014 Dolwin Alpha and Borwin 500 Million Pounds

    Duties include

    The Coordination of Commissioning Activities for the completion of Pre Commissioning and Commissioning of the above Platforms

    The writing of procedures for outstanding works on Dolwin Alpha

    The writing of procedures for Borwin Test and Commissioning
  • ABB - Commissioning Manager

    Cergy 2014 - 2014 Dolwin Alpha and Borwin 500 Million Pounds

    Duties include

    The Coordination of Commissioning Activities for the completion of Pre Commissioning and Commissioning of the above Platforms

    The writing of procedures for outstanding works on Dolwin Alpha

    The writing of procedures for Borwin Test and Commissioning
  • Saudi Archirodon Ltd - Pre-Commissioning Manager

    2014 - 2014 Yanbu Export Refinery Project NGL (SP-7) 300 Million USD

    Duties include

    Cover for permanent member of staff
    Review of Planning
    Generating documentation for Pre-commissioning activities of the renovation / upgrade project
    Definition of Systems / Sub Systems
  • Saudi Archirodon Ltd - Pre-Commissioning Manager

    2014 - 2014 Yanbu Export Refinery Project NGL (SP-7) 300 Million USD

    Duties include

    Cover for permanent member of staff
    Review of Planning
    Generating documentation for Pre-commissioning activities of the renovation / upgrade project
    Definition of Systems / Sub Systems
  • Saudi Archirodon Ltd - Pre-Commissioning Manager

    2014 - 2014 Yanbu Export Refinery Project NGL (SP-7) 300 Million USD

    Duties include

    Cover for permanent member of staff
    Review of Planning
    Generating documentation for Pre-commissioning activities of the renovation / upgrade project
    Definition of Systems / Sub Systems
  • Saudi Archirodon Ltd - Pre-Commissioning Manager

    2014 - 2014 Yanbu Export Refinery Project NGL (SP-7) 300 Million USD

    Duties include

    Cover for permanent member of staff
    Review of Planning
    Generating documentation for Pre-commissioning activities of the renovation / upgrade project
    Definition of Systems / Sub Systems
  • Saudi Archirodon Ltd - Pre-Commissioning Manager

    2014 - 2014 Yanbu Export Refinery Project NGL (SP-7) 300 Million USD

    Duties include

    Cover for permanent member of staff
    Review of Planning
    Generating documentation for Pre-commissioning activities of the renovation / upgrade project
    Definition of Systems / Sub Systems
  • Saudi Archirodon Ltd - Pre-Commissioning Manager

    2014 - 2014 Yanbu Export Refinery Project NGL (SP-7) 300 Million USD

    Duties include

    Cover for permanent member of staff
    Review of Planning
    Generating documentation for Pre-commissioning activities of the renovation / upgrade project
    Definition of Systems / Sub Systems
  • Saudi Archirodon Ltd - Pre-Commissioning Manager

    2014 - 2014 Yanbu Export Refinery Project NGL (SP-7) 300 Million USD

    Duties include

    Cover for permanent member of staff
    Review of Planning
    Generating documentation for Pre-commissioning activities of the renovation / upgrade project
    Definition of Systems / Sub Systems
  • ABB Sweden - Commissioning Manager

    Cergy 2013 - 2014 Offshore wind
  • ABB Sweden - Commissioning Manager

    Cergy 2013 - 2014 Offshore wind
  • ABB Sweden - Commissioning Manager

    Cergy 2013 - 2014 Offshore wind
  • ABB Sweden - Commissioning Manager

    Cergy 2013 - 2014 Offshore wind
  • ABB Sweden - Commissioning Manager

    Cergy 2013 - 2014 Offshore wind
  • ABB Sweden - Commissioning Manager

    Cergy 2013 - 2014 Offshore wind
  • ABB Sweden - Commissioning Manager

    Cergy 2013 - 2014 Offshore wind
  • ABB Sweden - Commissioning Manager

    Cergy 2013 - 2014 Offshore wind
  • ABB Sweden - Commissioning Manager

    Cergy 2013 - 2014 Offshore wind
  • ABB Sweden - Commissioning Manager

    Cergy 2013 - 2014 Offshore wind
  • Ferrostaal Geisenheim Germany - Process Commissioning Manager

    Levallois Perret 2013 - 2013 Duties include

    Review of Planning
    Writing of pre commissioning /commissioning procedures as per contractual requirements
    Review of pre commissioning / commissioning procedures
    Interface meetings with all associated departments - Process / Instrumentation / Electrical /Mechanical etc etc
    Technical Advice on Commissioning Activities relating to the many tie ins as an interface to a Live Refinery installation ,including piping , electrical , instrumentation and implementation of a new SCADA / DCS system.
  • Ferrostaal Geisenheim Germany - Process Commissioning Manager

    Levallois Perret 2013 - 2013 Duties include

    Review of Planning
    Writing of pre commissioning /commissioning procedures as per contractual requirements
    Review of pre commissioning / commissioning procedures
    Interface meetings with all associated departments - Process / Instrumentation / Electrical /Mechanical etc etc
    Technical Advice on Commissioning Activities relating to the many tie ins as an interface to a Live Refinery installation ,including piping , electrical , instrumentation and implementation of a new SCADA / DCS system.
  • Ferrostaal Geisenheim Germany - Process Commissioning Manager

    Levallois Perret 2013 - 2013 Duties include

    Review of Planning
    Writing of pre commissioning /commissioning procedures as per contractual requirements
    Review of pre commissioning / commissioning procedures
    Interface meetings with all associated departments - Process / Instrumentation / Electrical /Mechanical etc etc
    Technical Advice on Commissioning Activities relating to the many tie ins as an interface to a Live Refinery installation ,including piping , electrical , instrumentation and implementation of a new SCADA / DCS system.
  • Ferrostaal Geisenheim Germany - Process Commissioning Manager

    Levallois Perret 2013 - 2013 Duties include

    Review of Planning
    Writing of pre commissioning /commissioning procedures as per contractual requirements
    Review of pre commissioning / commissioning procedures
    Interface meetings with all associated departments - Process / Instrumentation / Electrical /Mechanical etc etc
    Technical Advice on Commissioning Activities relating to the many tie ins as an interface to a Live Refinery installation ,including piping , electrical , instrumentation and implementation of a new SCADA / DCS system.
  • Ferrostaal Geisenheim Germany - Process Commissioning Manager

    Levallois Perret 2013 - 2013 Duties include

    Review of Planning
    Writing of pre commissioning /commissioning procedures as per contractual requirements
    Review of pre commissioning / commissioning procedures
    Interface meetings with all associated departments - Process / Instrumentation / Electrical /Mechanical etc etc
    Technical Advice on Commissioning Activities relating to the many tie ins as an interface to a Live Refinery installation ,including piping , electrical , instrumentation and implementation of a new SCADA / DCS system.
  • Ferrostaal Geisenheim Germany - Process Commissioning Manager

    Levallois Perret 2013 - 2013 Duties include

    Review of Planning
    Writing of pre commissioning /commissioning procedures as per contractual requirements
    Review of pre commissioning / commissioning procedures
    Interface meetings with all associated departments - Process / Instrumentation / Electrical /Mechanical etc etc
    Technical Advice on Commissioning Activities relating to the many tie ins as an interface to a Live Refinery installation ,including piping , electrical , instrumentation and implementation of a new SCADA / DCS system.
  • Ferrostaal Geisenheim Germany - Process Commissioning Manager

    Levallois Perret 2013 - 2013 Duties include

    Review of Planning
    Writing of pre commissioning /commissioning procedures as per contractual requirements
    Review of pre commissioning / commissioning procedures
    Interface meetings with all associated departments - Process / Instrumentation / Electrical /Mechanical etc etc
    Technical Advice on Commissioning Activities relating to the many tie ins as an interface to a Live Refinery installation ,including piping , electrical , instrumentation and implementation of a new SCADA / DCS system.
  • Ferrostaal Geisenheim Germany - Process Commissioning Manager

    Levallois Perret 2013 - 2013 Duties include

    Review of Planning
    Writing of pre commissioning /commissioning procedures as per contractual requirements
    Review of pre commissioning / commissioning procedures
    Interface meetings with all associated departments - Process / Instrumentation / Electrical /Mechanical etc etc
    Technical Advice on Commissioning Activities relating to the many tie ins as an interface to a Live Refinery installation ,including piping , electrical , instrumentation and implementation of a new SCADA / DCS system.
  • Ferrostaal Geisenheim Germany - Process Commissioning Manager

    Levallois Perret 2013 - 2013 Duties include

    Review of Planning
    Writing of pre commissioning /commissioning procedures as per contractual requirements
    Review of pre commissioning / commissioning procedures
    Interface meetings with all associated departments - Process / Instrumentation / Electrical /Mechanical etc etc
    Technical Advice on Commissioning Activities relating to the many tie ins as an interface to a Live Refinery installation ,including piping , electrical , instrumentation and implementation of a new SCADA / DCS system.
  • Ferrostaal Geisenheim Germany - Process Commissioning Manager

    Levallois Perret 2013 - 2013 Duties include

    Review of Planning
    Writing of pre commissioning /commissioning procedures as per contractual requirements
    Review of pre commissioning / commissioning procedures
    Interface meetings with all associated departments - Process / Instrumentation / Electrical /Mechanical etc etc
    Technical Advice on Commissioning Activities relating to the many tie ins as an interface to a Live Refinery installation ,including piping , electrical , instrumentation and implementation of a new SCADA / DCS system.
  • Imtech B.V. - Process Commissioning Manager

    2013 - 2013 Total Anguille Renovation Project 100 Million USD

    Duties include

    Preparation of the execution of Onshore / Offshore activities in Gabon including planning
    Generation of Pre Commissioning and Commissioning Procedures including process.
    Review of Total documentation relating to the project
    Familiarization with Total standards incl OPERCOM and ICAPS
    Review of HSE requirements and documentation
    Technical advice on the Pre Comm and Commissioning Phase
    Weekly progress meetings
    Assignment curtailed due to delay in project 7 months / budget issues.
  • Imtech B.V. - Process Commissioning Manager

    2013 - 2013 Total Anguille Renovation Project 100 Million USD

    Duties include

    Preparation of the execution of Onshore / Offshore activities in Gabon including planning
    Generation of Pre Commissioning and Commissioning Procedures including process.
    Review of Total documentation relating to the project
    Familiarization with Total standards incl OPERCOM and ICAPS
    Review of HSE requirements and documentation
    Technical advice on the Pre Comm and Commissioning Phase
    Weekly progress meetings
    Assignment curtailed due to delay in project 7 months / budget issues.
  • Imtech B.V. - Process Commissioning Manager

    2013 - 2013 Total Anguille Renovation Project 100 Million USD

    Duties include

    Preparation of the execution of Onshore / Offshore activities in Gabon including planning
    Generation of Pre Commissioning and Commissioning Procedures including process.
    Review of Total documentation relating to the project
    Familiarization with Total standards incl OPERCOM and ICAPS
    Review of HSE requirements and documentation
    Technical advice on the Pre Comm and Commissioning Phase
    Weekly progress meetings
    Assignment curtailed due to delay in project 7 months / budget issues.
  • Imtech B.V. - Process Commissioning Manager

    2013 - 2013 Total Anguille Renovation Project 100 Million USD

    Duties include

    Preparation of the execution of Onshore / Offshore activities in Gabon including planning
    Generation of Pre Commissioning and Commissioning Procedures including process.
    Review of Total documentation relating to the project
    Familiarization with Total standards incl OPERCOM and ICAPS
    Review of HSE requirements and documentation
    Technical advice on the Pre Comm and Commissioning Phase
    Weekly progress meetings
    Assignment curtailed due to delay in project 7 months / budget issues.
  • Imtech B.V. - Process Commissioning Manager

    2013 - 2013 Total Anguille Renovation Project 100 Million USD

    Duties include

    Preparation of the execution of Onshore / Offshore activities in Gabon including planning
    Generation of Pre Commissioning and Commissioning Procedures including process.
    Review of Total documentation relating to the project
    Familiarization with Total standards incl OPERCOM and ICAPS
    Review of HSE requirements and documentation
    Technical advice on the Pre Comm and Commissioning Phase
    Weekly progress meetings
    Assignment curtailed due to delay in project 7 months / budget issues.
  • Imtech B.V. - Process Commissioning Manager

    2013 - 2013 Total Anguille Renovation Project 100 Million USD

    Duties include

    Preparation of the execution of Onshore / Offshore activities in Gabon including planning
    Generation of Pre Commissioning and Commissioning Procedures including process.
    Review of Total documentation relating to the project
    Familiarization with Total standards incl OPERCOM and ICAPS
    Review of HSE requirements and documentation
    Technical advice on the Pre Comm and Commissioning Phase
    Weekly progress meetings
    Assignment curtailed due to delay in project 7 months / budget issues.
  • Imtech B.V. - Process Commissioning Manager

    2013 - 2013 Total Anguille Renovation Project 100 Million USD

    Duties include

    Preparation of the execution of Onshore / Offshore activities in Gabon including planning
    Generation of Pre Commissioning and Commissioning Procedures including process.
    Review of Total documentation relating to the project
    Familiarization with Total standards incl OPERCOM and ICAPS
    Review of HSE requirements and documentation
    Technical advice on the Pre Comm and Commissioning Phase
    Weekly progress meetings
    Assignment curtailed due to delay in project 7 months / budget issues.
  • Imtech B.V. - Process Commissioning Manager

    2013 - 2013 Total Anguille Renovation Project 100 Million USD

    Duties include

    Preparation of the execution of Onshore / Offshore activities in Gabon including planning
    Generation of Pre Commissioning and Commissioning Procedures including process.
    Review of Total documentation relating to the project
    Familiarization with Total standards incl OPERCOM and ICAPS
    Review of HSE requirements and documentation
    Technical advice on the Pre Comm and Commissioning Phase
    Weekly progress meetings
    Assignment curtailed due to delay in project 7 months / budget issues.
  • Imtech B.V. - Process Commissioning Manager

    2013 - 2013 Total Anguille Renovation Project 100 Million USD

    Duties include

    Preparation of the execution of Onshore / Offshore activities in Gabon including planning
    Generation of Pre Commissioning and Commissioning Procedures including process.
    Review of Total documentation relating to the project
    Familiarization with Total standards incl OPERCOM and ICAPS
    Review of HSE requirements and documentation
    Technical advice on the Pre Comm and Commissioning Phase
    Weekly progress meetings
    Assignment curtailed due to delay in project 7 months / budget issues.
  • Imtech B.V. - Process Commissioning Manager

    2013 - 2013 Total Anguille Renovation Project 100 Million USD

    Duties include

    Preparation of the execution of Onshore / Offshore activities in Gabon including planning
    Generation of Pre Commissioning and Commissioning Procedures including process.
    Review of Total documentation relating to the project
    Familiarization with Total standards incl OPERCOM and ICAPS
    Review of HSE requirements and documentation
    Technical advice on the Pre Comm and Commissioning Phase
    Weekly progress meetings
    Assignment curtailed due to delay in project 7 months / budget issues.
  • ABB - Commissioning Manager

    Cergy 2012 - 2013 Dolwin Project Holland 100 Million USD

    Duties include

    The coordination of day to day activities related to the workscope of ABB , collation of Product / Design Data in order to produce Commissioning Documentation for the Pre Comm / Comm/ Start Up of the Dolwin Platform

    Writing detailed reports on the day to day issues / attending meetings thereon.

    The writing of the documentation covering the commissioning of all of the equipment from ABB HVDC. Day to day interface with all ABB parties and the client. Day to day visits to the platform
  • ABB - Commissioning Manager

    Cergy 2012 - 2013 Dolwin Project Holland 100 Million USD

    Duties include

    The coordination of day to day activities related to the workscope of ABB , collation of Product / Design Data in order to produce Commissioning Documentation for the Pre Comm / Comm/ Start Up of the Dolwin Platform

    Writing detailed reports on the day to day issues / attending meetings thereon.

    The writing of the documentation covering the commissioning of all of the equipment from ABB HVDC. Day to day interface with all ABB parties and the client. Day to day visits to the platform
  • ABB - Commissioning Manager

    Cergy 2012 - 2013 Dolwin Project Holland 100 Million USD

    Duties include

    The coordination of day to day activities related to the workscope of ABB , collation of Product / Design Data in order to produce Commissioning Documentation for the Pre Comm / Comm/ Start Up of the Dolwin Platform

    Writing detailed reports on the day to day issues / attending meetings thereon.

    The writing of the documentation covering the commissioning of all of the equipment from ABB HVDC. Day to day interface with all ABB parties and the client. Day to day visits to the platform
  • ABB - Commissioning Manager

    Cergy 2012 - 2013 Dolwin Project Holland 100 Million USD

    Duties include

    The coordination of day to day activities related to the workscope of ABB , collation of Product / Design Data in order to produce Commissioning Documentation for the Pre Comm / Comm/ Start Up of the Dolwin Platform

    Writing detailed reports on the day to day issues / attending meetings thereon.

    The writing of the documentation covering the commissioning of all of the equipment from ABB HVDC. Day to day interface with all ABB parties and the client. Day to day visits to the platform
  • ABB - Commissioning Manager

    Cergy 2012 - 2013 Dolwin Project Holland 100 Million USD

    Duties include

    The coordination of day to day activities related to the workscope of ABB , collation of Product / Design Data in order to produce Commissioning Documentation for the Pre Comm / Comm/ Start Up of the Dolwin Platform

    Writing detailed reports on the day to day issues / attending meetings thereon.

    The writing of the documentation covering the commissioning of all of the equipment from ABB HVDC. Day to day interface with all ABB parties and the client. Day to day visits to the platform
  • ABB - Commissioning Manager

    Cergy 2012 - 2013 Dolwin Project Holland 100 Million USD

    Duties include

    The coordination of day to day activities related to the workscope of ABB , collation of Product / Design Data in order to produce Commissioning Documentation for the Pre Comm / Comm/ Start Up of the Dolwin Platform

    Writing detailed reports on the day to day issues / attending meetings thereon.

