Philippe KOEBERLE

Paris

En résumé

Competences:
--------------------
Lead electrical engineer ;
Costing and planning ;
Leader and manager of electro technical revamping ;
Leader and manager of electro technical study ;
Supervisor of providers and subcontractors ;
Site supervisor ;
Electrical designer.

Activity sector:
---------------------
Logistic and supply chain ;
Industrial automation industry ;
Energy ;
Automotive ;
Transportation ;
Mechanical and industrial engineering.

Linkedin weblink:
lu.linkedin.com/pub/philippe-koeberle/51/bb6/574/

Mes compétences :
Microsoft Office
Caneco
AutoCAD
Management
Electrical designer
Eplan P8
Project leader
TR-CIEL
Electrical Engineering
Mechanical engineering
Lead electrical engineer
Industrial automation industry
Sistema
UL Norms
EN Norms

Entreprises

  • Safran - Electrical Engineer

    Paris 2014 - 2014 Consultant at PM OPTIMA Sàrl - Luxembourg
    ------

    LEAP-X project (intended to be a successor to the CFM56-5B and CFM56-7B).
    ----
    The need is to upgrade three test cells based in Belgium and Poland.

    Realisations/ Activities :
    Designing and sizing the electrical power part on each test cell ;
    Sizing instrumentation and power cabinets/boxes on each test cell ;
    Writing technical specifications about erection of each cabinet/box.

    Results:
    Cabinets and boxes are at the moment in erection.
  • APCO Technologies - Electrical engineer in Nuclear and US machiney Dep.

    2014 - maintenant
  • CTI SYSTEMS - Electrical Engineer

    2013 - 2014 Consultant at PM OPTIMA Sàrl - Luxembourg
    ------

    ~*~Bombardier – Canada: The final customer ordered special elevating platforms (authorised in U.S. hazardous location) to paint it aircrafts.

    • Writing technical specifications about different kinds of remote control in class 1 Division 1 (HazLoc) ;
    • Benchmarking on US products (UL-CSA) ;
    • Designing and sizing the electrical part (NFPA norms /E PLAN P8).

    ~*~Airbus – Germany: The final customer ordered an automatic conveyor to load and unload the Beluga aircraft in automatic mode.

    • Auditor and advisor on automation, electrical part and Safety Integrity Level (SIL);
    • Sizing cables and apparatus through each consumer (Simaris).

    ~*~Turkish Airlines – Turkey: The final customer ordered maintenance docks for different kinds of aircraft, including having power supply on each dock part.

    • Writing technical specifications about normal and Ɛx :
    • Lights ;
    • Plugs / sockets ;
    • Drives.
    • Designing and sizing the electrical part (European norms/E PLAN P8) ;
    • Designing drives and frequency converter with wiring control/command and safety ;
    • Sizing the Safety Integrity Level (SIL) on the whole project.

    ~*~Paul Wurth – China: The final customer ordered a conveyor system which is able to move train bogies in different areas.

    • Designing and sizing the electrical part (European norms/E PLAN P8) ;
    • Sizing the Safety Integrity Level (SIL) on the project ;
    • Monitoring erection in workshop.
  • Cofely Fabricom GDF SUEZ - Electrical Engineer

    2012 - 2013 Conclusion of contract with V.I.E (Volontariat International en Entreprise), I brought my services to Cofely Fabricom GDF SUEZ as Electrical Engineering and P.I.D engineering too.
    Consultant at Ubifrance and MCA Benelux - France / Belgium
    ------

    ~*~SCA Hygiene Products SA – Belgium: Revamping of Low Voltage Main Board and Motor Control Center.

    • Analysis and audit of the actual system on site ;
    • Writing technical specification to revamp (Customer point of view) ;
    • Creation and set up a template of technical specification for electrical revamping.

    ~*~GlaxokSmithKline – Belgium: pharmaceutical projects.

    • Designing and sizing the electrical part (European norms/Belgian norms/E PLAN P8).

    ~*~Cabot Plastic Belgium - Belgium: Revamping of Motor Control Center.

