-
BOURBON GAIA -OFFSHORE
- Offshore manager
2013 - maintenant
Shift Supervisor for installation of subsea equipment with ROV on AKPO/USAN TOTAL Company Field on board the MPSV DP2 Bourbon Trieste
-
GEOCEAN
- Project Engineer / Project Manager
2008 - 2013
GORGON - DOMGAS Project: PROJECT MANAGER Upgrading of shallow water pipe-laying barge as per Australian standard including dry docking. (SAPURA-CLOUGH-Australia).
SOUTH MAHAKAM Project Indonesia: August 2011-March 2012: LEAD ENGINEER 24” and 14” gas pipeline, 2x10km in Shallow water-landfall, laying and post-trenching (NISCONI-TOTAL INDONESIA).
LIBYA AL KHALIJ: December 2008- March 2011. CIVIL WORK MANAGER Installation of marine water Inlet/outlet (3m diameters GRP pipes, 4x1100m and 4x400m), Installation of 2x2000m x 24” pipeline and SPM for Al Khalij Power Plant (Sirte Libya). Construction Manager. Design, execution, of permanent shore protection, backfilling, dredging, temporary loading facilities. (GECOL-BECHTEL Int.)
-
LD Travocean
- Shift Supervisor
2008 - 2008
KASHAGAN - Offshore laying and burial of 80 km of Optic Fibre Cable with underwater remote plough and trenching in Caspian sea – KASHAGAN Project –( SONSUB-SAIPEM)
Offshore post trenching of power cable (Ø200mm) with underwater remote trencher of 40 km in Persian Gulf (Dalma Island) – (NEXANS)
-
GEOCEAN
- Project Engineer
2006 - 2008
TETOUAN - MAROC - 3Km Outfall Project in Tetouan (Morocco) of PEHD Ø1200 mm. Engineering and management of dredging, pipes preparation and laying operations.
-
CMA CGM
- Engineer Superintendant
Marseille
2006 - 2006
Superintendant for Conteneur ship vessels
-
Van Oord
- Project Engineer
2003 - 2005
-(March-October 2005): Quay #9 in Car Ferry Terminal of the Calais Port (France). Dredging of 280,000m3 of sand and dumping 80,000 tons of rocks.
-(March-August 2005): Dredging of 45,000m3 of contaminated mud in the Lys river in the North of France. Construction of an impermeable landfill for the placement of the polluted dredged material. Monitoring of the water quality issue from the drainage of the dredged material.
-(January-February. 2005) Preparation of projects : “Protection of the Normandy Bridge piles”, “Dredging of Quay #9 in Calais Port”.
-(August-December 2004)-Jetty Construction in the Seine River Estuary. Dumping of 100,000tons of stones
- (Mai 2004) Dredging access channel to Ouistreham. Dredging of 15,000m3 of sand and clay.
-(March 2003-February 2004) Laying of 11km of pipe of PEHD (Ø1600 mm) for the Montpellier Outfall (FRANCE).