    The writing of the documentation covering the commissioning of all of the equipment from ABB HVDC. Day to day interface with all ABB parties and the client. Day to day visits to the platform
  • ABB - Commissioning Manager

    Cergy 2012 - 2013 Dolwin Project Holland 100 Million USD

    Duties include

    The coordination of day to day activities related to the workscope of ABB , collation of Product / Design Data in order to produce Commissioning Documentation for the Pre Comm / Comm/ Start Up of the Dolwin Platform

    Writing detailed reports on the day to day issues / attending meetings thereon.

    The writing of the documentation covering the commissioning of all of the equipment from ABB HVDC. Day to day interface with all ABB parties and the client. Day to day visits to the platform
  • ABB - Commissioning Manager

    Cergy 2012 - 2013 Dolwin Project Holland 100 Million USD

    Duties include

    The coordination of day to day activities related to the workscope of ABB , collation of Product / Design Data in order to produce Commissioning Documentation for the Pre Comm / Comm/ Start Up of the Dolwin Platform

    Writing detailed reports on the day to day issues / attending meetings thereon.

    The writing of the documentation covering the commissioning of all of the equipment from ABB HVDC. Day to day interface with all ABB parties and the client. Day to day visits to the platform
  • ABB - Commissioning Manager

    Cergy 2012 - 2013 Dolwin Project Holland 100 Million USD

    Duties include

    The coordination of day to day activities related to the workscope of ABB , collation of Product / Design Data in order to produce Commissioning Documentation for the Pre Comm / Comm/ Start Up of the Dolwin Platform

    Writing detailed reports on the day to day issues / attending meetings thereon.

    The writing of the documentation covering the commissioning of all of the equipment from ABB HVDC. Day to day interface with all ABB parties and the client. Day to day visits to the platform
  • ABB - Commissioning Manager

    Cergy 2012 - 2013 Dolwin Project Holland 100 Million USD

    Duties include

    The coordination of day to day activities related to the workscope of ABB , collation of Product / Design Data in order to produce Commissioning Documentation for the Pre Comm / Comm/ Start Up of the Dolwin Platform

    Writing detailed reports on the day to day issues / attending meetings thereon.

    The writing of the documentation covering the commissioning of all of the equipment from ABB HVDC. Day to day interface with all ABB parties and the client. Day to day visits to the platform
  • Commissioning Phase - Project Manager

    2011 - 2012 Project ANOA Phase 4 Project

    Duties include Commissioning Services

    Preparation of the execution of Onshore / Offshore activities in Indonesia including
    Planning
    Pre Commissioning and Commissioning Procedures
    Project Management of the project
    Technical advise on Process Commissioning Phase
    Weekly progress meetings
  • Commissioning Phase - Project Manager

    2011 - 2012 Project ANOA Phase 4 Project

    Duties include Commissioning Services

    Preparation of the execution of Onshore / Offshore activities in Indonesia including
    Planning
    Pre Commissioning and Commissioning Procedures
    Project Management of the project
    Technical advise on Process Commissioning Phase
    Weekly progress meetings
  • Commissioning Phase - Project Manager

    2011 - 2012 Project ANOA Phase 4 Project

    Duties include Commissioning Services

    Preparation of the execution of Onshore / Offshore activities in Indonesia including
    Planning
    Pre Commissioning and Commissioning Procedures
    Project Management of the project
    Technical advise on Process Commissioning Phase
    Weekly progress meetings
  • Commissioning Phase - Project Manager

    2011 - 2012 Project ANOA Phase 4 Project

    Duties include Commissioning Services

    Preparation of the execution of Onshore / Offshore activities in Indonesia including
    Planning
    Pre Commissioning and Commissioning Procedures
    Project Management of the project
    Technical advise on Process Commissioning Phase
    Weekly progress meetings
  • Commissioning Phase - Project Manager

    2011 - 2012 Project ANOA Phase 4 Project

    Duties include Commissioning Services

    Preparation of the execution of Onshore / Offshore activities in Indonesia including
    Planning
    Pre Commissioning and Commissioning Procedures
    Project Management of the project
    Technical advise on Process Commissioning Phase
    Weekly progress meetings
  • Commissioning Phase - Project Manager

    2011 - 2012 Project ANOA Phase 4 Project

    Duties include Commissioning Services

    Preparation of the execution of Onshore / Offshore activities in Indonesia including
    Planning
    Pre Commissioning and Commissioning Procedures
    Project Management of the project
    Technical advise on Process Commissioning Phase
    Weekly progress meetings
  • Commissioning Phase - Project Manager

    2011 - 2012 Project ANOA Phase 4 Project

    Duties include Commissioning Services

    Preparation of the execution of Onshore / Offshore activities in Indonesia including
    Planning
    Pre Commissioning and Commissioning Procedures
    Project Management of the project
    Technical advise on Process Commissioning Phase
    Weekly progress meetings
  • Commissioning Phase - Project Manager

    2011 - 2012 Project ANOA Phase 4 Project

    Duties include Commissioning Services

    Preparation of the execution of Onshore / Offshore activities in Indonesia including
    Planning
    Pre Commissioning and Commissioning Procedures
    Project Management of the project
    Technical advise on Process Commissioning Phase
    Weekly progress meetings
  • Commissioning Phase - Project Manager

    2011 - 2012 Project ANOA Phase 4 Project

    Duties include Commissioning Services

    Preparation of the execution of Onshore / Offshore activities in Indonesia including
    Planning
    Pre Commissioning and Commissioning Procedures
    Project Management of the project
    Technical advise on Process Commissioning Phase
    Weekly progress meetings
  • Commissioning Phase - Project Manager

    2011 - 2012 Project ANOA Phase 4 Project

    Duties include Commissioning Services

    Preparation of the execution of Onshore / Offshore activities in Indonesia including
    Planning
    Pre Commissioning and Commissioning Procedures
    Project Management of the project
    Technical advise on Process Commissioning Phase
    Weekly progress meetings
  • SPIE - Commissioning Manager

    Cergy 2011 - 2011 Duties included

    The pre-works for the hull commissioning works for the Octabuoy project (being built in China and being floated to Norway) where it would be assembled with the Topside , before being put into operation in the North Sea.
    Pre-commissioning Procedures / Commissioning Procedures generated for the Hull and Liaison with the topside.
  • SPIE - Commissioning Manager

    Cergy 2011 - 2011 Duties included

    The pre-works for the hull commissioning works for the Octabuoy project (being built in China and being floated to Norway) where it would be assembled with the Topside , before being put into operation in the North Sea.
    Pre-commissioning Procedures / Commissioning Procedures generated for the Hull and Liaison with the topside.
  • SPIE - Commissioning Manager

    Cergy 2011 - 2011 Duties included

    The pre-works for the hull commissioning works for the Octabuoy project (being built in China and being floated to Norway) where it would be assembled with the Topside , before being put into operation in the North Sea.
    Pre-commissioning Procedures / Commissioning Procedures generated for the Hull and Liaison with the topside.
  • SPIE - Commissioning Manager

    Cergy 2011 - 2011 Duties included

    The pre-works for the hull commissioning works for the Octabuoy project (being built in China and being floated to Norway) where it would be assembled with the Topside , before being put into operation in the North Sea.
    Pre-commissioning Procedures / Commissioning Procedures generated for the Hull and Liaison with the topside.
  • SPIE - Commissioning Manager

    Cergy 2011 - 2011 Duties included

    The pre-works for the hull commissioning works for the Octabuoy project (being built in China and being floated to Norway) where it would be assembled with the Topside , before being put into operation in the North Sea.
    Pre-commissioning Procedures / Commissioning Procedures generated for the Hull and Liaison with the topside.
  • SPIE - Commissioning Manager

    Cergy 2011 - 2011 Duties included

    The pre-works for the hull commissioning works for the Octabuoy project (being built in China and being floated to Norway) where it would be assembled with the Topside , before being put into operation in the North Sea.
    Pre-commissioning Procedures / Commissioning Procedures generated for the Hull and Liaison with the topside.
  • SPIE - Commissioning Manager

    Cergy 2011 - 2011 Duties included

    The pre-works for the hull commissioning works for the Octabuoy project (being built in China and being floated to Norway) where it would be assembled with the Topside , before being put into operation in the North Sea.
    Pre-commissioning Procedures / Commissioning Procedures generated for the Hull and Liaison with the topside.
  • SPIE - Commissioning Manager

    Cergy 2011 - 2011 Duties included

    The pre-works for the hull commissioning works for the Octabuoy project (being built in China and being floated to Norway) where it would be assembled with the Topside , before being put into operation in the North Sea.
    Pre-commissioning Procedures / Commissioning Procedures generated for the Hull and Liaison with the topside.
  • SPIE - Commissioning Manager

    Cergy 2011 - 2011 Duties included

    The pre-works for the hull commissioning works for the Octabuoy project (being built in China and being floated to Norway) where it would be assembled with the Topside , before being put into operation in the North Sea.
    Pre-commissioning Procedures / Commissioning Procedures generated for the Hull and Liaison with the topside.
  • SPIE - Commissioning Manager

    Cergy 2011 - 2011 Duties included

    The pre-works for the hull commissioning works for the Octabuoy project (being built in China and being floated to Norway) where it would be assembled with the Topside , before being put into operation in the North Sea.
    Pre-commissioning Procedures / Commissioning Procedures generated for the Hull and Liaison with the topside.
  • Jacobs - Commissioning Manager

    Pasadena 2011 - 2011 To carry out the pre - works for the preparation of the commissioning phase
  • Shell Wesseling REFINERY Near - Commissioning Manager

    2010 - 2011 Early Commissioning Activities including Review of established commissioning systems

    Coordination with existing Civil and Process Teams

    Assisted in the development of the Work Execution Flow Scheme (WEFS)

    Developed the Project Commissioning Plan and Commissioning Procedures

    Whilst respecting all of the refinery specifications and safety standards

    Developed the Commissioning System Dossiers respecting all of the Refinery safety standards
  • Shell Wesseling REFINERY Near - Commissioning Manager

    2010 - 2011 Early Commissioning Activities including Review of established commissioning systems

    Coordination with existing Civil and Process Teams

    Assisted in the development of the Work Execution Flow Scheme (WEFS)

    Developed the Project Commissioning Plan and Commissioning Procedures

    Whilst respecting all of the refinery specifications and safety standards

    Developed the Commissioning System Dossiers respecting all of the Refinery safety standards
  • Shell Wesseling REFINERY Near - Commissioning Manager

    2010 - 2011 Early Commissioning Activities including Review of established commissioning systems

    Coordination with existing Civil and Process Teams

    Assisted in the development of the Work Execution Flow Scheme (WEFS)

    Developed the Project Commissioning Plan and Commissioning Procedures

    Whilst respecting all of the refinery specifications and safety standards

    Developed the Commissioning System Dossiers respecting all of the Refinery safety standards
  • Shell Wesseling REFINERY Near - Commissioning Manager

    2010 - 2011 Early Commissioning Activities including Review of established commissioning systems

    Coordination with existing Civil and Process Teams

    Assisted in the development of the Work Execution Flow Scheme (WEFS)

    Developed the Project Commissioning Plan and Commissioning Procedures

    Whilst respecting all of the refinery specifications and safety standards

    Developed the Commissioning System Dossiers respecting all of the Refinery safety standards
  • Shell Wesseling REFINERY Near - Commissioning Manager

    2010 - 2011 Early Commissioning Activities including Review of established commissioning systems

    Coordination with existing Civil and Process Teams

    Assisted in the development of the Work Execution Flow Scheme (WEFS)

    Developed the Project Commissioning Plan and Commissioning Procedures

    Whilst respecting all of the refinery specifications and safety standards

    Developed the Commissioning System Dossiers respecting all of the Refinery safety standards
  • Shell Wesseling REFINERY Near - Commissioning Manager

    2010 - 2011 Early Commissioning Activities including Review of established commissioning systems

    Coordination with existing Civil and Process Teams

    Assisted in the development of the Work Execution Flow Scheme (WEFS)

    Developed the Project Commissioning Plan and Commissioning Procedures

    Whilst respecting all of the refinery specifications and safety standards

    Developed the Commissioning System Dossiers respecting all of the Refinery safety standards
  • Shell Wesseling REFINERY Near - Commissioning Manager

    2010 - 2011 Early Commissioning Activities including Review of established commissioning systems

    Coordination with existing Civil and Process Teams

    Assisted in the development of the Work Execution Flow Scheme (WEFS)

    Developed the Project Commissioning Plan and Commissioning Procedures

    Whilst respecting all of the refinery specifications and safety standards

    Developed the Commissioning System Dossiers respecting all of the Refinery safety standards
  • Shell Wesseling REFINERY Near - Commissioning Manager

    2010 - 2011 Early Commissioning Activities including Review of established commissioning systems

    Coordination with existing Civil and Process Teams

    Assisted in the development of the Work Execution Flow Scheme (WEFS)

    Developed the Project Commissioning Plan and Commissioning Procedures

    Whilst respecting all of the refinery specifications and safety standards

    Developed the Commissioning System Dossiers respecting all of the Refinery safety standards
  • Shell Wesseling REFINERY Near - Commissioning Manager

    2010 - 2011 Early Commissioning Activities including Review of established commissioning systems

    Coordination with existing Civil and Process Teams

    Assisted in the development of the Work Execution Flow Scheme (WEFS)

    Developed the Project Commissioning Plan and Commissioning Procedures

    Whilst respecting all of the refinery specifications and safety standards

    Developed the Commissioning System Dossiers respecting all of the Refinery safety standards
  • Shell Wesseling REFINERY Near - Commissioning Manager

    2010 - 2011 Early Commissioning Activities including Review of established commissioning systems

    Coordination with existing Civil and Process Teams

    Assisted in the development of the Work Execution Flow Scheme (WEFS)

    Developed the Project Commissioning Plan and Commissioning Procedures

    Whilst respecting all of the refinery specifications and safety standards

    Developed the Commissioning System Dossiers respecting all of the Refinery safety standards
  • the Head Office - Project Manager & Commissioning Manager

    2008 - 2009 Land + Marine UK

    Working in the Head Office in Bromborough on the Admin for the two Emissions Reduction Projects - one in Kirriemuir and the other in St Fergus Scotland followed by the relocation to site at Kirriemuir for the Management / Administration and liaison with the client (National Grid / Scottish Electricity Board) and the Instrumentation sub contractors RR and Siemens and designer (IMEG), and attending Managerial meetings.Generation of Commissioning Documentation.
  • the Head Office - Project Manager & Commissioning Manager

    2008 - 2009 Land + Marine UK

    Working in the Head Office in Bromborough on the Admin for the two Emissions Reduction Projects - one in Kirriemuir and the other in St Fergus Scotland followed by the relocation to site at Kirriemuir for the Management / Administration and liaison with the client (National Grid / Scottish Electricity Board) and the Instrumentation sub contractors RR and Siemens and designer (IMEG), and attending Managerial meetings.Generation of Commissioning Documentation.
  • the Head Office - Project Manager & Commissioning Manager

    2008 - 2009 Land + Marine UK

    Working in the Head Office in Bromborough on the Admin for the two Emissions Reduction Projects - one in Kirriemuir and the other in St Fergus Scotland followed by the relocation to site at Kirriemuir for the Management / Administration and liaison with the client (National Grid / Scottish Electricity Board) and the Instrumentation sub contractors RR and Siemens and designer (IMEG), and attending Managerial meetings.Generation of Commissioning Documentation.
  • the Head Office - Project Manager & Commissioning Manager

    2008 - 2009 Land + Marine UK

    Working in the Head Office in Bromborough on the Admin for the two Emissions Reduction Projects - one in Kirriemuir and the other in St Fergus Scotland followed by the relocation to site at Kirriemuir for the Management / Administration and liaison with the client (National Grid / Scottish Electricity Board) and the Instrumentation sub contractors RR and Siemens and designer (IMEG), and attending Managerial meetings.Generation of Commissioning Documentation.
  • the Head Office - Project Manager & Commissioning Manager

    2008 - 2009 Land + Marine UK

    Working in the Head Office in Bromborough on the Admin for the two Emissions Reduction Projects - one in Kirriemuir and the other in St Fergus Scotland followed by the relocation to site at Kirriemuir for the Management / Administration and liaison with the client (National Grid / Scottish Electricity Board) and the Instrumentation sub contractors RR and Siemens and designer (IMEG), and attending Managerial meetings.Generation of Commissioning Documentation.
  • the Head Office - Project Manager & Commissioning Manager

    2008 - 2009 Land + Marine UK

    Working in the Head Office in Bromborough on the Admin for the two Emissions Reduction Projects - one in Kirriemuir and the other in St Fergus Scotland followed by the relocation to site at Kirriemuir for the Management / Administration and liaison with the client (National Grid / Scottish Electricity Board) and the Instrumentation sub contractors RR and Siemens and designer (IMEG), and attending Managerial meetings.Generation of Commissioning Documentation.
  • the Head Office - Project Manager & Commissioning Manager

    2008 - 2009 Land + Marine UK

    Working in the Head Office in Bromborough on the Admin for the two Emissions Reduction Projects - one in Kirriemuir and the other in St Fergus Scotland followed by the relocation to site at Kirriemuir for the Management / Administration and liaison with the client (National Grid / Scottish Electricity Board) and the Instrumentation sub contractors RR and Siemens and designer (IMEG), and attending Managerial meetings.Generation of Commissioning Documentation.
  • the Head Office - Project Manager & Commissioning Manager

    2008 - 2009 Land + Marine UK

    Working in the Head Office in Bromborough on the Admin for the two Emissions Reduction Projects - one in Kirriemuir and the other in St Fergus Scotland followed by the relocation to site at Kirriemuir for the Management / Administration and liaison with the client (National Grid / Scottish Electricity Board) and the Instrumentation sub contractors RR and Siemens and designer (IMEG), and attending Managerial meetings.Generation of Commissioning Documentation.
  • the Head Office - Project Manager & Commissioning Manager

