PRO-TECH
- Manager
2013 - 2017
: Manager ( Number of employees 10 to 20)
* Consultant in QSE management systems
* Assistance to PRO-TECH clients in safety and maintenance procedures.
* Achieved some PRO-TECH clientsshutdown planning with good results.
* Follow-up of inspectors' trainings and Clients files. ;
* Quality Manager of PRO-TECH management systems ( ISO 9001- ISO 17020- ISO 17021- ISO 17024- ISO 14001 & OHSAS 18001.)
* Electrical Authorization trainings (Habilitation)
-
PRO-TECH
- Consultant & Consultant
2013 - 2017
* Assistance to PRO-TECH clients in safety and maintenance procedures ;
-
PRO-TECH
- Consultant
2013 - maintenant
* Assistance to PRO-TECH clients in safety and maintenance procedures.
* Achieved some PRO-TECH clients shutdown planning with good results.
* Follow-up of inspectors trainings and Clients files. ;
* Quality Manager of PRO-TECH management systems ( ISO 9001- ISO 17020- ISO 17021- ISO 17024- ISO 14001 & OHSAS 18001.)
* Electrical Authorization trainings (Habilitation)
-
Tunisian Ministry
- Auditor
2011 - 2011
OHSAS 18001- DQS Maghreb industry agreement in technical controls type B1, B2 and B3 (Year 2000 -2015-2016-2017)
-
QMS ISO
- Auditor & Lead Auditor
2011 - 2011
-
PONTICELLI - TOTAL Oil Field
- Method engineer
2009 - 2013
The core duties of this role included overall maintenance jobs planning, procedures writing, maintenance & material management systems-CMMS , spare parts, validation & obsolescence management.
I reviewed the whole maintenance procedures of the site, I was given the additional responsibility of managing CMMS , I was involved in updating and creating maintenance procedures and MWI of the old GOSP after its revamping, on which I contributed for finishing them successfully (Electrical, mechanical & instrumentation) .
-
Groupe Ponticelli Frères
- Method engineer
Émerainville
2009 - 2013
: Method engineer, (Rotation 4 weeks on / 4 weeks off)
* Work Procedures and maintenance work instruction (MWI),
* Reports of maintenance, Solutions searching in maintenance and technical problems linked to electrical installation and process conception, Apply corrective measures, Manage the CMMS, GMS and validate the spare parts requirements (Spare parts management) for electrical , mechanical & instrument equipments.
* Spare parts reception in yard and validation of receipts.
* Spare parts replacements and Obsolescence management. ;
* Planning of new construction works. ;
* Lifting procedures related to construction. ;
* Electrical plant start-up procedures. ;
* Electrical isolation & de-isolation procedures for HV& LV equipments ;
* Primavera and MS project tools ;
* Plant shutdown planning and overall maintenance works ;
* Documents management & update. ;
* Global maintenance system and Material Management System (GMS et CMMS)
* Familiar with maintenance and protection of HV & LV (generators, Transformer, VSD's, motors, distribution, UPS, batteries, HVAC,...)
* Assist with team leaders the maintenance of power plant DE of 8.7 MW
* Attend load shedding and sharing operations. Attend configuration with Schneider electric
* Mechanical rotating equipment, motors, HP hydraulic systems
* Field instruments, control valves, ESDV, SDVs, F&G devices
* Work with safety management for risk assessment in locations with high risk of fire or explosion. ;
-
PONTICELLI - TOTAL Oil Field
- Method engineer
2009 - 2013
* Overall maintenance jobs planning, procedures writing, spare parts, validation & obsolescence management.
* 2-years shutdown planning, 2Y spare parts requirements and the lists of tools and manpower.
* Maintenance management system-CMMS ;
* Validating spare parts PR's and technical approval of suppliers' offers. ;
* Validating spare parts receipts in yard. ;
* Updating and Creating maintenance procedures and MWI of the old GOSP after its revamping, (Electrical, mechanical & instrumentation).
* Troubleshooting main electric and automation problems in coordination with team leaders.
-
APAVE
- Inspection Engineer
Paris
2009 - 2009
* Inspection and control of lifting equipments (Mobile Cranes, overhead travelling cranes, containers, accessories..etc)
* Under pressure vessels inspection duties as : Test bench, piping and well heads under 15000 psi in the profit of SCHLUMBERGER, TOTAL, VEBA, BACKER HUGE...etc.
* ``Working in electrical vicinity'' Authorization trainings for TOTAL (Habilitation électrique).
