Menu

Pierre DU PONTAVICE

Paris

En résumé

Project Management : EVA, Budget tracking, Invoicing, Quotation, Resource Management, Reporting.
Development method : ISO26262, ISO15504 SPICE, V Cycle (procedure writing and usage), UML, SART/SADT
Real Time OS : OSEK, Meego, Linux, OS20, Windows CE
Target : ST20, NEC 78k0, PIC 16Cxx, PIC18Fxx, MOTOROLA MPC 5xx and 68HC05, 68HC11, 68HC12, TMS470
Programming language : C, C++, Assemblers ST Microelectronics ST20, Motorola 68HC05, 68HC11, NEC 78k0, Microchip PIC
Protocols : CAN / VAN, KWP2000, SPI, SCI
Development tools : - TeamWork SART design, allow data dictionary check,
- Mathlab simulink for specification writing.
- Use of various compilers and emulators.
Software Quality : - QAC
- Polyspace.
Configuration management : - Clearcase, PVCS, MKS, Continuus : Files version management
- ClearQuest : File integration, Quality trace, delivery.
Planning : Microsoft Project - TSE/TSP
Standards : GENIVI, ISO26262, OSEK, KWP2000, ISO 9000, EAQF, QS9000, VBOS, VEP, VPDDS
Hardware and systems : Emulators, Windows, definitions and usage of device and test bench.
Electronics : Accelerometer component selection, ASIC, Micro controller

Mes compétences :
Anglais
Automobile
Bilingue Français Anglais
Chef de projet
Français
Manager
Microsoft Project
Projets internationaux
Secteur automobile
Gestion de projet

Entreprises

  • Valeo Engine and Electrical Systems

    Paris maintenant
  • Valeo - Leader Metier Software

    Paris 2015 - maintenant
  • Valeo - Software Standard Leader

    Paris 2012 - 2014
  • Pi Shurlok Ltd - Project Manager

    2011 - 2011 • Project Manager (team of 5 more to come)
    o Engine Control Module
    o More than £1000k /annual
    o Project Planning
    o Resource Management
    o Invoicing
    o Customer reporting
    o Change Request and New Quotation
    o Component Supplier Management
  • Visteon - SW Project Manager

    PARIS LA DEFENSE 2005 - 2010 • Software Project Manager (team of 10 more to come)
    o GENIVI based project
    o JLR Project / Einstein 1.5 platform
    o First DI Project to be run at Plateau 5
    o Coordinatation of a World Wide Team (US, India, UK, Germany, France) using TSP/TSE and PTO procedure.
    o Active participation at SW quality improvement using ISO 15504 (SPICE Model)
    o Definitions of Software Project Plan and all SW project document.
    o Part of Goal Team 4 – ClearQuest process improvement.

    • Software Team leader (up to 25 people)
    o PQ35 / K-SUV / PQ46 project
    o Maintenance of the SDP
    o Management of a the team in UK and INDIA with MS Project
    o Successfully deliver 3 Model Year (6.5 & 7 & 8)
    o Build and Run SW commonisation plan between all the 3 project.
    o Development phases management with ClearCase, files integration,
    o Leading CCB for Change Request and Bug fixing using ClearQuest.
  • Delphi Diesel Systems - Senior SW Team Leader / Project Manager

    2002 - 2005 • V cycle expert and supervisor :
    o Specification reviews ( Mathlab Simulink).
    o design reviews Teamwork which is based SART method.
    o Coding reviews in term of functionalities and quality (respect of programming rules).
    o Unitary static and dynamic test with QAC tool. Before integration of each code, static tests runs.
    o ATTOL and Polyspace tests on each source file before integration.
    o V cycle procedure updating.