    2008 - 2009 Land + Marine UK

    Working in the Head Office in Bromborough on the Admin for the two Emissions Reduction Projects - one in Kirriemuir and the other in St Fergus Scotland followed by the relocation to site at Kirriemuir for the Management / Administration and liaison with the client (National Grid / Scottish Electricity Board) and the Instrumentation sub contractors RR and Siemens and designer (IMEG), and attending Managerial meetings.Generation of Commissioning Documentation.
  • the Head Office - Project Manager & Commissioning Manager

    2008 - 2009 Land + Marine UK

    Working in the Head Office in Bromborough on the Admin for the two Emissions Reduction Projects - one in Kirriemuir and the other in St Fergus Scotland followed by the relocation to site at Kirriemuir for the Management / Administration and liaison with the client (National Grid / Scottish Electricity Board) and the Instrumentation sub contractors RR and Siemens and designer (IMEG), and attending Managerial meetings.Generation of Commissioning Documentation.
  • Land and Marine - Project Manager

    2007 - 2008 Khalda Petroleum Western Desert Egypt

    Duties include

    Supervising and advising Khalda Personnel on the day to day callouts and subsequent troubleshooting fault find and repair of a total of 20 turbines throughout the field including Taurus 60 Centaur 40 and Mars 100 Models , including PLC and related instrumentation, PT TT FT etc etc combined with routine servicing of the machines ie 4000 hour 8000 hour and engine changeouts , precomm / commissioning.
  • Land and Marine - Project Manager

    2007 - 2008 Khalda Petroleum Western Desert Egypt

    Duties include

    Supervising and advising Khalda Personnel on the day to day callouts and subsequent troubleshooting fault find and repair of a total of 20 turbines throughout the field including Taurus 60 Centaur 40 and Mars 100 Models , including PLC and related instrumentation, PT TT FT etc etc combined with routine servicing of the machines ie 4000 hour 8000 hour and engine changeouts , precomm / commissioning.
  • Land and Marine - Project Manager

    2007 - 2008 Khalda Petroleum Western Desert Egypt

    Duties include

    Supervising and advising Khalda Personnel on the day to day callouts and subsequent troubleshooting fault find and repair of a total of 20 turbines throughout the field including Taurus 60 Centaur 40 and Mars 100 Models , including PLC and related instrumentation, PT TT FT etc etc combined with routine servicing of the machines ie 4000 hour 8000 hour and engine changeouts , precomm / commissioning.
  • Land and Marine - Project Manager

    2007 - 2008 Khalda Petroleum Western Desert Egypt

    Duties include

    Supervising and advising Khalda Personnel on the day to day callouts and subsequent troubleshooting fault find and repair of a total of 20 turbines throughout the field including Taurus 60 Centaur 40 and Mars 100 Models , including PLC and related instrumentation, PT TT FT etc etc combined with routine servicing of the machines ie 4000 hour 8000 hour and engine changeouts , precomm / commissioning.
  • Land and Marine - Project Manager

    2007 - 2008 Khalda Petroleum Western Desert Egypt

    Duties include

    Supervising and advising Khalda Personnel on the day to day callouts and subsequent troubleshooting fault find and repair of a total of 20 turbines throughout the field including Taurus 60 Centaur 40 and Mars 100 Models , including PLC and related instrumentation, PT TT FT etc etc combined with routine servicing of the machines ie 4000 hour 8000 hour and engine changeouts , precomm / commissioning.
  • Land and Marine - Project Manager

    2007 - 2008 Khalda Petroleum Western Desert Egypt

    Duties include

    Supervising and advising Khalda Personnel on the day to day callouts and subsequent troubleshooting fault find and repair of a total of 20 turbines throughout the field including Taurus 60 Centaur 40 and Mars 100 Models , including PLC and related instrumentation, PT TT FT etc etc combined with routine servicing of the machines ie 4000 hour 8000 hour and engine changeouts , precomm / commissioning.
  • Land and Marine - Project Manager

    2007 - 2008 Khalda Petroleum Western Desert Egypt

    Duties include

    Supervising and advising Khalda Personnel on the day to day callouts and subsequent troubleshooting fault find and repair of a total of 20 turbines throughout the field including Taurus 60 Centaur 40 and Mars 100 Models , including PLC and related instrumentation, PT TT FT etc etc combined with routine servicing of the machines ie 4000 hour 8000 hour and engine changeouts , precomm / commissioning.
  • Land and Marine - Project Manager

    2007 - 2008 Khalda Petroleum Western Desert Egypt

    Duties include

    Supervising and advising Khalda Personnel on the day to day callouts and subsequent troubleshooting fault find and repair of a total of 20 turbines throughout the field including Taurus 60 Centaur 40 and Mars 100 Models , including PLC and related instrumentation, PT TT FT etc etc combined with routine servicing of the machines ie 4000 hour 8000 hour and engine changeouts , precomm / commissioning.
  • Land and Marine - Project Manager

    2007 - 2008 Khalda Petroleum Western Desert Egypt

    Duties include

    Supervising and advising Khalda Personnel on the day to day callouts and subsequent troubleshooting fault find and repair of a total of 20 turbines throughout the field including Taurus 60 Centaur 40 and Mars 100 Models , including PLC and related instrumentation, PT TT FT etc etc combined with routine servicing of the machines ie 4000 hour 8000 hour and engine changeouts , precomm / commissioning.
  • Land and Marine - Project Manager

    2007 - 2008 Khalda Petroleum Western Desert Egypt

    Duties include

    Supervising and advising Khalda Personnel on the day to day callouts and subsequent troubleshooting fault find and repair of a total of 20 turbines throughout the field including Taurus 60 Centaur 40 and Mars 100 Models , including PLC and related instrumentation, PT TT FT etc etc combined with routine servicing of the machines ie 4000 hour 8000 hour and engine changeouts , precomm / commissioning.
  • Pratt and Whitney - Consultant Project Manager

    2006 - 2006 Duties include

    Contractual Meetings held in the USA and FRANCE regarding the Moscow project and the Islands project. Discussions held re the logistics and technical details of supply and installation / commissioning of the Pratt and Whitney Products in both projects
  • Pratt and Whitney - Consultant Project Manager

    2006 - 2006 Duties include

    Contractual Meetings held in the USA and FRANCE regarding the Moscow project and the Islands project. Discussions held re the logistics and technical details of supply and installation / commissioning of the Pratt and Whitney Products in both projects
  • Pratt and Whitney - Consultant Project Manager

    2006 - 2006 Duties include

    Contractual Meetings held in the USA and FRANCE regarding the Moscow project and the Islands project. Discussions held re the logistics and technical details of supply and installation / commissioning of the Pratt and Whitney Products in both projects
  • Pratt and Whitney - Consultant Project Manager

    2006 - 2006 Duties include

    Contractual Meetings held in the USA and FRANCE regarding the Moscow project and the Islands project. Discussions held re the logistics and technical details of supply and installation / commissioning of the Pratt and Whitney Products in both projects
  • Pratt and Whitney - Consultant Project Manager

    2006 - 2006 Duties include

    Contractual Meetings held in the USA and FRANCE regarding the Moscow project and the Islands project. Discussions held re the logistics and technical details of supply and installation / commissioning of the Pratt and Whitney Products in both projects
  • Pratt and Whitney - Consultant Project Manager

    2006 - 2006 Duties include

    Contractual Meetings held in the USA and FRANCE regarding the Moscow project and the Islands project. Discussions held re the logistics and technical details of supply and installation / commissioning of the Pratt and Whitney Products in both projects
  • Pratt and Whitney - Consultant Project Manager

    2006 - 2006 Duties include

    Contractual Meetings held in the USA and FRANCE regarding the Moscow project and the Islands project. Discussions held re the logistics and technical details of supply and installation / commissioning of the Pratt and Whitney Products in both projects
  • Pratt and Whitney - Consultant Project Manager

    2006 - 2006 Duties include

    Contractual Meetings held in the USA and FRANCE regarding the Moscow project and the Islands project. Discussions held re the logistics and technical details of supply and installation / commissioning of the Pratt and Whitney Products in both projects
  • Pratt and Whitney - Consultant Project Manager

    2006 - 2006 Duties include

    Contractual Meetings held in the USA and FRANCE regarding the Moscow project and the Islands project. Discussions held re the logistics and technical details of supply and installation / commissioning of the Pratt and Whitney Products in both projects
  • Pratt and Whitney - Consultant Project Manager

    2006 - 2006 Duties include

    Contractual Meetings held in the USA and FRANCE regarding the Moscow project and the Islands project. Discussions held re the logistics and technical details of supply and installation / commissioning of the Pratt and Whitney Products in both projects
  • Solar Turbines - Site Project Manager

    2006 - 2007 Turkish Petroleum Silivri Refinery Turkey

    Duties included

    The Project Management and control of the test fault find pre-commissioning ,commissioning and Start up to varying degrees of 3 Mars 100 and 1 Taurus 60 Turbine Units and associated Control Systems and instrumentation.Tests carried out included the Surge Test for the Siemens Compressors and Safety Logic for both Turbines and Compressors.All works carried out whilst respecting the Refinery safety standards and specifications

    Lukoil -Western Siberia Ltd JSC Gas Processing Complex Gas Refinery Lokosovskiy Siberia

    Duties included

    To carry out final debugging of control systems on the Centaur 50 Turbine followed by the presentation and opening by the President of Lukoil, and overseeing the day to day operation of the Turbine / Compressor thereafter.whilst respecting the Refinery Standards and safety rules.

    Sakhalin Export Terminal Russia

    Commissioning Engineer Supervisor

    Duties included

    The Cold Loop Check and Hot Loop Check of both Instrumentation and Electrical systems on and around the Gen Set and Solar Taurus 60 Turbine.

    Latvijas Gaz Inchukalns Latvia

    Commissioning Engineer Supervisor

    Duties included

    Carrying out cold loop checks followed by hot loop checks on the instrumentation ,control and electrical systems on and around the Solar Mars 100 Turbine and Dresser Rand Compressor.
  • Solar Turbines - Site Project Manager

    2006 - 2007 Turkish Petroleum Silivri Refinery Turkey

    Duties included

    The Project Management and control of the test fault find pre-commissioning ,commissioning and Start up to varying degrees of 3 Mars 100 and 1 Taurus 60 Turbine Units and associated Control Systems and instrumentation.Tests carried out included the Surge Test for the Siemens Compressors and Safety Logic for both Turbines and Compressors.All works carried out whilst respecting the Refinery safety standards and specifications

    Lukoil -Western Siberia Ltd JSC Gas Processing Complex Gas Refinery Lokosovskiy Siberia

    Duties included

    To carry out final debugging of control systems on the Centaur 50 Turbine followed by the presentation and opening by the President of Lukoil, and overseeing the day to day operation of the Turbine / Compressor thereafter.whilst respecting the Refinery Standards and safety rules.

    Sakhalin Export Terminal Russia

    Commissioning Engineer Supervisor

    Duties included

    The Cold Loop Check and Hot Loop Check of both Instrumentation and Electrical systems on and around the Gen Set and Solar Taurus 60 Turbine.

    Latvijas Gaz Inchukalns Latvia

    Commissioning Engineer Supervisor

    Duties included

    Carrying out cold loop checks followed by hot loop checks on the instrumentation ,control and electrical systems on and around the Solar Mars 100 Turbine and Dresser Rand Compressor.
  • Solar Turbines - Site Project Manager

    2006 - 2007 Turkish Petroleum Silivri Refinery Turkey

    Duties included

    The Project Management and control of the test fault find pre-commissioning ,commissioning and Start up to varying degrees of 3 Mars 100 and 1 Taurus 60 Turbine Units and associated Control Systems and instrumentation.Tests carried out included the Surge Test for the Siemens Compressors and Safety Logic for both Turbines and Compressors.All works carried out whilst respecting the Refinery safety standards and specifications

    Lukoil -Western Siberia Ltd JSC Gas Processing Complex Gas Refinery Lokosovskiy Siberia

    Duties included

    To carry out final debugging of control systems on the Centaur 50 Turbine followed by the presentation and opening by the President of Lukoil, and overseeing the day to day operation of the Turbine / Compressor thereafter.whilst respecting the Refinery Standards and safety rules.

    Sakhalin Export Terminal Russia

    Commissioning Engineer Supervisor

    Duties included

    The Cold Loop Check and Hot Loop Check of both Instrumentation and Electrical systems on and around the Gen Set and Solar Taurus 60 Turbine.

    Latvijas Gaz Inchukalns Latvia

    Commissioning Engineer Supervisor

    Duties included

    Carrying out cold loop checks followed by hot loop checks on the instrumentation ,control and electrical systems on and around the Solar Mars 100 Turbine and Dresser Rand Compressor.
  • Solar Turbines - Site Project Manager

    2006 - 2007 Turkish Petroleum Silivri Refinery Turkey

    Duties included

    The Project Management and control of the test fault find pre-commissioning ,commissioning and Start up to varying degrees of 3 Mars 100 and 1 Taurus 60 Turbine Units and associated Control Systems and instrumentation.Tests carried out included the Surge Test for the Siemens Compressors and Safety Logic for both Turbines and Compressors.All works carried out whilst respecting the Refinery safety standards and specifications

    Lukoil -Western Siberia Ltd JSC Gas Processing Complex Gas Refinery Lokosovskiy Siberia

    Duties included

    To carry out final debugging of control systems on the Centaur 50 Turbine followed by the presentation and opening by the President of Lukoil, and overseeing the day to day operation of the Turbine / Compressor thereafter.whilst respecting the Refinery Standards and safety rules.

    Sakhalin Export Terminal Russia

    Commissioning Engineer Supervisor

    Duties included

    The Cold Loop Check and Hot Loop Check of both Instrumentation and Electrical systems on and around the Gen Set and Solar Taurus 60 Turbine.

    Latvijas Gaz Inchukalns Latvia

    Commissioning Engineer Supervisor

    Duties included

    Carrying out cold loop checks followed by hot loop checks on the instrumentation ,control and electrical systems on and around the Solar Mars 100 Turbine and Dresser Rand Compressor.
  • Solar Turbines - Site Project Manager

    2006 - 2007 Turkish Petroleum Silivri Refinery Turkey

    Duties included

    The Project Management and control of the test fault find pre-commissioning ,commissioning and Start up to varying degrees of 3 Mars 100 and 1 Taurus 60 Turbine Units and associated Control Systems and instrumentation.Tests carried out included the Surge Test for the Siemens Compressors and Safety Logic for both Turbines and Compressors.All works carried out whilst respecting the Refinery safety standards and specifications

    Lukoil -Western Siberia Ltd JSC Gas Processing Complex Gas Refinery Lokosovskiy Siberia

    Duties included

    To carry out final debugging of control systems on the Centaur 50 Turbine followed by the presentation and opening by the President of Lukoil, and overseeing the day to day operation of the Turbine / Compressor thereafter.whilst respecting the Refinery Standards and safety rules.

    Sakhalin Export Terminal Russia

    Commissioning Engineer Supervisor

    Duties included

    The Cold Loop Check and Hot Loop Check of both Instrumentation and Electrical systems on and around the Gen Set and Solar Taurus 60 Turbine.

    Latvijas Gaz Inchukalns Latvia

    Commissioning Engineer Supervisor

    Duties included

    Carrying out cold loop checks followed by hot loop checks on the instrumentation ,control and electrical systems on and around the Solar Mars 100 Turbine and Dresser Rand Compressor.
  • Solar Turbines - Site Project Manager

    2006 - 2007 Turkish Petroleum Silivri Refinery Turkey

    Duties included

    The Project Management and control of the test fault find pre-commissioning ,commissioning and Start up to varying degrees of 3 Mars 100 and 1 Taurus 60 Turbine Units and associated Control Systems and instrumentation.Tests carried out included the Surge Test for the Siemens Compressors and Safety Logic for both Turbines and Compressors.All works carried out whilst respecting the Refinery safety standards and specifications

    Lukoil -Western Siberia Ltd JSC Gas Processing Complex Gas Refinery Lokosovskiy Siberia

    Duties included

    To carry out final debugging of control systems on the Centaur 50 Turbine followed by the presentation and opening by the President of Lukoil, and overseeing the day to day operation of the Turbine / Compressor thereafter.whilst respecting the Refinery Standards and safety rules.

    Sakhalin Export Terminal Russia

    Commissioning Engineer Supervisor

    Duties included

    The Cold Loop Check and Hot Loop Check of both Instrumentation and Electrical systems on and around the Gen Set and Solar Taurus 60 Turbine.

    Latvijas Gaz Inchukalns Latvia

    Commissioning Engineer Supervisor

    Duties included

    Carrying out cold loop checks followed by hot loop checks on the instrumentation ,control and electrical systems on and around the Solar Mars 100 Turbine and Dresser Rand Compressor.
  • Solar Turbines - Site Project Manager

    2006 - 2007 Turkish Petroleum Silivri Refinery Turkey

    Duties included

    The Project Management and control of the test fault find pre-commissioning ,commissioning and Start up to varying degrees of 3 Mars 100 and 1 Taurus 60 Turbine Units and associated Control Systems and instrumentation.Tests carried out included the Surge Test for the Siemens Compressors and Safety Logic for both Turbines and Compressors.All works carried out whilst respecting the Refinery safety standards and specifications

    Lukoil -Western Siberia Ltd JSC Gas Processing Complex Gas Refinery Lokosovskiy Siberia

    Duties included

    To carry out final debugging of control systems on the Centaur 50 Turbine followed by the presentation and opening by the President of Lukoil, and overseeing the day to day operation of the Turbine / Compressor thereafter.whilst respecting the Refinery Standards and safety rules.