    • Analysis and audit of the actual system on site ;
    • Writing technical specification to revamp (Customer point of view) ;
    • Designing and sizing the electrical part (European norms/Belgian norms/E PLAN P8).

    ~*~Electrabel Tihange - Belgium: Design of ultimate safety electrical power units for the nuclear plant in Tihange.

    • Designing and sizing the electrical part (European norms/Belgian norms/E PLAN P8) ;
    • Monitoring erection in workshop.

    ~*~Electrabel Tihange - Belgium: Supplies inverter to the secondary cooling system.

    • Designing and sizing the electrical part (European norms/Belgian norms/E PLAN P8) ;
    • Monitoring erection in workshop.
  • ThyssenKrupp Presta France SAS - Lead Electrical Engineer

    Saint Barthélemy d'Anjou 2009 - 2012 Accomplished with a work-study program

    Project concerning the ageing of machine park - Head of retrofit project

    Summary and objectives of project :
    - Reliability of the park machine - Cutback of M.T.B.F
    - Standardisation of obsolete electrical equipment - Cost reduction of storage and modernisation of equipment.

    Works accomplished :
    - Improvement, expansion and realization of retrofit
    - Electrical design and automation (motor and drive Bosch Rexroth)
    - Planning and costing of technical solutions
    - Preparation of technical specifications
    - Deployment of internal and external resources (Subcontractor)
    - Risk analysis of project
    - Risk analysis of machinery (EN13849 - EN12100 - EN62061)
    - Electrical study
    - Automation study
    - Program study
    - Fitter and cable-man
    - Monitoring of sub-contractor assembling
    - Management of assembly and mechanical conception
    - Putting into service of the electrical axe Bosch Rexroth
    - Customer commissioning

    Deliverable/Results :
    - Deadline respected, long term cost effective
    - Expansion and installation, (4 months after development)

    Developed skills:
    - Method of problems solving D.M.A.I.C
    - Respect of Golden triangle (Cost Time Quality)


    Retrofit on measuring station : Friction and radial pulsing of steering column
    March 2011 – May 2012
    - Functional analysis
    - Costing and planning of technical solutions
    - Standardisation of equipment and technical requirement of the company
    - Hardware study
    - Program study
    - Parameters of speed variable drive
    - Test and trials
    - Putting into service



    Retrofit on measuring station : axial clearance of steering column
    May 2012 – August 2012
    - Functional analysis
    - Costing and planning of technical solutions
    - Standardisation of equipment and technical requirement of company
    - Hardware study
    - Program study
    - Parameters of speed variable drive
    - Test and trials
    - Putting into service
    - Feedback on the project to create a white paper concerning standard integration of equipment
  • LyondellBasell - Electrical Technician

    Berre l'etang 2007 - 2009 Accoplished with a work-study program

    Shell Pétrochimie Méditerranée
    July 2007 – August 2009 (2 years 2 months)|13130 - Berre l'Etang
    Electrical technician for maintenance and production

    Summary and objectives of project :
    - Improvement of electrical control of an overhead conveyor
    - Renovation of the overhead conveyor system to cutback M.T.B.F during the maintenance of air compressors

    Works accomplished :
    - Expansion and realisation of the control (Altivar Schneider Electric)
    - Planning and costing of technical solutions
    - Preparation of technical specifications
    - Deployment of internal and external resources (Subcontractor)

    Deliverables/Results:
    - Deadline respected, long term cost effective

    Future task action :
    - Preparation of an action plan until allocated budget

    Developed skills :
    - Development of costing, planning and resources management
    - Management project
    - Respect of Golden triangle (Cost Time Quality)
    - Long-term depreciation of project cost
  • Arcelor Mittal - Machine operator in shift work

    2007 - 2007 Transport of steel bar according to the needs of supply chain conveyor

Formations

  • Université Technologique De Belfort Montbéliard (UTBM)

    Belfort 2009 - 2012 Electrical Engineering with a work-study program

    Electrical, Electronics and Communications Engineering
  • CFAI Provence (Istres)

    Istres 2007 - 2009 Electrical technician with a work-study program

    Electrical and Power Transmission Installation/Installer
Annuaire des membres :