    • Software project leader (4 people)
    o Bootloader and watchdog functionalities.
    o Attempt to the definition of Controller monitoring concept (control of an application by an external process shared on to processors).
    o Team Planning with MS Project ,
    o Development phases management with ClearCase, ClearQuest, files integration, Bug fixing management and action plan.
    o Delivery document creation and usage.
    OS : scheduler
    Target : Motorola MPC 5xx, Microchip PIC 18F8xx.
    Language : C et Assembleurs
    Electronics : Flash memory, SPI, SCI, CAN
  • Siemens VDO SAS - Senior SW Team Leader / Project Manager

    2001 - 2002 09/2001-09/2002 : Siemens VDO Automotive SAS – Toulouse (31)

    • Software project leader (3 people )
    o Body controller diagnostics function development management according V cycle:
    o Software team in Romania Exchanges by phone, mail only in english.
    o Made the team aware of V cycle
     Design reviews written with Word.
     C coding reviews.
     Validation and tests specification reviews
    o System specification writing help
    o Planning validation
    o Source code management with Continuus (shared with Romania and Germany)
    o Definition of DIAGONCAN protocol specification
    o Help the customer for his specification writing
    o Tests platform selection
    o Attended to an UML course.

    OS : self made
    target : Motorola 68HC12
    Language : C, C++
    Electronics : Flash memory, CAN bus


    01//2001-09/2001 : Siemens VDO Automotive SAS – Regensburg (Germany)


    • Software function responsible
    o DVD controller development
    o Application update in flash memory management.
    o Writing specification.
    o On target tests
    o Writing of design documents


    OS : OS20, Windows CE
    Target : ST20
    Language : C, C++
    Electronics : Flash memory, ATAPI bus.
  • Infort - SW engineer

    Rueil-Malmaison 1998 - 2000 01/2000-12/2000 : Delphi Diesel System – Blois (41)

    • Software expert
    o Incorporation of V cycle procedures
    o Specification reviews
    o Design reviews (Teamwork).
    o Coding reviews
    o Integration building application with ClearCase.
    o Conception help
    • Engine torque function responsible
    o Writing up preliminary design document (SART with TeamWork).
    o Writing up detailed design document (pseudo code).
    o On target tests
    OS : scheduler
    Target : Motorola MPC 5xx
    Language : C et Assembler
    Electronics : Accéléromètre
    12/1998-12/1999 : TRW – Nanterre (92)

    • Responsible for software development of body controller Module Keyless entry, Central locking system, Immobiliser, electronics timing and automatics commands.
    o Supervising a team of 3 persons.
    o Managing development planning
    o Instructed the team in the team in the real time embedded software specificities
    o Validation tests
    o International projects: Korea, China, England, Poland.
    o Help the customer for his specification writing
    • Responsible of the incorporation and creation of V cycle procedures
    o Awarness the hierarchy to the V cycle necessity
    o Writing up procedures.
    o Selection of tools : ATTOL for source code tests , Select Yourdon or Case TOOL for design, PVCS configuration management.
    o language C switch


    OS : home made
    Target : Microchip 16Cxx and Motorola 68HC05
    Language : C and assembler
    Electronics : SPI, RF device, EEPROM
  • Autoliv Electronics SAS - SW engineer

    1995 - 1998 • Interfaced all other team involve in the development (France and ).
    • System expert
    o FMEA .
    o Electronics components selection (Accelerometers, ASIC).
    o Tracking anomalies and corrective actions
    o Tests plan agreement
    o Writing up validation and factory tests bench specifications
    o Belong to improvement of development process team using KAIZEN method.
    • New generation software architecture.
    o Selection of targets
    o Selection of OS (OSEK like)
    o Selection of configuration management (MKS).
    • Supervisor for crash algorithm software development (cycle en V),
    o Writing up specifications SART with Select Yourdon
    o Writing up validation tests specifications
    o Agreement of test plan and test results
    • Participated actively to certifications EAQF, QS9000, ISO9000


    OS : OSEK (like)
    target : NEC 78k0 and Toshiba TLS
    Language : C et Assembler
    Electronics : Accelerometers, PWM, SPI, ASIC

Formations

Réseau

Annuaire des membres :