    Sakhalin Export Terminal Russia

    Commissioning Engineer Supervisor

    Duties included

    The Cold Loop Check and Hot Loop Check of both Instrumentation and Electrical systems on and around the Gen Set and Solar Taurus 60 Turbine.

    Latvijas Gaz Inchukalns Latvia

    Commissioning Engineer Supervisor

    Duties included

    Carrying out cold loop checks followed by hot loop checks on the instrumentation ,control and electrical systems on and around the Solar Mars 100 Turbine and Dresser Rand Compressor.
  • Solar Turbines - Site Project Manager

    2006 - 2007 Turkish Petroleum Silivri Refinery Turkey

    Duties included

    The Project Management and control of the test fault find pre-commissioning ,commissioning and Start up to varying degrees of 3 Mars 100 and 1 Taurus 60 Turbine Units and associated Control Systems and instrumentation.Tests carried out included the Surge Test for the Siemens Compressors and Safety Logic for both Turbines and Compressors.All works carried out whilst respecting the Refinery safety standards and specifications

    Lukoil -Western Siberia Ltd JSC Gas Processing Complex Gas Refinery Lokosovskiy Siberia

    Duties included

    To carry out final debugging of control systems on the Centaur 50 Turbine followed by the presentation and opening by the President of Lukoil, and overseeing the day to day operation of the Turbine / Compressor thereafter.whilst respecting the Refinery Standards and safety rules.

    Sakhalin Export Terminal Russia

    Commissioning Engineer Supervisor

    Duties included

    The Cold Loop Check and Hot Loop Check of both Instrumentation and Electrical systems on and around the Gen Set and Solar Taurus 60 Turbine.

    Latvijas Gaz Inchukalns Latvia

    Commissioning Engineer Supervisor

    Duties included

    Carrying out cold loop checks followed by hot loop checks on the instrumentation ,control and electrical systems on and around the Solar Mars 100 Turbine and Dresser Rand Compressor.
  • Solar Turbines - Site Project Manager

    2006 - 2007 Turkish Petroleum Silivri Refinery Turkey

    Duties included

    The Project Management and control of the test fault find pre-commissioning ,commissioning and Start up to varying degrees of 3 Mars 100 and 1 Taurus 60 Turbine Units and associated Control Systems and instrumentation.Tests carried out included the Surge Test for the Siemens Compressors and Safety Logic for both Turbines and Compressors.All works carried out whilst respecting the Refinery safety standards and specifications

    Lukoil -Western Siberia Ltd JSC Gas Processing Complex Gas Refinery Lokosovskiy Siberia

    Duties included

    To carry out final debugging of control systems on the Centaur 50 Turbine followed by the presentation and opening by the President of Lukoil, and overseeing the day to day operation of the Turbine / Compressor thereafter.whilst respecting the Refinery Standards and safety rules.

    Sakhalin Export Terminal Russia

    Commissioning Engineer Supervisor

    Duties included

    The Cold Loop Check and Hot Loop Check of both Instrumentation and Electrical systems on and around the Gen Set and Solar Taurus 60 Turbine.

    Latvijas Gaz Inchukalns Latvia

    Commissioning Engineer Supervisor

    Duties included

    Carrying out cold loop checks followed by hot loop checks on the instrumentation ,control and electrical systems on and around the Solar Mars 100 Turbine and Dresser Rand Compressor.
  • Solar Turbines - Site Project Manager

    2006 - 2007 Turkish Petroleum Silivri Refinery Turkey

    Duties included

    The Project Management and control of the test fault find pre-commissioning ,commissioning and Start up to varying degrees of 3 Mars 100 and 1 Taurus 60 Turbine Units and associated Control Systems and instrumentation.Tests carried out included the Surge Test for the Siemens Compressors and Safety Logic for both Turbines and Compressors.All works carried out whilst respecting the Refinery safety standards and specifications

    Lukoil -Western Siberia Ltd JSC Gas Processing Complex Gas Refinery Lokosovskiy Siberia

    Duties included

    To carry out final debugging of control systems on the Centaur 50 Turbine followed by the presentation and opening by the President of Lukoil, and overseeing the day to day operation of the Turbine / Compressor thereafter.whilst respecting the Refinery Standards and safety rules.

    Sakhalin Export Terminal Russia

    Commissioning Engineer Supervisor

    Duties included

    The Cold Loop Check and Hot Loop Check of both Instrumentation and Electrical systems on and around the Gen Set and Solar Taurus 60 Turbine.

    Latvijas Gaz Inchukalns Latvia

    Commissioning Engineer Supervisor

    Duties included

    Carrying out cold loop checks followed by hot loop checks on the instrumentation ,control and electrical systems on and around the Solar Mars 100 Turbine and Dresser Rand Compressor.
  • Solar Turbines - Commissioning Engineer

    2005 - 2006 Duties included

    The test fault find followed by pre-commissioning / commissioning of Solar Turbine and Dresser Rand compressor Installation including all auxiliary instrumentation on the Rig offshore Croatia.
  • Solar Turbines - Commissioning Engineer

    2005 - 2006 Duties included

    The test fault find followed by pre-commissioning / commissioning of Solar Turbine and Dresser Rand compressor Installation including all auxiliary instrumentation on the Rig offshore Croatia.
  • Solar Turbines - Commissioning Engineer

    2005 - 2006 Duties included

    The test fault find followed by pre-commissioning / commissioning of Solar Turbine and Dresser Rand compressor Installation including all auxiliary instrumentation on the Rig offshore Croatia.
  • Solar Turbines - Commissioning Engineer

    2005 - 2006 Duties included

    The test fault find followed by pre-commissioning / commissioning of Solar Turbine and Dresser Rand compressor Installation including all auxiliary instrumentation on the Rig offshore Croatia.
  • Solar Turbines - Commissioning Engineer

    2005 - 2006 Duties included

    The test fault find followed by pre-commissioning / commissioning of Solar Turbine and Dresser Rand compressor Installation including all auxiliary instrumentation on the Rig offshore Croatia.
  • Solar Turbines - Commissioning Engineer

    2005 - 2006 Duties included

    The test fault find followed by pre-commissioning / commissioning of Solar Turbine and Dresser Rand compressor Installation including all auxiliary instrumentation on the Rig offshore Croatia.
  • Solar Turbines - Commissioning Engineer

    2005 - 2006 Duties included

    The test fault find followed by pre-commissioning / commissioning of Solar Turbine and Dresser Rand compressor Installation including all auxiliary instrumentation on the Rig offshore Croatia.
  • Solar Turbines - Commissioning Engineer

    2005 - 2006 Duties included

    The test fault find followed by pre-commissioning / commissioning of Solar Turbine and Dresser Rand compressor Installation including all auxiliary instrumentation on the Rig offshore Croatia.
  • Solar Turbines - Commissioning Engineer

    2005 - 2006 Duties included

    The test fault find followed by pre-commissioning / commissioning of Solar Turbine and Dresser Rand compressor Installation including all auxiliary instrumentation on the Rig offshore Croatia.
  • Solar Turbines - Commissioning Engineer

    2005 - 2006 Duties included

    The test fault find followed by pre-commissioning / commissioning of Solar Turbine and Dresser Rand compressor Installation including all auxiliary instrumentation on the Rig offshore Croatia.
  • KENANA Sugar Company - SENIOR COMMISSIONING ENGINEER

    2005 - 2006 Duties included
    Interfacing with client / client workforce and ensuring that all installation work / pre-commissioning / commissioning is carried out to company standards. Resolving all technical queries regarding the interface of existing plant and the new HONEYWELL scada system / instrumentation/controllers .
  • KENANA Sugar Company - SENIOR COMMISSIONING ENGINEER

    2005 - 2006 Duties included
    Interfacing with client / client workforce and ensuring that all installation work / pre-commissioning / commissioning is carried out to company standards. Resolving all technical queries regarding the interface of existing plant and the new HONEYWELL scada system / instrumentation/controllers .
  • KENANA Sugar Company - SENIOR COMMISSIONING ENGINEER

    2005 - 2006 Duties included
    Interfacing with client / client workforce and ensuring that all installation work / pre-commissioning / commissioning is carried out to company standards. Resolving all technical queries regarding the interface of existing plant and the new HONEYWELL scada system / instrumentation/controllers .
  • KENANA Sugar Company - SENIOR COMMISSIONING ENGINEER

    2005 - 2006 Duties included
    Interfacing with client / client workforce and ensuring that all installation work / pre-commissioning / commissioning is carried out to company standards. Resolving all technical queries regarding the interface of existing plant and the new HONEYWELL scada system / instrumentation/controllers .
  • KENANA Sugar Company - SENIOR COMMISSIONING ENGINEER

    2005 - 2006 Duties included
    Interfacing with client / client workforce and ensuring that all installation work / pre-commissioning / commissioning is carried out to company standards. Resolving all technical queries regarding the interface of existing plant and the new HONEYWELL scada system / instrumentation/controllers .
  • KENANA Sugar Company - SENIOR COMMISSIONING ENGINEER

    2005 - 2006 Duties included
    Interfacing with client / client workforce and ensuring that all installation work / pre-commissioning / commissioning is carried out to company standards. Resolving all technical queries regarding the interface of existing plant and the new HONEYWELL scada system / instrumentation/controllers .
  • KENANA Sugar Company - SENIOR COMMISSIONING ENGINEER

    2005 - 2006 Duties included
    Interfacing with client / client workforce and ensuring that all installation work / pre-commissioning / commissioning is carried out to company standards. Resolving all technical queries regarding the interface of existing plant and the new HONEYWELL scada system / instrumentation/controllers .
  • KENANA Sugar Company - SENIOR COMMISSIONING ENGINEER

    2005 - 2006 Duties included
    Interfacing with client / client workforce and ensuring that all installation work / pre-commissioning / commissioning is carried out to company standards. Resolving all technical queries regarding the interface of existing plant and the new HONEYWELL scada system / instrumentation/controllers .
  • KENANA Sugar Company - SENIOR COMMISSIONING ENGINEER

    2005 - 2006 Duties included
    Interfacing with client / client workforce and ensuring that all installation work / pre-commissioning / commissioning is carried out to company standards. Resolving all technical queries regarding the interface of existing plant and the new HONEYWELL scada system / instrumentation/controllers .
  • KENANA Sugar Company - SENIOR COMMISSIONING ENGINEER

    2005 - 2006 Duties included
    Interfacing with client / client workforce and ensuring that all installation work / pre-commissioning / commissioning is carried out to company standards. Resolving all technical queries regarding the interface of existing plant and the new HONEYWELL scada system / instrumentation/controllers .
  • Compressor Station Korpedje - COMMISSIONING MANAGER

    2004 - 2005 Duties include
    The administration and preparation of project related documentation , along with day to day interface with client and upper management and co-ordination of project commissioning personnel to carry out activities with vendor representatives , followed by the verification of all commissioning results and the overall acceptance on behalf of the client of the Compressor station installation including instrumentation and lv electrical / UPS.
  • Compressor Station Korpedje - COMMISSIONING MANAGER

    2004 - 2005 Duties include
    The administration and preparation of project related documentation , along with day to day interface with client and upper management and co-ordination of project commissioning personnel to carry out activities with vendor representatives , followed by the verification of all commissioning results and the overall acceptance on behalf of the client of the Compressor station installation including instrumentation and lv electrical / UPS.
  • Compressor Station Korpedje - COMMISSIONING MANAGER

    2004 - 2005 Duties include
    The administration and preparation of project related documentation , along with day to day interface with client and upper management and co-ordination of project commissioning personnel to carry out activities with vendor representatives , followed by the verification of all commissioning results and the overall acceptance on behalf of the client of the Compressor station installation including instrumentation and lv electrical / UPS.
  • Compressor Station Korpedje - COMMISSIONING MANAGER

    2004 - 2005 Duties include
    The administration and preparation of project related documentation , along with day to day interface with client and upper management and co-ordination of project commissioning personnel to carry out activities with vendor representatives , followed by the verification of all commissioning results and the overall acceptance on behalf of the client of the Compressor station installation including instrumentation and lv electrical / UPS.
  • Compressor Station Korpedje - COMMISSIONING MANAGER

    2004 - 2005 Duties include
    The administration and preparation of project related documentation , along with day to day interface with client and upper management and co-ordination of project commissioning personnel to carry out activities with vendor representatives , followed by the verification of all commissioning results and the overall acceptance on behalf of the client of the Compressor station installation including instrumentation and lv electrical / UPS.
  • Compressor Station Korpedje - COMMISSIONING MANAGER

    2004 - 2005 Duties include
    The administration and preparation of project related documentation , along with day to day interface with client and upper management and co-ordination of project commissioning personnel to carry out activities with vendor representatives , followed by the verification of all commissioning results and the overall acceptance on behalf of the client of the Compressor station installation including instrumentation and lv electrical / UPS.
  • Compressor Station Korpedje - COMMISSIONING MANAGER

    2004 - 2005 Duties include
    The administration and preparation of project related documentation , along with day to day interface with client and upper management and co-ordination of project commissioning personnel to carry out activities with vendor representatives , followed by the verification of all commissioning results and the overall acceptance on behalf of the client of the Compressor station installation including instrumentation and lv electrical / UPS.
  • Compressor Station Korpedje - COMMISSIONING MANAGER

    2004 - 2005 Duties include
    The administration and preparation of project related documentation , along with day to day interface with client and upper management and co-ordination of project commissioning personnel to carry out activities with vendor representatives , followed by the verification of all commissioning results and the overall acceptance on behalf of the client of the Compressor station installation including instrumentation and lv electrical / UPS.
  • Compressor Station Korpedje - COMMISSIONING MANAGER

    2004 - 2005 Duties include
    The administration and preparation of project related documentation , along with day to day interface with client and upper management and co-ordination of project commissioning personnel to carry out activities with vendor representatives , followed by the verification of all commissioning results and the overall acceptance on behalf of the client of the Compressor station installation including instrumentation and lv electrical / UPS.
  • Compressor Station Korpedje - COMMISSIONING MANAGER

    2004 - 2005 Duties include
    The administration and preparation of project related documentation , along with day to day interface with client and upper management and co-ordination of project commissioning personnel to carry out activities with vendor representatives , followed by the verification of all commissioning results and the overall acceptance on behalf of the client of the Compressor station installation including instrumentation and lv electrical / UPS.
  • Sonatrach Refinery Arsew - PROJECT COMMISSIONING MANAGER

    2004 - 2004 Duties include
    The overall supervision of the installation/commissioning of a Sentinel C Control Panel and 22MW Generator in the Refinery . The organisation and control of the installation and commissioning activities of the Sub-Contractor and the main contractor , constantly reviewing the HSE procedures. Generation of Technical Documentation .Daily liaison with the client in order to ensure customer satisfaction throughout. Daily progressing of the project taking into consideration all difficulties /concerns.
  • Sonatrach Refinery Arsew - PROJECT COMMISSIONING MANAGER

    2004 - 2004 Duties include
    The overall supervision of the installation/commissioning of a Sentinel C Control Panel and 22MW Generator in the Refinery . The organisation and control of the installation and commissioning activities of the Sub-Contractor and the main contractor , constantly reviewing the HSE procedures. Generation of Technical Documentation .Daily liaison with the client in order to ensure customer satisfaction throughout. Daily progressing of the project taking into consideration all difficulties /concerns.
  • Sonatrach Refinery Arsew - PROJECT COMMISSIONING MANAGER

    2004 - 2004 Duties include
    The overall supervision of the installation/commissioning of a Sentinel C Control Panel and 22MW Generator in the Refinery . The organisation and control of the installation and commissioning activities of the Sub-Contractor and the main contractor , constantly reviewing the HSE procedures. Generation of Technical Documentation .Daily liaison with the client in order to ensure customer satisfaction throughout. Daily progressing of the project taking into consideration all difficulties /concerns.
  • Sonatrach Refinery Arsew - PROJECT COMMISSIONING MANAGER

    2004 - 2004 Duties include
    The overall supervision of the installation/commissioning of a Sentinel C Control Panel and 22MW Generator in the Refinery . The organisation and control of the installation and commissioning activities of the Sub-Contractor and the main contractor , constantly reviewing the HSE procedures. Generation of Technical Documentation .Daily liaison with the client in order to ensure customer satisfaction throughout. Daily progressing of the project taking into consideration all difficulties /concerns.
  • Sonatrach Refinery Arsew - PROJECT COMMISSIONING MANAGER

    2004 - 2004 Duties include
    The overall supervision of the installation/commissioning of a Sentinel C Control Panel and 22MW Generator in the Refinery . The organisation and control of the installation and commissioning activities of the Sub-Contractor and the main contractor , constantly reviewing the HSE procedures. Generation of Technical Documentation .Daily liaison with the client in order to ensure customer satisfaction throughout. Daily progressing of the project taking into consideration all difficulties /concerns.
  • Sonatrach Refinery Arsew - PROJECT COMMISSIONING MANAGER

    2004 - 2004 Duties include
    The overall supervision of the installation/commissioning of a Sentinel C Control Panel and 22MW Generator in the Refinery . The organisation and control of the installation and commissioning activities of the Sub-Contractor and the main contractor , constantly reviewing the HSE procedures. Generation of Technical Documentation .Daily liaison with the client in order to ensure customer satisfaction throughout. Daily progressing of the project taking into consideration all difficulties /concerns.
  • Sonatrach Refinery Arsew - PROJECT COMMISSIONING MANAGER

    2004 - 2004 Duties include
    The overall supervision of the installation/commissioning of a Sentinel C Control Panel and 22MW Generator in the Refinery . The organisation and control of the installation and commissioning activities of the Sub-Contractor and the main contractor , constantly reviewing the HSE procedures. Generation of Technical Documentation .Daily liaison with the client in order to ensure customer satisfaction throughout. Daily progressing of the project taking into consideration all difficulties /concerns.
  • Sonatrach Refinery Arsew - PROJECT COMMISSIONING MANAGER