-
APAVE
- Inspector & controller
Paris
2009 - 2009
* Inspection and control of lifting equipments (Mobile Cranes, overhead travelling cranes, containers, accessories..etc)
* Under pressure vessels inspection duties as : Test bench, piping and well heads under 15 000 psi in the profit of SCHLUMBERGER, TOTAL, VEBA, BACKER ATLAS...etc. ;
-
APAVE
- Inspection Engineer
Paris
2009 - 2009
* Inspection and control of lifting equipments (Mobile Cranes, overhead travelling cranes, containers, accessories..etc)
* Under pressure vessels inspection duties as : Test bench, piping and well heads under 15000 psi in the profit of SCHLUMBERGER, TOTAL, VEBA, BACKER HUGE...etc.
* ``Working in electrical vicinity'' Authorization trainings for TOTAL (Habilitation électrique).
-
PREVENTEC
- Inspector & Controller
1999 - 2009
* Electrical, Lifting and Gas installation Inspection and control.
* Application of Norms and Standards of electrical, lifting and Gas installations.
* Studies and safety audits.
* Trainings. ;
-
PREVENTEC
- Technical Manager, Inspection & Commissioning Engineer
1999 - 2009
-
PREVENTEC
- Technical Manager, Inspection & Commissioning Engineer
1999 - 2009
In this role, I was responsible of managing a team of Electrical, Lifting and Gas installations'inspectors (technicians and engineers).
* I achieved important electrical and F&G projects' commissioning.
* I was in charge of performing, contributing and/ or verifying studies and safety audits in application of relevant Norms and Standards.
* Electrical safety Trainings.
-
SAET
- Maintenance Engineer
Aubagne
1999 - 1999
* Maintenance of auto-commutators
* Maintenance of simple and hybrid phones ;
* Installation of phone and internet networks ;
-
CTE EL ATHIR
- Maintenance Technician
1997 - 1999
* Maintenance of soldering baths ;
* Adjusting parameters of soldering wave, preheating temperature, flux rate and speed of conveyor chain ;
-
CTE EL ATHIR
- Maintenance Technician
1997 - 1999
* Maintenance of soldering baths.
* Instrumentation control and repair.
* Adjusting parameters of soldering wave, preheating temperature, flux rate and speed of conveyor chain.
-
CTE EL ATHIR
- Maintenance Technician
1997 - 1999
* Maintenance of soldering baths.
* Instrumentation control and repair. ;
* Adjusting parameters of soldering wave, preheating temperature, flux rate and speed of conveyor chain.
-
Lumières Modernes
- Technical Team Leader
1996 - 1996
* Public lighting projects supervision and installation of LV and HV lines
* Supervision of natural gas installations in Grand-Tunis with coordination of STEG.
-
LumièresModernes
- Technical Team Leader
1996 - 1996
* Public lighting projects supervision and installation of LV and HV lines
* Supervision of natural gas installations in Grand-Tunis with coordination of STEG.
-
Lumières Modernes
- Technical Team Leader
1996 - 1996
-
Bureau d'Etudes Khayat
- Studies engineer
1995 - 1996
* Participation in electrical studies for construction projects and public areas (ERP). ;
* Participation at anti-fire studies ;
-
TAOUFIK ELECTRICAL ENTREPRISES
- Technical Manager Assistant
1993 - 1994
* Study and Supervision of public lighting projects: Calculation of voltage drop and cables dimensions either in Aluminum or Copper and derivations definition according to the lights locations.
* Planning of installationtasks for the different projects
* Study and supervision of construction and industrial lighting projects
* During this experience I was involved in management and training of a team of electricians and workers in different regions in Tunisia (Gabès, Sousse, Tunis..etc)
-
TAOUFIK ELECTRICAL ENTREPRISES
- Technical Manager Assistant
1993 - 1994
* Study and Supervision of public lighting projects: Calculation of voltage drop and cables dimensions either in Aluminum or Copper and derivations definition according to the lights locations.
* Planning of installation tasks for the different projects
* Study and supervision of construction and industrial lighting projects
* During this experience I was involved in management and training of a team of electricians and workers in different regions in Tunisia (Gabès, Sousse, Tunis..etc)
-
TAOUFIK ELECTRICAL ENTREPRISES
- Technical Manager Assistant
1993 - 1994
* Study and Supervision of public lighting projects: Calculation of voltage drop and cables dimensions either in Aluminum or Copper and derivations definition according to the lights locations.
* Planning of installations tasks for the different projects
* Study and supervision of construction and industrial lighting projects
* During this experience I was involved in management and training of a team of electricians and workers in different regions in Tunisia (Gabès, Sousse, Tunis..etc) ;