    2004 - 2004 Duties include
    The overall supervision of the installation/commissioning of a Sentinel C Control Panel and 22MW Generator in the Refinery . The organisation and control of the installation and commissioning activities of the Sub-Contractor and the main contractor , constantly reviewing the HSE procedures. Generation of Technical Documentation .Daily liaison with the client in order to ensure customer satisfaction throughout. Daily progressing of the project taking into consideration all difficulties /concerns.
  • Sonatrach Refinery Arsew - PROJECT COMMISSIONING MANAGER

    2004 - 2004 Duties include
    The overall supervision of the installation/commissioning of a Sentinel C Control Panel and 22MW Generator in the Refinery . The organisation and control of the installation and commissioning activities of the Sub-Contractor and the main contractor , constantly reviewing the HSE procedures. Generation of Technical Documentation .Daily liaison with the client in order to ensure customer satisfaction throughout. Daily progressing of the project taking into consideration all difficulties /concerns.
  • Sonatrach Refinery Arsew - PROJECT COMMISSIONING MANAGER

    2004 - 2004 Duties include
    The overall supervision of the installation/commissioning of a Sentinel C Control Panel and 22MW Generator in the Refinery . The organisation and control of the installation and commissioning activities of the Sub-Contractor and the main contractor , constantly reviewing the HSE procedures. Generation of Technical Documentation .Daily liaison with the client in order to ensure customer satisfaction throughout. Daily progressing of the project taking into consideration all difficulties /concerns.
  • Dibis Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The test /pre-commissioning and start up of GANZ Turbine / Generator including verification of the AVR / Excitation System including technical author for the associated documentation.
  • Dibis Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The test /pre-commissioning and start up of GANZ Turbine / Generator including verification of the AVR / Excitation System including technical author for the associated documentation.
  • Dibis Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The test /pre-commissioning and start up of GANZ Turbine / Generator including verification of the AVR / Excitation System including technical author for the associated documentation.
  • Dibis Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The test /pre-commissioning and start up of GANZ Turbine / Generator including verification of the AVR / Excitation System including technical author for the associated documentation.
  • Dibis Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The test /pre-commissioning and start up of GANZ Turbine / Generator including verification of the AVR / Excitation System including technical author for the associated documentation.
  • Dibis Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The test /pre-commissioning and start up of GANZ Turbine / Generator including verification of the AVR / Excitation System including technical author for the associated documentation.
  • Dibis Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The test /pre-commissioning and start up of GANZ Turbine / Generator including verification of the AVR / Excitation System including technical author for the associated documentation.
  • Dibis Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The test /pre-commissioning and start up of GANZ Turbine / Generator including verification of the AVR / Excitation System including technical author for the associated documentation.
  • Dibis Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The test /pre-commissioning and start up of GANZ Turbine / Generator including verification of the AVR / Excitation System including technical author for the associated documentation.
  • Dibis Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The test /pre-commissioning and start up of GANZ Turbine / Generator including verification of the AVR / Excitation System including technical author for the associated documentation.
  • Mosul Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The inspection / test / pre -commissioning /commissioning / start up of all instrumentation /MK1 Panels and protection relating to Hitachi Turbine / Brush Generators and control systems .
    Company withdrew from the project after one month due to Security issues.
  • Mosul Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The inspection / test / pre -commissioning /commissioning / start up of all instrumentation /MK1 Panels and protection relating to Hitachi Turbine / Brush Generators and control systems .
    Company withdrew from the project after one month due to Security issues.
  • Mosul Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The inspection / test / pre -commissioning /commissioning / start up of all instrumentation /MK1 Panels and protection relating to Hitachi Turbine / Brush Generators and control systems .
    Company withdrew from the project after one month due to Security issues.
  • Mosul Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The inspection / test / pre -commissioning /commissioning / start up of all instrumentation /MK1 Panels and protection relating to Hitachi Turbine / Brush Generators and control systems .
    Company withdrew from the project after one month due to Security issues.
  • Mosul Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The inspection / test / pre -commissioning /commissioning / start up of all instrumentation /MK1 Panels and protection relating to Hitachi Turbine / Brush Generators and control systems .
    Company withdrew from the project after one month due to Security issues.
  • Mosul Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The inspection / test / pre -commissioning /commissioning / start up of all instrumentation /MK1 Panels and protection relating to Hitachi Turbine / Brush Generators and control systems .
    Company withdrew from the project after one month due to Security issues.
  • Mosul Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The inspection / test / pre -commissioning /commissioning / start up of all instrumentation /MK1 Panels and protection relating to Hitachi Turbine / Brush Generators and control systems .
    Company withdrew from the project after one month due to Security issues.
  • Mosul Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The inspection / test / pre -commissioning /commissioning / start up of all instrumentation /MK1 Panels and protection relating to Hitachi Turbine / Brush Generators and control systems .
    Company withdrew from the project after one month due to Security issues.
  • Mosul Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The inspection / test / pre -commissioning /commissioning / start up of all instrumentation /MK1 Panels and protection relating to Hitachi Turbine / Brush Generators and control systems .
    Company withdrew from the project after one month due to Security issues.
  • Mosul Power Station - CONSULTANT C & COMMISSIONING ENGINEER

    2004 - 2004 Duties included
    The inspection / test / pre -commissioning /commissioning / start up of all instrumentation /MK1 Panels and protection relating to Hitachi Turbine / Brush Generators and control systems .
    Company withdrew from the project after one month due to Security issues.
  • KBR - CONSULTANT C & COMMISSIONING ENGINEER

    2003 - 2004 GMMR Project LYBIA

    +I COMMISSIONING ENGINEER / TECHNICAL AUTHOR
    Duties include
    Responsibility for all C+I /PLC/SCADA commissioning activities - representing the client GMMRA (Great Man Made River Authority) during all Test Pre-Commissioning and Commissioning and sub-system tests of all instrumentation / PLC and SCADA equipment RTU/DCU/UPS/PABX etc from Siemens S7/SINAUT ST7 station control system, Telemecanique TSX, Merlin Gerin and others in LCCs(Local Control Centres) MCCs (Motor Control Centres) Substations etc. throughout the GMMR Project from Tripoli in the North to NEJH (North East Jabal Hassouna)/ EJH (East Jabal Hassouna) in the South.Generation of Technical Documentation as Technical Author.
  • KBR - CONSULTANT C & COMMISSIONING ENGINEER

    2003 - 2004 GMMR Project LYBIA

    +I COMMISSIONING ENGINEER / TECHNICAL AUTHOR
    Duties include
    Responsibility for all C+I /PLC/SCADA commissioning activities - representing the client GMMRA (Great Man Made River Authority) during all Test Pre-Commissioning and Commissioning and sub-system tests of all instrumentation / PLC and SCADA equipment RTU/DCU/UPS/PABX etc from Siemens S7/SINAUT ST7 station control system, Telemecanique TSX, Merlin Gerin and others in LCCs(Local Control Centres) MCCs (Motor Control Centres) Substations etc. throughout the GMMR Project from Tripoli in the North to NEJH (North East Jabal Hassouna)/ EJH (East Jabal Hassouna) in the South.Generation of Technical Documentation as Technical Author.
  • KBR - CONSULTANT C & COMMISSIONING ENGINEER

    2003 - 2004 GMMR Project LYBIA

    +I COMMISSIONING ENGINEER / TECHNICAL AUTHOR
    Duties include
    Responsibility for all C+I /PLC/SCADA commissioning activities - representing the client GMMRA (Great Man Made River Authority) during all Test Pre-Commissioning and Commissioning and sub-system tests of all instrumentation / PLC and SCADA equipment RTU/DCU/UPS/PABX etc from Siemens S7/SINAUT ST7 station control system, Telemecanique TSX, Merlin Gerin and others in LCCs(Local Control Centres) MCCs (Motor Control Centres) Substations etc. throughout the GMMR Project from Tripoli in the North to NEJH (North East Jabal Hassouna)/ EJH (East Jabal Hassouna) in the South.Generation of Technical Documentation as Technical Author.
  • KBR - CONSULTANT C & COMMISSIONING ENGINEER

    2003 - 2004 GMMR Project LYBIA

    +I COMMISSIONING ENGINEER / TECHNICAL AUTHOR
    Duties include
    Responsibility for all C+I /PLC/SCADA commissioning activities - representing the client GMMRA (Great Man Made River Authority) during all Test Pre-Commissioning and Commissioning and sub-system tests of all instrumentation / PLC and SCADA equipment RTU/DCU/UPS/PABX etc from Siemens S7/SINAUT ST7 station control system, Telemecanique TSX, Merlin Gerin and others in LCCs(Local Control Centres) MCCs (Motor Control Centres) Substations etc. throughout the GMMR Project from Tripoli in the North to NEJH (North East Jabal Hassouna)/ EJH (East Jabal Hassouna) in the South.Generation of Technical Documentation as Technical Author.
  • KBR - CONSULTANT C & COMMISSIONING ENGINEER

    2003 - 2004 GMMR Project LYBIA

    +I COMMISSIONING ENGINEER / TECHNICAL AUTHOR
    Duties include
    Responsibility for all C+I /PLC/SCADA commissioning activities - representing the client GMMRA (Great Man Made River Authority) during all Test Pre-Commissioning and Commissioning and sub-system tests of all instrumentation / PLC and SCADA equipment RTU/DCU/UPS/PABX etc from Siemens S7/SINAUT ST7 station control system, Telemecanique TSX, Merlin Gerin and others in LCCs(Local Control Centres) MCCs (Motor Control Centres) Substations etc. throughout the GMMR Project from Tripoli in the North to NEJH (North East Jabal Hassouna)/ EJH (East Jabal Hassouna) in the South.Generation of Technical Documentation as Technical Author.
  • KBR - CONSULTANT C & COMMISSIONING ENGINEER

    2003 - 2004 GMMR Project LYBIA

    +I COMMISSIONING ENGINEER / TECHNICAL AUTHOR
    Duties include
    Responsibility for all C+I /PLC/SCADA commissioning activities - representing the client GMMRA (Great Man Made River Authority) during all Test Pre-Commissioning and Commissioning and sub-system tests of all instrumentation / PLC and SCADA equipment RTU/DCU/UPS/PABX etc from Siemens S7/SINAUT ST7 station control system, Telemecanique TSX, Merlin Gerin and others in LCCs(Local Control Centres) MCCs (Motor Control Centres) Substations etc. throughout the GMMR Project from Tripoli in the North to NEJH (North East Jabal Hassouna)/ EJH (East Jabal Hassouna) in the South.Generation of Technical Documentation as Technical Author.
  • KBR - CONSULTANT C & COMMISSIONING ENGINEER

    2003 - 2004 GMMR Project LYBIA

    +I COMMISSIONING ENGINEER / TECHNICAL AUTHOR
    Duties include
    Responsibility for all C+I /PLC/SCADA commissioning activities - representing the client GMMRA (Great Man Made River Authority) during all Test Pre-Commissioning and Commissioning and sub-system tests of all instrumentation / PLC and SCADA equipment RTU/DCU/UPS/PABX etc from Siemens S7/SINAUT ST7 station control system, Telemecanique TSX, Merlin Gerin and others in LCCs(Local Control Centres) MCCs (Motor Control Centres) Substations etc. throughout the GMMR Project from Tripoli in the North to NEJH (North East Jabal Hassouna)/ EJH (East Jabal Hassouna) in the South.Generation of Technical Documentation as Technical Author.
  • KBR - CONSULTANT C & COMMISSIONING ENGINEER

    2003 - 2004 GMMR Project LYBIA

    +I COMMISSIONING ENGINEER / TECHNICAL AUTHOR
    Duties include
    Responsibility for all C+I /PLC/SCADA commissioning activities - representing the client GMMRA (Great Man Made River Authority) during all Test Pre-Commissioning and Commissioning and sub-system tests of all instrumentation / PLC and SCADA equipment RTU/DCU/UPS/PABX etc from Siemens S7/SINAUT ST7 station control system, Telemecanique TSX, Merlin Gerin and others in LCCs(Local Control Centres) MCCs (Motor Control Centres) Substations etc. throughout the GMMR Project from Tripoli in the North to NEJH (North East Jabal Hassouna)/ EJH (East Jabal Hassouna) in the South.Generation of Technical Documentation as Technical Author.
  • KBR - CONSULTANT C & COMMISSIONING ENGINEER

    2003 - 2004 GMMR Project LYBIA

    +I COMMISSIONING ENGINEER / TECHNICAL AUTHOR
    Duties include
    Responsibility for all C+I /PLC/SCADA commissioning activities - representing the client GMMRA (Great Man Made River Authority) during all Test Pre-Commissioning and Commissioning and sub-system tests of all instrumentation / PLC and SCADA equipment RTU/DCU/UPS/PABX etc from Siemens S7/SINAUT ST7 station control system, Telemecanique TSX, Merlin Gerin and others in LCCs(Local Control Centres) MCCs (Motor Control Centres) Substations etc. throughout the GMMR Project from Tripoli in the North to NEJH (North East Jabal Hassouna)/ EJH (East Jabal Hassouna) in the South.Generation of Technical Documentation as Technical Author.
  • KBR - CONSULTANT C & COMMISSIONING ENGINEER

    2003 - 2004 GMMR Project LYBIA

    +I COMMISSIONING ENGINEER / TECHNICAL AUTHOR
    Duties include
    Responsibility for all C+I /PLC/SCADA commissioning activities - representing the client GMMRA (Great Man Made River Authority) during all Test Pre-Commissioning and Commissioning and sub-system tests of all instrumentation / PLC and SCADA equipment RTU/DCU/UPS/PABX etc from Siemens S7/SINAUT ST7 station control system, Telemecanique TSX, Merlin Gerin and others in LCCs(Local Control Centres) MCCs (Motor Control Centres) Substations etc. throughout the GMMR Project from Tripoli in the North to NEJH (North East Jabal Hassouna)/ EJH (East Jabal Hassouna) in the South.Generation of Technical Documentation as Technical Author.
  • GREATER NILE PETROLEUM OPERATING - COMMISSIONING ENGINEER

    2002 - 2003 SUDAN

    COMMISSIONING ENGINEER

    Duties included
    Pre-commissioning / commissioning of all Electrical Distribution (MCC) for Rolls Royce and upgrade of instrumentation associated with a pump station on the pipeline comprising of 2 Rolls Royce Bergen Engines / 2 Weir Pumps and associated DCS/ PLC and Siemens safety PLC for the SCS along with Bentley Nevada for vibration ,followed up by logic checks /72 hour reliability run and subsequent handover to the client (GNPOC).
  • GREATER NILE PETROLEUM OPERATING - COMMISSIONING ENGINEER

    2002 - 2003 SUDAN

    COMMISSIONING ENGINEER

    Duties included
    Pre-commissioning / commissioning of all Electrical Distribution (MCC) for Rolls Royce and upgrade of instrumentation associated with a pump station on the pipeline comprising of 2 Rolls Royce Bergen Engines / 2 Weir Pumps and associated DCS/ PLC and Siemens safety PLC for the SCS along with Bentley Nevada for vibration ,followed up by logic checks /72 hour reliability run and subsequent handover to the client (GNPOC).
  • GREATER NILE PETROLEUM OPERATING - COMMISSIONING ENGINEER

    2002 - 2003 SUDAN

    COMMISSIONING ENGINEER

    Duties included
    Pre-commissioning / commissioning of all Electrical Distribution (MCC) for Rolls Royce and upgrade of instrumentation associated with a pump station on the pipeline comprising of 2 Rolls Royce Bergen Engines / 2 Weir Pumps and associated DCS/ PLC and Siemens safety PLC for the SCS along with Bentley Nevada for vibration ,followed up by logic checks /72 hour reliability run and subsequent handover to the client (GNPOC).
  • GREATER NILE PETROLEUM OPERATING - COMMISSIONING ENGINEER

    2002 - 2003 SUDAN

    COMMISSIONING ENGINEER

    Duties included
    Pre-commissioning / commissioning of all Electrical Distribution (MCC) for Rolls Royce and upgrade of instrumentation associated with a pump station on the pipeline comprising of 2 Rolls Royce Bergen Engines / 2 Weir Pumps and associated DCS/ PLC and Siemens safety PLC for the SCS along with Bentley Nevada for vibration ,followed up by logic checks /72 hour reliability run and subsequent handover to the client (GNPOC).
  • GREATER NILE PETROLEUM OPERATING - COMMISSIONING ENGINEER

    2002 - 2003 SUDAN

    COMMISSIONING ENGINEER

    Duties included
    Pre-commissioning / commissioning of all Electrical Distribution (MCC) for Rolls Royce and upgrade of instrumentation associated with a pump station on the pipeline comprising of 2 Rolls Royce Bergen Engines / 2 Weir Pumps and associated DCS/ PLC and Siemens safety PLC for the SCS along with Bentley Nevada for vibration ,followed up by logic checks /72 hour reliability run and subsequent handover to the client (GNPOC).
  • GREATER NILE PETROLEUM OPERATING - COMMISSIONING ENGINEER

    2002 - 2003 SUDAN

    COMMISSIONING ENGINEER

    Duties included
    Pre-commissioning / commissioning of all Electrical Distribution (MCC) for Rolls Royce and upgrade of instrumentation associated with a pump station on the pipeline comprising of 2 Rolls Royce Bergen Engines / 2 Weir Pumps and associated DCS/ PLC and Siemens safety PLC for the SCS along with Bentley Nevada for vibration ,followed up by logic checks /72 hour reliability run and subsequent handover to the client (GNPOC).
  • GREATER NILE PETROLEUM OPERATING - COMMISSIONING ENGINEER

    2002 - 2003 SUDAN

    COMMISSIONING ENGINEER

    Duties included
    Pre-commissioning / commissioning of all Electrical Distribution (MCC) for Rolls Royce and upgrade of instrumentation associated with a pump station on the pipeline comprising of 2 Rolls Royce Bergen Engines / 2 Weir Pumps and associated DCS/ PLC and Siemens safety PLC for the SCS along with Bentley Nevada for vibration ,followed up by logic checks /72 hour reliability run and subsequent handover to the client (GNPOC).
  • GREATER NILE PETROLEUM OPERATING - COMMISSIONING ENGINEER

    2002 - 2003 SUDAN

    COMMISSIONING ENGINEER

    Duties included
    Pre-commissioning / commissioning of all Electrical Distribution (MCC) for Rolls Royce and upgrade of instrumentation associated with a pump station on the pipeline comprising of 2 Rolls Royce Bergen Engines / 2 Weir Pumps and associated DCS/ PLC and Siemens safety PLC for the SCS along with Bentley Nevada for vibration ,followed up by logic checks /72 hour reliability run and subsequent handover to the client (GNPOC).
  • GREATER NILE PETROLEUM OPERATING - COMMISSIONING ENGINEER

    2002 - 2003 SUDAN

    COMMISSIONING ENGINEER

    Duties included
    Pre-commissioning / commissioning of all Electrical Distribution (MCC) for Rolls Royce and upgrade of instrumentation associated with a pump station on the pipeline comprising of 2 Rolls Royce Bergen Engines / 2 Weir Pumps and associated DCS/ PLC and Siemens safety PLC for the SCS along with Bentley Nevada for vibration ,followed up by logic checks /72 hour reliability run and subsequent handover to the client (GNPOC).
  • GREATER NILE PETROLEUM OPERATING - COMMISSIONING ENGINEER

    2002 - 2003 SUDAN

    COMMISSIONING ENGINEER

    Duties included
    Pre-commissioning / commissioning of all Electrical Distribution (MCC) for Rolls Royce and upgrade of instrumentation associated with a pump station on the pipeline comprising of 2 Rolls Royce Bergen Engines / 2 Weir Pumps and associated DCS/ PLC and Siemens safety PLC for the SCS along with Bentley Nevada for vibration ,followed up by logic checks /72 hour reliability run and subsequent handover to the client (GNPOC).
  • BEAR CREEK CCPP - COMMISSIONING ENGINEER

    2002 - maintenant Duties included
    Pre- commissioning /commissioning of plc/dcs Siemens system and verification of all control logic using Win CC as a base for the system communicating on an ethernet network.On behalf of DS and S (a subsidiary of Rolls Royce gas turbines) .The test/ fault find of all control and instrumentation elements included in the auxiliaries and main control systems for a Rolls Royce Trent Gas Turbine coupled to a Brush Generator including a dual GE 489 Management Relay for overcurrent/overvoltage/frequency etc etc related monitoring and trip functions.
  • SUEZ POWER PLANT - COMMISSIONING ENGINEER COORDINATOR

    PARIS LA DEFENSE 2002 - 2002 Duties included
    Commissioning coordination of all activities from the initial construction through to mechanical completion / pre-commissioning (loop checks) / logic verification of Alspa DCS system followed by the tuning and start up of 2 units (Foster Wheeler 495 MW Multi Fuel Boilers) including all level control instrumentation.

    Daily interface between Foster Wheeler / EEOC (End User)/ EDF /3 EC and sub contractors in order to achieve target dates for start up.Verification/ acceptance of all tests/commissioning activities on behalf of the client EEOC.
  • SUEZ POWER PLANT - COMMISSIONING ENGINEER COORDINATOR

    PARIS LA DEFENSE 2002 - 2002 Duties included
    Commissioning coordination of all activities from the initial construction through to mechanical completion / pre-commissioning (loop checks) / logic verification of Alspa DCS system followed by the tuning and start up of 2 units (Foster Wheeler 495 MW Multi Fuel Boilers) including all level control instrumentation.

    Daily interface between Foster Wheeler / EEOC (End User)/ EDF /3 EC and sub contractors in order to achieve target dates for start up.Verification/ acceptance of all tests/commissioning activities on behalf of the client EEOC.
  • SUEZ POWER PLANT - COMMISSIONING ENGINEER COORDINATOR

    PARIS LA DEFENSE 2002 - 2002 Duties included
    Commissioning coordination of all activities from the initial construction through to mechanical completion / pre-commissioning (loop checks) / logic verification of Alspa DCS system followed by the tuning and start up of 2 units (Foster Wheeler 495 MW Multi Fuel Boilers) including all level control instrumentation.

    Daily interface between Foster Wheeler / EEOC (End User)/ EDF /3 EC and sub contractors in order to achieve target dates for start up.Verification/ acceptance of all tests/commissioning activities on behalf of the client EEOC.
  • SUEZ POWER PLANT - COMMISSIONING ENGINEER COORDINATOR

    PARIS LA DEFENSE 2002 - 2002 Duties included
    Commissioning coordination of all activities from the initial construction through to mechanical completion / pre-commissioning (loop checks) / logic verification of Alspa DCS system followed by the tuning and start up of 2 units (Foster Wheeler 495 MW Multi Fuel Boilers) including all level control instrumentation.

    Daily interface between Foster Wheeler / EEOC (End User)/ EDF /3 EC and sub contractors in order to achieve target dates for start up.Verification/ acceptance of all tests/commissioning activities on behalf of the client EEOC.
  • SUEZ POWER PLANT - COMMISSIONING ENGINEER COORDINATOR

    PARIS LA DEFENSE 2002 - 2002 Duties included
    Commissioning coordination of all activities from the initial construction through to mechanical completion / pre-commissioning (loop checks) / logic verification of Alspa DCS system followed by the tuning and start up of 2 units (Foster Wheeler 495 MW Multi Fuel Boilers) including all level control instrumentation.

    Daily interface between Foster Wheeler / EEOC (End User)/ EDF /3 EC and sub contractors in order to achieve target dates for start up.Verification/ acceptance of all tests/commissioning activities on behalf of the client EEOC.
  • SUEZ POWER PLANT - COMMISSIONING ENGINEER COORDINATOR

    PARIS LA DEFENSE 2002 - 2002 Duties included
    Commissioning coordination of all activities from the initial construction through to mechanical completion / pre-commissioning (loop checks) / logic verification of Alspa DCS system followed by the tuning and start up of 2 units (Foster Wheeler 495 MW Multi Fuel Boilers) including all level control instrumentation.

    Daily interface between Foster Wheeler / EEOC (End User)/ EDF /3 EC and sub contractors in order to achieve target dates for start up.Verification/ acceptance of all tests/commissioning activities on behalf of the client EEOC.
  • SUEZ POWER PLANT - COMMISSIONING ENGINEER COORDINATOR

    PARIS LA DEFENSE 2002 - 2002 Duties included
    Commissioning coordination of all activities from the initial construction through to mechanical completion / pre-commissioning (loop checks) / logic verification of Alspa DCS system followed by the tuning and start up of 2 units (Foster Wheeler 495 MW Multi Fuel Boilers) including all level control instrumentation.

    Daily interface between Foster Wheeler / EEOC (End User)/ EDF /3 EC and sub contractors in order to achieve target dates for start up.Verification/ acceptance of all tests/commissioning activities on behalf of the client EEOC.
  • SUEZ POWER PLANT - COMMISSIONING ENGINEER COORDINATOR

    PARIS LA DEFENSE 2002 - 2002 Duties included
    Commissioning coordination of all activities from the initial construction through to mechanical completion / pre-commissioning (loop checks) / logic verification of Alspa DCS system followed by the tuning and start up of 2 units (Foster Wheeler 495 MW Multi Fuel Boilers) including all level control instrumentation.

    Daily interface between Foster Wheeler / EEOC (End User)/ EDF /3 EC and sub contractors in order to achieve target dates for start up.Verification/ acceptance of all tests/commissioning activities on behalf of the client EEOC.
  • SUEZ POWER PLANT - COMMISSIONING ENGINEER COORDINATOR

    PARIS LA DEFENSE 2002 - 2002 Duties included
    Commissioning coordination of all activities from the initial construction through to mechanical completion / pre-commissioning (loop checks) / logic verification of Alspa DCS system followed by the tuning and start up of 2 units (Foster Wheeler 495 MW Multi Fuel Boilers) including all level control instrumentation.

    Daily interface between Foster Wheeler / EEOC (End User)/ EDF /3 EC and sub contractors in order to achieve target dates for start up.Verification/ acceptance of all tests/commissioning activities on behalf of the client EEOC.
  • SUEZ POWER PLANT - COMMISSIONING ENGINEER COORDINATOR

    PARIS LA DEFENSE 2002 - 2002 Duties included
    Commissioning coordination of all activities from the initial construction through to mechanical completion / pre-commissioning (loop checks) / logic verification of Alspa DCS system followed by the tuning and start up of 2 units (Foster Wheeler 495 MW Multi Fuel Boilers) including all level control instrumentation.

    Daily interface between Foster Wheeler / EEOC (End User)/ EDF /3 EC and sub contractors in order to achieve target dates for start up.Verification/ acceptance of all tests/commissioning activities on behalf of the client EEOC.
  • KELANITISSA POWER PLANT COLOMBO - CONSULTANT C

    2001 - 2002 Duties include

    Responsibilities for the day to day addressing of problems relating to the construction/pre-commissioning and commissioning of the power plant including all auxiliaries demineralization / CCPP including gas turbine GE steam turbine and two associated generators (Alstom) along with an HRSG all control based on a FOXBORO DCS.

    Advising the client as to the action to be taken in order that all works are carried out correctly.

    Holding meetings at all levels Contractor - Alstom Marubeni GE through to the ministry of energy representing CEB (Ceylon Electricity Board) in order to resolve all technical issues related to the project. Successful completion of the Simple Cycle Phase achieved.
    Combined Cycle Phase to be continued when the mechanical assembly of the HRSG and associated auxiliaries are completed.
  • KELANITISSA POWER PLANT COLOMBO - CONSULTANT C

    2001 - 2002 Duties include

    Responsibilities for the day to day addressing of problems relating to the construction/pre-commissioning and commissioning of the power plant including all auxiliaries demineralization / CCPP including gas turbine GE steam turbine and two associated generators (Alstom) along with an HRSG all control based on a FOXBORO DCS.

    Advising the client as to the action to be taken in order that all works are carried out correctly.

    Holding meetings at all levels Contractor - Alstom Marubeni GE through to the ministry of energy representing CEB (Ceylon Electricity Board) in order to resolve all technical issues related to the project. Successful completion of the Simple Cycle Phase achieved.
    Combined Cycle Phase to be continued when the mechanical assembly of the HRSG and associated auxiliaries are completed.
  • KELANITISSA POWER PLANT COLOMBO - CONSULTANT C

    2001 - 2002 Duties include

    Responsibilities for the day to day addressing of problems relating to the construction/pre-commissioning and commissioning of the power plant including all auxiliaries demineralization / CCPP including gas turbine GE steam turbine and two associated generators (Alstom) along with an HRSG all control based on a FOXBORO DCS.

    Advising the client as to the action to be taken in order that all works are carried out correctly.

    Holding meetings at all levels Contractor - Alstom Marubeni GE through to the ministry of energy representing CEB (Ceylon Electricity Board) in order to resolve all technical issues related to the project. Successful completion of the Simple Cycle Phase achieved.
    Combined Cycle Phase to be continued when the mechanical assembly of the HRSG and associated auxiliaries are completed.
  • KELANITISSA POWER PLANT COLOMBO - CONSULTANT C

    2001 - 2002 Duties include

    Responsibilities for the day to day addressing of problems relating to the construction/pre-commissioning and commissioning of the power plant including all auxiliaries demineralization / CCPP including gas turbine GE steam turbine and two associated generators (Alstom) along with an HRSG all control based on a FOXBORO DCS.

    Advising the client as to the action to be taken in order that all works are carried out correctly.

    Holding meetings at all levels Contractor - Alstom Marubeni GE through to the ministry of energy representing CEB (Ceylon Electricity Board) in order to resolve all technical issues related to the project. Successful completion of the Simple Cycle Phase achieved.
    Combined Cycle Phase to be continued when the mechanical assembly of the HRSG and associated auxiliaries are completed.
  • KELANITISSA POWER PLANT COLOMBO - CONSULTANT C

    2001 - 2002 Duties include

    Responsibilities for the day to day addressing of problems relating to the construction/pre-commissioning and commissioning of the power plant including all auxiliaries demineralization / CCPP including gas turbine GE steam turbine and two associated generators (Alstom) along with an HRSG all control based on a FOXBORO DCS.

    Advising the client as to the action to be taken in order that all works are carried out correctly.

    Holding meetings at all levels Contractor - Alstom Marubeni GE through to the ministry of energy representing CEB (Ceylon Electricity Board) in order to resolve all technical issues related to the project. Successful completion of the Simple Cycle Phase achieved.
    Combined Cycle Phase to be continued when the mechanical assembly of the HRSG and associated auxiliaries are completed.
  • KELANITISSA POWER PLANT COLOMBO - CONSULTANT C

    2001 - 2002 Duties include

    Responsibilities for the day to day addressing of problems relating to the construction/pre-commissioning and commissioning of the power plant including all auxiliaries demineralization / CCPP including gas turbine GE steam turbine and two associated generators (Alstom) along with an HRSG all control based on a FOXBORO DCS.

    Advising the client as to the action to be taken in order that all works are carried out correctly.

    Holding meetings at all levels Contractor - Alstom Marubeni GE through to the ministry of energy representing CEB (Ceylon Electricity Board) in order to resolve all technical issues related to the project. Successful completion of the Simple Cycle Phase achieved.
    Combined Cycle Phase to be continued when the mechanical assembly of the HRSG and associated auxiliaries are completed.
  • KELANITISSA POWER PLANT COLOMBO - CONSULTANT C

    2001 - 2002 Duties include

    Responsibilities for the day to day addressing of problems relating to the construction/pre-commissioning and commissioning of the power plant including all auxiliaries demineralization / CCPP including gas turbine GE steam turbine and two associated generators (Alstom) along with an HRSG all control based on a FOXBORO DCS.

    Advising the client as to the action to be taken in order that all works are carried out correctly.

    Holding meetings at all levels Contractor - Alstom Marubeni GE through to the ministry of energy representing CEB (Ceylon Electricity Board) in order to resolve all technical issues related to the project. Successful completion of the Simple Cycle Phase achieved.
    Combined Cycle Phase to be continued when the mechanical assembly of the HRSG and associated auxiliaries are completed.
  • KELANITISSA POWER PLANT COLOMBO - CONSULTANT C

    2001 - 2002 Duties include

    Responsibilities for the day to day addressing of problems relating to the construction/pre-commissioning and commissioning of the power plant including all auxiliaries demineralization / CCPP including gas turbine GE steam turbine and two associated generators (Alstom) along with an HRSG all control based on a FOXBORO DCS.

    Advising the client as to the action to be taken in order that all works are carried out correctly.

    Holding meetings at all levels Contractor - Alstom Marubeni GE through to the ministry of energy representing CEB (Ceylon Electricity Board) in order to resolve all technical issues related to the project. Successful completion of the Simple Cycle Phase achieved.
    Combined Cycle Phase to be continued when the mechanical assembly of the HRSG and associated auxiliaries are completed.
  • KELANITISSA POWER PLANT COLOMBO - CONSULTANT C

    2001 - 2002 Duties include

    Responsibilities for the day to day addressing of problems relating to the construction/pre-commissioning and commissioning of the power plant including all auxiliaries demineralization / CCPP including gas turbine GE steam turbine and two associated generators (Alstom) along with an HRSG all control based on a FOXBORO DCS.

    Advising the client as to the action to be taken in order that all works are carried out correctly.

    Holding meetings at all levels Contractor - Alstom Marubeni GE through to the ministry of energy representing CEB (Ceylon Electricity Board) in order to resolve all technical issues related to the project. Successful completion of the Simple Cycle Phase achieved.
    Combined Cycle Phase to be continued when the mechanical assembly of the HRSG and associated auxiliaries are completed.
  • KELANITISSA POWER PLANT COLOMBO - CONSULTANT C

    2001 - 2002 Duties include

    Responsibilities for the day to day addressing of problems relating to the construction/pre-commissioning and commissioning of the power plant including all auxiliaries demineralization / CCPP including gas turbine GE steam turbine and two associated generators (Alstom) along with an HRSG all control based on a FOXBORO DCS.

    Advising the client as to the action to be taken in order that all works are carried out correctly.

    Holding meetings at all levels Contractor - Alstom Marubeni GE through to the ministry of energy representing CEB (Ceylon Electricity Board) in order to resolve all technical issues related to the project. Successful completion of the Simple Cycle Phase achieved.
    Combined Cycle Phase to be continued when the mechanical assembly of the HRSG and associated auxiliaries are completed.
  • Waterflood Project HASSI MASSOUD - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    Responsibilities covered the programming/debugging and trouble-shooting of software/hardware problems and interfacing of the Siemens S7 400/300 with auxiliary systems including power distribution and all process control within the water reclamation project prior to start up.All control systems comms were commissioned between all systems these were using modbus/profibus networks.
    The generation of the database for the project ,solving of all comms problems related to the project (RS485/422),programming/debugging of the S7 Programs.The project included S7 400 and S7 300 PLCs as controllers for a DCS and OP37Pro HMI's.
  • Waterflood Project HASSI MASSOUD - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    Responsibilities covered the programming/debugging and trouble-shooting of software/hardware problems and interfacing of the Siemens S7 400/300 with auxiliary systems including power distribution and all process control within the water reclamation project prior to start up.All control systems comms were commissioned between all systems these were using modbus/profibus networks.
    The generation of the database for the project ,solving of all comms problems related to the project (RS485/422),programming/debugging of the S7 Programs.The project included S7 400 and S7 300 PLCs as controllers for a DCS and OP37Pro HMI's.
  • Waterflood Project HASSI MASSOUD - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    Responsibilities covered the programming/debugging and trouble-shooting of software/hardware problems and interfacing of the Siemens S7 400/300 with auxiliary systems including power distribution and all process control within the water reclamation project prior to start up.All control systems comms were commissioned between all systems these were using modbus/profibus networks.
    The generation of the database for the project ,solving of all comms problems related to the project (RS485/422),programming/debugging of the S7 Programs.The project included S7 400 and S7 300 PLCs as controllers for a DCS and OP37Pro HMI's.
  • Waterflood Project HASSI MASSOUD - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    Responsibilities covered the programming/debugging and trouble-shooting of software/hardware problems and interfacing of the Siemens S7 400/300 with auxiliary systems including power distribution and all process control within the water reclamation project prior to start up.All control systems comms were commissioned between all systems these were using modbus/profibus networks.
    The generation of the database for the project ,solving of all comms problems related to the project (RS485/422),programming/debugging of the S7 Programs.The project included S7 400 and S7 300 PLCs as controllers for a DCS and OP37Pro HMI's.
  • Waterflood Project HASSI MASSOUD - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    Responsibilities covered the programming/debugging and trouble-shooting of software/hardware problems and interfacing of the Siemens S7 400/300 with auxiliary systems including power distribution and all process control within the water reclamation project prior to start up.All control systems comms were commissioned between all systems these were using modbus/profibus networks.
    The generation of the database for the project ,solving of all comms problems related to the project (RS485/422),programming/debugging of the S7 Programs.The project included S7 400 and S7 300 PLCs as controllers for a DCS and OP37Pro HMI's.
  • Waterflood Project HASSI MASSOUD - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    Responsibilities covered the programming/debugging and trouble-shooting of software/hardware problems and interfacing of the Siemens S7 400/300 with auxiliary systems including power distribution and all process control within the water reclamation project prior to start up.All control systems comms were commissioned between all systems these were using modbus/profibus networks.
    The generation of the database for the project ,solving of all comms problems related to the project (RS485/422),programming/debugging of the S7 Programs.The project included S7 400 and S7 300 PLCs as controllers for a DCS and OP37Pro HMI's.
  • Waterflood Project HASSI MASSOUD - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    Responsibilities covered the programming/debugging and trouble-shooting of software/hardware problems and interfacing of the Siemens S7 400/300 with auxiliary systems including power distribution and all process control within the water reclamation project prior to start up.All control systems comms were commissioned between all systems these were using modbus/profibus networks.
    The generation of the database for the project ,solving of all comms problems related to the project (RS485/422),programming/debugging of the S7 Programs.The project included S7 400 and S7 300 PLCs as controllers for a DCS and OP37Pro HMI's.
  • Waterflood Project HASSI MASSOUD - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    Responsibilities covered the programming/debugging and trouble-shooting of software/hardware problems and interfacing of the Siemens S7 400/300 with auxiliary systems including power distribution and all process control within the water reclamation project prior to start up.All control systems comms were commissioned between all systems these were using modbus/profibus networks.
    The generation of the database for the project ,solving of all comms problems related to the project (RS485/422),programming/debugging of the S7 Programs.The project included S7 400 and S7 300 PLCs as controllers for a DCS and OP37Pro HMI's.
  • Waterflood Project HASSI MASSOUD - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    Responsibilities covered the programming/debugging and trouble-shooting of software/hardware problems and interfacing of the Siemens S7 400/300 with auxiliary systems including power distribution and all process control within the water reclamation project prior to start up.All control systems comms were commissioned between all systems these were using modbus/profibus networks.
    The generation of the database for the project ,solving of all comms problems related to the project (RS485/422),programming/debugging of the S7 Programs.The project included S7 400 and S7 300 PLCs as controllers for a DCS and OP37Pro HMI's.
  • Waterflood Project HASSI MASSOUD - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    Responsibilities covered the programming/debugging and trouble-shooting of software/hardware problems and interfacing of the Siemens S7 400/300 with auxiliary systems including power distribution and all process control within the water reclamation project prior to start up.All control systems comms were commissioned between all systems these were using modbus/profibus networks.
    The generation of the database for the project ,solving of all comms problems related to the project (RS485/422),programming/debugging of the S7 Programs.The project included S7 400 and S7 300 PLCs as controllers for a DCS and OP37Pro HMI's.
  • Mosul Power Station - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    The overhaul and renovation/repair of twelve turbine generators including the integration of an Alstom LGPG safety system,Siemens Simatics PLC ,and Bentley Nevada systems with Hitachi ,Alstom and Siemens Turbines / Alstom generators. Generators and Turbines were bomb damaged and repair work included replacement of rotors ,stators and associated instrumentation on the generator. Programming of the LGPG system ,verification/simulation of all trip levels - over current/under current /under voltage/over voltage/ stator and rotor earth fault protection and programming of safety logic, client witnessing / commissioning /start-up and handover of renovated systems.
  • Mosul Power Station - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    The overhaul and renovation/repair of twelve turbine generators including the integration of an Alstom LGPG safety system,Siemens Simatics PLC ,and Bentley Nevada systems with Hitachi ,Alstom and Siemens Turbines / Alstom generators. Generators and Turbines were bomb damaged and repair work included replacement of rotors ,stators and associated instrumentation on the generator. Programming of the LGPG system ,verification/simulation of all trip levels - over current/under current /under voltage/over voltage/ stator and rotor earth fault protection and programming of safety logic, client witnessing / commissioning /start-up and handover of renovated systems.
  • Mosul Power Station - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    The overhaul and renovation/repair of twelve turbine generators including the integration of an Alstom LGPG safety system,Siemens Simatics PLC ,and Bentley Nevada systems with Hitachi ,Alstom and Siemens Turbines / Alstom generators. Generators and Turbines were bomb damaged and repair work included replacement of rotors ,stators and associated instrumentation on the generator. Programming of the LGPG system ,verification/simulation of all trip levels - over current/under current /under voltage/over voltage/ stator and rotor earth fault protection and programming of safety logic, client witnessing / commissioning /start-up and handover of renovated systems.
  • Mosul Power Station - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    The overhaul and renovation/repair of twelve turbine generators including the integration of an Alstom LGPG safety system,Siemens Simatics PLC ,and Bentley Nevada systems with Hitachi ,Alstom and Siemens Turbines / Alstom generators. Generators and Turbines were bomb damaged and repair work included replacement of rotors ,stators and associated instrumentation on the generator. Programming of the LGPG system ,verification/simulation of all trip levels - over current/under current /under voltage/over voltage/ stator and rotor earth fault protection and programming of safety logic, client witnessing / commissioning /start-up and handover of renovated systems.
  • Mosul Power Station - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    The overhaul and renovation/repair of twelve turbine generators including the integration of an Alstom LGPG safety system,Siemens Simatics PLC ,and Bentley Nevada systems with Hitachi ,Alstom and Siemens Turbines / Alstom generators. Generators and Turbines were bomb damaged and repair work included replacement of rotors ,stators and associated instrumentation on the generator. Programming of the LGPG system ,verification/simulation of all trip levels - over current/under current /under voltage/over voltage/ stator and rotor earth fault protection and programming of safety logic, client witnessing / commissioning /start-up and handover of renovated systems.
  • Mosul Power Station - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    The overhaul and renovation/repair of twelve turbine generators including the integration of an Alstom LGPG safety system,Siemens Simatics PLC ,and Bentley Nevada systems with Hitachi ,Alstom and Siemens Turbines / Alstom generators. Generators and Turbines were bomb damaged and repair work included replacement of rotors ,stators and associated instrumentation on the generator. Programming of the LGPG system ,verification/simulation of all trip levels - over current/under current /under voltage/over voltage/ stator and rotor earth fault protection and programming of safety logic, client witnessing / commissioning /start-up and handover of renovated systems.
  • Mosul Power Station - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    The overhaul and renovation/repair of twelve turbine generators including the integration of an Alstom LGPG safety system,Siemens Simatics PLC ,and Bentley Nevada systems with Hitachi ,Alstom and Siemens Turbines / Alstom generators. Generators and Turbines were bomb damaged and repair work included replacement of rotors ,stators and associated instrumentation on the generator. Programming of the LGPG system ,verification/simulation of all trip levels - over current/under current /under voltage/over voltage/ stator and rotor earth fault protection and programming of safety logic, client witnessing / commissioning /start-up and handover of renovated systems.
  • Mosul Power Station - COMMISSIONING ENGINEER

    2000 - 2000 Duties included
    The overhaul and renovation/repair of twelve turbine generators including the integration of an Alstom LGPG safety system,Siemens Simatics PLC ,and Bentley Nevada systems with Hitachi ,Alstom and Siemens Turbines / Alstom generators. Generators and Turbines were bomb damaged and repair work included replacement of rotors ,stators and associated instrumentation on the generator. Programming of the LGPG system ,verification/simulation of all trip levels - over current/under current /under voltage/over voltage/ stator and rotor earth fault protection and programming of safety logic, client witnessing / commissioning /start-up and handover of renovated systems.
  • Eastman Kodak - COMMISSIONING ENGINEER

    1999 - 1999 End of March 2000 Fluor Daniel /Eastman Kodak Project
    Duties include
    Responsibility to Kodak for the test and verification of all instrumentation associated with the Kodak film production facility at Xiamen ( largest in Asia),systems include Allen Bradley PLC5 ,Allen Bradley Motor Drives. Siemens Westinghouse WDPF interfaced with Allen Bradley PLC5/Rosemount instrumentation and Motor Drives.Liaison with client Kodak Asia on pre commissioning /commissioning of air handling units/dampers controlled by WDPF/Allen Bradley Drives during the precoat/coating dry/wet end processing of the film. Process verification in liaison with Kodak team.Full logic verification of safety system associated with the film production facility.

    Mid July - End July 1999 Judy Platform Phillips Petroleum Offshore Scotland

    INSTRUMENT/TURBINE SYSTEM COMMISSIONING ENGINEER

    Duties included
    The verification of all instrumentation associated with a Nuovo Pignone PGT25 Gas Turbine/Compressor installed on the offshore platform - Judy. Installation and verification of upgrade instrumentation after the breaking down of the turbine and replacement of all 1st stage/2nd stage components along with a modification to thermocouple positions/ replacement thereof within the first stage of the compressor. Full verification of all client concerns on the Turbine/Compressor/Bentley Nevada 3300 and rectification thereof.
  • Eastman Kodak - COMMISSIONING ENGINEER

    1999 - 1999 End of March 2000 Fluor Daniel /Eastman Kodak Project
    Duties include
    Responsibility to Kodak for the test and verification of all instrumentation associated with the Kodak film production facility at Xiamen ( largest in Asia),systems include Allen Bradley PLC5 ,Allen Bradley Motor Drives. Siemens Westinghouse WDPF interfaced with Allen Bradley PLC5/Rosemount instrumentation and Motor Drives.Liaison with client Kodak Asia on pre commissioning /commissioning of air handling units/dampers controlled by WDPF/Allen Bradley Drives during the precoat/coating dry/wet end processing of the film. Process verification in liaison with Kodak team.Full logic verification of safety system associated with the film production facility.

    Mid July - End July 1999 Judy Platform Phillips Petroleum Offshore Scotland

    INSTRUMENT/TURBINE SYSTEM COMMISSIONING ENGINEER

    Duties included
    The verification of all instrumentation associated with a Nuovo Pignone PGT25 Gas Turbine/Compressor installed on the offshore platform - Judy. Installation and verification of upgrade instrumentation after the breaking down of the turbine and replacement of all 1st stage/2nd stage components along with a modification to thermocouple positions/ replacement thereof within the first stage of the compressor. Full verification of all client concerns on the Turbine/Compressor/Bentley Nevada 3300 and rectification thereof.
  • TIHAMA PROJECT ABHA - COMMISSIONING ENGINEER

    1999 - 1999 Duties Included
    Instrumentation/Pre-commissioning/commissioning of two Siemens Westinghouse 501D5 GasTurbines combined with 2 Brush Generators including all associated plant -Centrifuge and Fuel Forwarding (Alfa Laval) ,Water Treatment/UPS Activities included testing of Westinghouse WDPF /Bentley Nevada Vibration Monitoring and Technical advice. Solving all technical problems encountered/handover to the client/ client acceptance.
  • TIHAMA PROJECT ABHA - COMMISSIONING ENGINEER

    1999 - 1999 Duties Included
    Instrumentation/Pre-commissioning/commissioning of two Siemens Westinghouse 501D5 GasTurbines combined with 2 Brush Generators including all associated plant -Centrifuge and Fuel Forwarding (Alfa Laval) ,Water Treatment/UPS Activities included testing of Westinghouse WDPF /Bentley Nevada Vibration Monitoring and Technical advice. Solving all technical problems encountered/handover to the client/ client acceptance.
  • SEMPEC REFINERY UTILITIES TERMINALS - COMMISSIONING ENGINEER

    1997 - 1997 Duties included
    The pre-commissioning and verification/validation of the installation of the two STORK 70T/H Boilers on both Fuel Oil and Waste Organic Liquid recycled from the clients process producing Acetyls. Followed by the commissioning/optimization of the Ignition/Firing control systems (Four Oil Burners/Four Waste Gas/Four Heavy Organic Liquid/Four Light Organic Liquid Burners along with the Air/Steam Atomization control for the optimal ignition of the fuels and reliability of operation. The system consisted of Honeywell TDC 3000 based instrumentation and control in conjunction with Stork Burner Management Systems and associated safety systems.
  • NFL VIJAIPUR INDIA - COMMISSIONING ENGINEER

    1996 - 1997 Duties included
    The commissioning of the Heat Recovery Unit Supplementary Firing System including a Siemens S5 Simatics PLC,in liaison with a DCS (for load control),Throat Burners,Smitsvonk Ignitors, UV/IR Scanners,Iris 3001 Scanner indication Units for IR/UV radiation,Gas Skid including IGA Pilot Valves controlled by the output of a PIC/DCS linked to I/P P/P Convertors,Foxboro Intelligent Transmitters,Naphtha Skid including specialized Burners for Naphtha Firing along with a Steam Atomizing System/Naphtha System including extensive safety precautions all controlled by the DCS.
    The commissioning and Quality Control of the Naphtha and Gas System was carried out with client presence and all items commissioned to specification and accepted after successful performance /negotiations and handed over to the main contractor BWE for inclusion as part of their Boiler Installation.
  • CIBA Grimsby U.K. - COMMISSIONING ENGINEER

    1996 - maintenant Duties included
    The coordination of, quality control and planning of all activities relating to the upgrade of the plant including the introduction of Siemens S5 series PLC's plus associated smart transmitters to control all interface activities/additional process capacity.All of the installation was monitored by ABB/PCL.
    All work was scheduled with constant assistance of a planner to a definite date for the end of commissioning , as per the production requirements of CIBA (the Client).
    The project was commissioned and completed early, within budget and production was optimized at twice the required volume of product (actual production output was consistent at the equivalent of 1850 TPA (Almost twice the required improvement ).Liaison was carried out constantly between the Operators, the Chemical Engineers, the main contractor ABB/PCL and sub-contractors along with the Client with regular update meetings and detailed planning of events to liaise all disciplines requiring to work in a common area on day to day activities.
    The plant was then qualified technically over a period of three weeks in order to verify the quality and the repeatability of the process /reliability of the control equipment and the accuracy of the programs.
  • CIBA Grimsby U.K. - COMMISSIONING ENGINEER

    1996 - maintenant Duties included
    The coordination of, quality control and planning of all activities relating to the upgrade of the plant including the introduction of Siemens S5 series PLC's plus associated smart transmitters to control all interface activities/additional process capacity.All of the installation was monitored by ABB/PCL.
    All work was scheduled with constant assistance of a planner to a definite date for the end of commissioning , as per the production requirements of CIBA (the Client).
    The project was commissioned and completed early, within budget and production was optimized at twice the required volume of product (actual production output was consistent at the equivalent of 1850 TPA (Almost twice the required improvement ).Liaison was carried out constantly between the Operators, the Chemical Engineers, the main contractor ABB/PCL and sub-contractors along with the Client with regular update meetings and detailed planning of events to liaise all disciplines requiring to work in a common area on day to day activities.
    The plant was then qualified technically over a period of three weeks in order to verify the quality and the repeatability of the process /reliability of the control equipment and the accuracy of the programs.
  • CIBA Grimsby U.K. - COMMISSIONING ENGINEER

    1996 - maintenant Duties included
    The coordination of, quality control and planning of all activities relating to the upgrade of the plant including the introduction of Siemens S5 series PLC's plus associated smart transmitters to control all interface activities/additional process capacity.All of the installation was monitored by ABB/PCL.
    All work was scheduled with constant assistance of a planner to a definite date for the end of commissioning , as per the production requirements of CIBA (the Client).
    The project was commissioned and completed early, within budget and production was optimized at twice the required volume of product (actual production output was consistent at the equivalent of 1850 TPA (Almost twice the required improvement ).Liaison was carried out constantly between the Operators, the Chemical Engineers, the main contractor ABB/PCL and sub-contractors along with the Client with regular update meetings and detailed planning of events to liaise all disciplines requiring to work in a common area on day to day activities.
    The plant was then qualified technically over a period of three weeks in order to verify the quality and the repeatability of the process /reliability of the control equipment and the accuracy of the programs.
  • CIBA Grimsby U.K. - COMMISSIONING ENGINEER

    1996 - maintenant Duties included
    The coordination of, quality control and planning of all activities relating to the upgrade of the plant including the introduction of Siemens S5 series PLC's plus associated smart transmitters to control all interface activities/additional process capacity.All of the installation was monitored by ABB/PCL.
    All work was scheduled with constant assistance of a planner to a definite date for the end of commissioning , as per the production requirements of CIBA (the Client).
    The project was commissioned and completed early, within budget and production was optimized at twice the required volume of product (actual production output was consistent at the equivalent of 1850 TPA (Almost twice the required improvement ).Liaison was carried out constantly between the Operators, the Chemical Engineers, the main contractor ABB/PCL and sub-contractors along with the Client with regular update meetings and detailed planning of events to liaise all disciplines requiring to work in a common area on day to day activities.
    The plant was then qualified technically over a period of three weeks in order to verify the quality and the repeatability of the process /reliability of the control equipment and the accuracy of the programs.
  • CIBA Grimsby U.K. - COMMISSIONING ENGINEER

    1996 - maintenant Duties included
    The coordination of, quality control and planning of all activities relating to the upgrade of the plant including the introduction of Siemens S5 series PLC's plus associated smart transmitters to control all interface activities/additional process capacity.All of the installation was monitored by ABB/PCL.
    All work was scheduled with constant assistance of a planner to a definite date for the end of commissioning , as per the production requirements of CIBA (the Client).
    The project was commissioned and completed early, within budget and production was optimized at twice the required volume of product (actual production output was consistent at the equivalent of 1850 TPA (Almost twice the required improvement ).Liaison was carried out constantly between the Operators, the Chemical Engineers, the main contractor ABB/PCL and sub-contractors along with the Client with regular update meetings and detailed planning of events to liaise all disciplines requiring to work in a common area on day to day activities.
    The plant was then qualified technically over a period of three weeks in order to verify the quality and the repeatability of the process /reliability of the control equipment and the accuracy of the programs.
  • CIBA Grimsby U.K. - COMMISSIONING ENGINEER

    1996 - maintenant Duties included
    The coordination of, quality control and planning of all activities relating to the upgrade of the plant including the introduction of Siemens S5 series PLC's plus associated smart transmitters to control all interface activities/additional process capacity.All of the installation was monitored by ABB/PCL.
    All work was scheduled with constant assistance of a planner to a definite date for the end of commissioning , as per the production requirements of CIBA (the Client).
    The project was commissioned and completed early, within budget and production was optimized at twice the required volume of product (actual production output was consistent at the equivalent of 1850 TPA (Almost twice the required improvement ).Liaison was carried out constantly between the Operators, the Chemical Engineers, the main contractor ABB/PCL and sub-contractors along with the Client with regular update meetings and detailed planning of events to liaise all disciplines requiring to work in a common area on day to day activities.
    The plant was then qualified technically over a period of three weeks in order to verify the quality and the repeatability of the process /reliability of the control equipment and the accuracy of the programs.
  • CIBA Grimsby U.K. - COMMISSIONING ENGINEER

    1996 - maintenant Duties included
    The coordination of, quality control and planning of all activities relating to the upgrade of the plant including the introduction of Siemens S5 series PLC's plus associated smart transmitters to control all interface activities/additional process capacity.All of the installation was monitored by ABB/PCL.
    All work was scheduled with constant assistance of a planner to a definite date for the end of commissioning , as per the production requirements of CIBA (the Client).
    The project was commissioned and completed early, within budget and production was optimized at twice the required volume of product (actual production output was consistent at the equivalent of 1850 TPA (Almost twice the required improvement ).Liaison was carried out constantly between the Operators, the Chemical Engineers, the main contractor ABB/PCL and sub-contractors along with the Client with regular update meetings and detailed planning of events to liaise all disciplines requiring to work in a common area on day to day activities.
    The plant was then qualified technically over a period of three weeks in order to verify the quality and the repeatability of the process /reliability of the control equipment and the accuracy of the programs.
  • CIBA Grimsby U.K. - COMMISSIONING ENGINEER

    1996 - maintenant Duties included
    The coordination of, quality control and planning of all activities relating to the upgrade of the plant including the introduction of Siemens S5 series PLC's plus associated smart transmitters to control all interface activities/additional process capacity.All of the installation was monitored by ABB/PCL.
    All work was scheduled with constant assistance of a planner to a definite date for the end of commissioning , as per the production requirements of CIBA (the Client).
    The project was commissioned and completed early, within budget and production was optimized at twice the required volume of product (actual production output was consistent at the equivalent of 1850 TPA (Almost twice the required improvement ).Liaison was carried out constantly between the Operators, the Chemical Engineers, the main contractor ABB/PCL and sub-contractors along with the Client with regular update meetings and detailed planning of events to liaise all disciplines requiring to work in a common area on day to day activities.
    The plant was then qualified technically over a period of three weeks in order to verify the quality and the repeatability of the process /reliability of the control equipment and the accuracy of the programs.
  • CIBA Grimsby U.K. - COMMISSIONING ENGINEER

    1996 - maintenant Duties included
    The coordination of, quality control and planning of all activities relating to the upgrade of the plant including the introduction of Siemens S5 series PLC's plus associated smart transmitters to control all interface activities/additional process capacity.All of the installation was monitored by ABB/PCL.
    All work was scheduled with constant assistance of a planner to a definite date for the end of commissioning , as per the production requirements of CIBA (the Client).
    The project was commissioned and completed early, within budget and production was optimized at twice the required volume of product (actual production output was consistent at the equivalent of 1850 TPA (Almost twice the required improvement ).Liaison was carried out constantly between the Operators, the Chemical Engineers, the main contractor ABB/PCL and sub-contractors along with the Client with regular update meetings and detailed planning of events to liaise all disciplines requiring to work in a common area on day to day activities.
    The plant was then qualified technically over a period of three weeks in order to verify the quality and the repeatability of the process /reliability of the control equipment and the accuracy of the programs.
  • CIBA Grimsby U.K. - COMMISSIONING ENGINEER

    1996 - maintenant Duties included
    The coordination of, quality control and planning of all activities relating to the upgrade of the plant including the introduction of Siemens S5 series PLC's plus associated smart transmitters to control all interface activities/additional process capacity.All of the installation was monitored by ABB/PCL.
    All work was scheduled with constant assistance of a planner to a definite date for the end of commissioning , as per the production requirements of CIBA (the Client).
    The project was commissioned and completed early, within budget and production was optimized at twice the required volume of product (actual production output was consistent at the equivalent of 1850 TPA (Almost twice the required improvement ).Liaison was carried out constantly between the Operators, the Chemical Engineers, the main contractor ABB/PCL and sub-contractors along with the Client with regular update meetings and detailed planning of events to liaise all disciplines requiring to work in a common area on day to day activities.
    The plant was then qualified technically over a period of three weeks in order to verify the quality and the repeatability of the process /reliability of the control equipment and the accuracy of the programs.
  • L.N.G. REFINERY Renovation Project SKIKDA - Commissioning Manager

    1995 - 1996 CONSULTANT TO THE ALGERIAN OIL COMPANY (SONATRACH)

    Duties Included
    The day to day problem solving in liaison with Sofregaz/Sonatrach and Vincotte covering all aspects of the installation of the TDC 3000 Honeywell System and network communication interfaces including fibre optic transmission in association with smart transmitters along with standard auxilliary instrumentation .The liaison/coordination of activities between the contractors (in order to ensure the completion of each installation to enable the work to continue on the installation and verification of the D.C.S.(TDC3000) in liaison with control/PLC instrumentation from manufacturers such as Allen Bradley,
    Bailey,Fisher,Maisoneilan in packages for Electrochlorination , Demineralisation, Boilers 45T/H,100T/H,
    320T/H from manufacturers KREBS/INFILCO/DEGREMONT/GEC STEIN/ABB/MITSUBISHI.
  • L.N.G.Refinery Plant - INSTRUMENT DEVELOPMENT SUPERVISOR

    1995 - 1995 Duties included
    The supervision and technical directing of all instrumentation staff working for the sub-contractor Chiyoda Keiso.Subsequent daily reports were submitted to the client on daily progress.The technical direction of the installation and the pre-commissioning checks/quality control of all instrumentation and packaged equipment from manufacturers such as Nuovo Pignone,Solar Turbines,Foxboro (I/A System)-DCS including Bentley Nevada vibration monitoring and Speedtronics MKVplus others.The inspection and evaluation of and the reporting on all instrumentation received for the $6bn project accompanied by full damage reports and insurance assessments.
  • L.N.G.Refinery Plant - INSTRUMENT DEVELOPMENT SUPERVISOR

    1995 - 1995 Duties included
    The supervision and technical directing of all instrumentation staff working for the sub-contractor Chiyoda Keiso.Subsequent daily reports were submitted to the client on daily progress.The technical direction of the installation and the pre-commissioning checks/quality control of all instrumentation and packaged equipment from manufacturers such as Nuovo Pignone,Solar Turbines,Foxboro (I/A System)-DCS including Bentley Nevada vibration monitoring and Speedtronics MKVplus others.The inspection and evaluation of and the reporting on all instrumentation received for the $6bn project accompanied by full damage reports and insurance assessments.
  • RACAL (Seaton ) - ELECTRONICS ENGINEER

    1994 - 1994 Duties included
    The test fault find of all different types of communication equipment,interfaces and V.H.F./U.H.F. transmitters and receivers,and power supplies as used by the R.A.F;Army and Navy.All fore-mentioned equipment are fault found to component level and then tested to full military specifications and verified during stringent environmental tests.
  • Shell - INSTRUMENT SUPERVISOR ENGINEER

    Paris 1992 - 1994 Duties included
    The day to day running of the instrument department negotiation of service contracts and planning of the local workforce to cover all the duties associated with a large field such as Rabi.Technical advice and instruction/feasibility studies on upgrade instrumentation including Foxboro/Fisher/Maisoneilan instruments, all part of the D.C.S.installed at Rabi and Gamba, including Allen Bradley 5 Series plc's.However,primary responsibility on site was the upkeep and breakdown repairs on Turbines inluding the intervention on Solar Turbines Bentley Nevada Vibration equipment and Speedtronics MKV and Nuovo Pignone compression stages and all process control associated with a Turbine and a four stage compressor (E.G.Interstage coolers and gas scrubbers and associated pressure/flow/surge control systems including a Petro Tech Anti-Surge Control System-ASC M2T.Also intervention on the Ruston Turbines installed at Rabi along with all other equipment including Caterpillar/Waukesha/Guinard and Bornemann pumps and all associated control equipment.Also well head control panels including Rasspe and Otis.
  • Technopromimport - Commissioning /Handover Engineer

    1991 - 1992 Duties Included
    Supervision and control,followed by test and commissioning of the installation consisting of electronic/electrical equipment,(specifically computer and technological equipment to be used throughout the process of manufacture within the PLC factory);including Auto-Guided Vehicles Conveyor systems throughout the factory ,Auto Component Stores including the incoming computerized barcoded registration and logging of all components received which after being barcoded were sent by conveyor/auto guided vehicle to the relevant section ready to build the next batch of GEC GEM 80 PLCS ( all movement of materials were controlled by dedicated computer systems/PLC's (installed for every application throughout the 260 million pound installation ,Auto Insertion,Auto Test;Systems manufacturers included Marconi/Schlumberger,BTCS(Sweden),I.C.L.and G.E.C.All control and monitoring features were covered by GEC GEM 80 PLC's and associated items.
    Day to day duties also included providing clients with technical instruction and consultation as required.Establishing and maintaining good relations between site staff and client personnel.Recording of any changes which were found to be required as a result of site considerations an As-Built drawings.
  • GEC General Signals - Commissioning/Handover Engineer

    1985 - 1987 Duties included
    The test ,commissioning ,and handover of all equipment associated with the London Underground including the control of all trains and associated signaling equipment and interlocks enabling the controlled arrival/departure of all trains and co-ordinated displays on both the platforms and in the offices along with the associated video systems.All systems were pre-verified debugged in close co-operation with the client and the relevant design/development department.All reed oscillators were verified for the correct frequency and all systems accepted by the relevant "British Rail Engineering Ltd" Inspector prior to shipment.Stringent acceptance procedures were implemented as per British Rail high standards and requirements.
  • PADDINGTON AND N KENSINGTON AHA - Contract Biomedical Engineer

    1985 - 1987 Duties included
    The test fault find and repair of all biomedical equipment including infusion pumps, diathermies, syringe pumps, ecg monitors , defribrilators etc etc .All equipment was tested diagnosed and repaired on site. Intrinsic safety tests were carried out to ensure the equipment was indeed safe before returning for use by the medical staff.

    CAMBRIDGE INSTRUMENTS U.K.

    Contract Test/System Test Engineer

    Duties Included
    The System build,test,fault-find ,repair,calibration and commissioning of an Electron Beam Microscope System based on a 68000 microprocessor system.Also,the alignment and setting up of monitors used in conjunction with the system.

    POLYTECHNIC ELECTRONICS U.K.

    Contract Test Engineer

    Duties Included
    The test,fault find and repair of a 6800/6802 based system used to process signals received from a satellite transmitter at frequencies of upto 400MHz.The unit was used in conjunction with an L.C.D. Screen to give a Longitude/Latitude reading in degrees,minutes and seconds.The system used a phase locked loop to lock onto the signals and the tracking of three satellites.Also being developed was a three dimensional version for military use,this version to be based on a 68000 microprocessor.

    WALTER MICROSYSTEM U.K.

    Contract Test Engineer

    Duties Included
    The testing of C.R.T.'s and the associated setting of the frame size/linearity/focus and subsequent verification by generation of data patterns.Testing of the keyboard and associated firmware using EPROM based programs,the system being based on a 68000 microprocessor.

    MECAR S.A. BELGUIM

    Contract Design and Development Engineer

    Duties Included
    The test,evaluation,design and development of all electronic items connected with new products.Also being used was high speed photography for in flight information.

    VERNON GAUGING SYSTEMS U.K.

    Contract Test Engineer

    Duties Included
    The test,fault find,repair and calibration of electronic vernier gauging systems to component level.The system was based on a 68000 microprocessor and transducer;calibration was carried out using a precision Vernier gauge in conjunction with a bargraph display and monitors to enhance the use of the system.

    HONEYWELL INFORMATION SYSTEMS U.K.

    Contract Test Engineer

    Duties Included
    The test,fault find repair and calibration of all types of boards associated with the TDC2000
    And the Real Time Interfaces,A to D and D to A convertors,RAM/ROM and CPU boards using a dual 8086 microprocessor,in a standard 19 inch rack system to be used as data acquisition and control in support to several Honeywell PLC networks in petrochem and power station projects one of these being Dungeness B.

    E.R.A. U.K.

    Contract A.T.E. Development Engineer

    Duties Included
    The development and programming from concept to full production test of a Wayne Kerr A.T.E. system in order to test Engine Control Units.These units consisted of an EPROM based program specifically developed for the different type of vehicle and fuel injector type.The instrumenting of the test bays for the development engines included piezo electronics,temperature and pressure sensors to enable full analysis of the engine performance under normal and extreme conditions.These engines having been developed solely for use in the Benelux countries.

    U.C.S.L.Dataport Microsystems U.K.

    Contract Service Engineer

    Duties Included
    The servicing and repair to component level and re-calibration of hand held data transmission terminals,modems,printers,and data receivers/processors,also barcode pens and decoders,all of which had to be fully re-commissioned prior to return to the customer.
  • Consolidated Contract Services Ltd. - Troubleshooter

    1984 - 1991 Employed with the above company on a freelance basis on varying term contracts acting as troubleshooter ranging from technician to engineer responsibilities.

    A.F.P.C/TSTC,Damascus,SYRIA

    Contract Instrument Supervisor/Engineer

    Duties included

    Pre-Commissioning of plant followed by normal operation.Responsibility for the execution of all instrument maintenance and system upgrade in the field,production facilities,pipeline terminal,well head or fiscal metering station as and when necessary.Responsibility for the technical and administrative direction of the Syrian workforce.Equipment being worked on was both pneumatic and electronic including controllers,recorders metering equipment,control valves,regulators and PLC's from manufacturers such as Maisoneilan,Fisher,Allen Bradley and A.O.Smith Inc.

    A.D.C.C.(Adgas),DAS ISLAND,U.A.E.

    Contract Service Engineer

    Duties Included

    The shutdown servicing and repair of all instrumentation being used in the petrochemical refinery complex.Equipment serviced included temperature pressure and flow,transducers,indicators,controllers and recorders;also level switches,valves,control valves,valve positioners,pressure switches and purple peepers interfaced with various PLC's as a part of a basic D.C.S.Manufacturers included Fisher,Kent,Babcock, Bristol,Bailey,Honeywell and Wallace and Tiernan.

    STC BASILDON U.K.

    Contract Test/In- House Commissioning Engineer

    Duties included
    The test fault find diagnosis in- house commissioning and detailed analysis of 565 Mbit /140 Mbit Fibre-Optic data communication modules including interfaces such as Multiplexers De- Multiplexers Fibre-Optic Interfaces and verification of drums of cable using OTDR to verify any errors caused due to imperfections in the fibre- optic or the interface module

    CERN Geneva SWITZERLAND

    Contract Commissioning Engineer

    Duties included
    The testing of all interconnecting cables within the 26 km installation including all of the data logging equipment installed in the stations above ground.All communications with the client and the two sub-contractors were carried out in French.The subsequent commissioning of the integrated monitoring/control systems (for the accelerator/safety and control interlocks).All of this was finalized by the handover of all of the installation to CERN as the end user.

    GECMUSL U.K.

    Contract Repair Engineer

    Duties included
    The test and fault find on Nimrod and Seaking receivers/transmitters,working at R.F. military frequencies.Also,work carried out on remote controlled buoys,all of the equipment uses technology solely developed for MOD purposes.
  • KENT INDUSTRIAL MEASUREMENTS - Apprentice Electronic and Instrumentation Engineer

    1979 - 1983 Duties Included
    During the apprenticeship practical experience was gained in all aspects of the process control industry including electronic test, fault-find, repair and calibration of the Kent Series of products ranging from flow meters/transducers to programmable logic controllers (P4000).Also, pneumatic control including controllers, integrators and recorders,(for intrinsic safety applications within the Petrochem Industry).Fourth Year specialized in customer services; giving technical advice, information and quotations etc; in response to customer enquiries both written and telephone/telex enquiries, followed by on-site visits.

Formations

  • University Of Luton http://www.luton.ac.uk/ (Luton)

    Luton 1979 - 1983 HNC INSTRUMENTATION

    CONTROL AND INSTRUMENTATION