Menu

Raphael POUZET

Paris

En résumé

Mes compétences :
Mobilité internationale
Commissioning
Management
Gestion de projet
Négociation
Expatriation
Gestion
Traitement des eaux
Water treatment

Entreprises

  • Veolia Water - Commissioning Manager

    Paris 2015 - maintenant • In charge of the Commissioning and site support of all SIDEM RO Desalination Projects (managing a team of 3+ commissioning engineers)
    • Collecting the experience feed-back of all sites to standardize and optimize future Projects in early stages.
    • 2015: SADARA (Jubail) Desalination Project – Saudi Arabia
    - Efficient interventions on site and support from head office leading to a successful and time efficient start-up of
    the Plant. Site Support on Process / Automation troubleshooting and optimization. Local staff training for
    Commissioning and O&M
    • 2015: MASDAR Desalination Pilot Plant – United Arab Emirates
    - Innovative Pilot Plant successfully started. Complete Commissioning of the Plant and R&D testing to push the pilot
    plant to maximize its efficiency (specific consumption kWh/m3 and overall Plant recovery)
    • 2016: OMAN Sur Desalination Project – Oman
    - Process and Site Support from head office (Commissioning expected 1st Semester 2016)
  • OTV - Deputy Commissioning Manager (Hong Kong)

    Saint Maurice 2012 - 2014 • Effectively manage a team of 10+ commissioning engineers and suppliers representatives on site (Andritz, GE, RCDC, Hamon,…) to start the Plant (4 Boilers, 2x14 MW turbines and associated equipment) in a short period of time.
    • Definition of the plant start-up philosophy (Commissioning Plan), efficiently optimizing the construction priorities and commissioning duration
    • Redefinition of Project planning and definition of ‘worklots’.
    • Design and implementation of the control philosophies of the entire plant. Software FAT and SAT on site. Pre-commissioning
    • Development and delivery of Project Progress Criteria and associated Progress Reports.
    • Power consumption and load shedding design and philosophy involvement.
  • OTV - Requested Commissioning Assistance and Expertise (Aruba)

    Saint Maurice 2012 - 2012 • Assistance to the commissioning team, in place,with control systems and process for the preparation of the performance tests
  • OTV - Deputy Commissioning Manager (Warsaw, Poland)

    Saint Maurice 2011 - 2012 • Deputy Commissioning Manager, in charge of a team of 5+ engineers.
    • Responsible for the commissioning and pre-commissioning tests.Documentation on main areas within the plant (including steam loop, steam turbine, cooling loop, furnace and flue gas treatment).
    • Responsible for automation and process tests on site (SAT) and for the safety PLC tests.
    • Successful start-up of the plant within a very short time period
    • Development and implementation of computerized tools to give priority and orientation to both management and construction teams. Tools were successful in improving the project time schedule.
  • OTV - Commissioning Engineer (Krakow, Poland)

    Saint Maurice 2011 - 2011 • Assistance for both plants intermittently
    • Assisted with the start up and preheating phases for both sites
    • Assisted in re-commissioning the Incineration phase of the Cracow Plant and preparation of the performance tests prior to the official TOC.
  • OTV - Commissioning Manager - Fujairah, UAE

    Saint Maurice 2009 - 2011 Commissioning Engineer, Team Leader of the Reserve Osmosis
    (7 months)
    • Pre-commissioning, process, construction follow-up, automation testing, optimization and tuning of the plant.
    • Training of the Operations Team
    • Developed and delivered the Return of Experience documentation on the Fujairah plant commissioning.
    • Effective organization of the plant’s priorities to fit into a compact schedule

    Commissioning Manager of the Fujairah Plant (7 months)
    • Managed a 20 person team to pass performance tests within a set schedule subject to heavy financial risks.
    • The plant was handed over to the client successfully and within the requested time period.
    • Effective and positive liaisons with the Project’s client.
    • Crisis management during external pollution of the Reserve Osmosis membranes and fast re-commissioning of the plant
  • Veolia Environnement  - Commissioning and Operations Engineer (Australia, Gold Coast)

    Paris 2007 - 2009 • In charge of the commissioning of the CIP and Neutralization areas of the plant.
    • Involvement in the start-up of the Reverse Osmosis and intake pumping stations.
    • Review and development of the Plant Control Philosophies and design of the HMI screens. Software FAT and SAT on site.
    • Training of the Operations Team and O&M documentation.
    • Developed several modules of the MERAM VWS Software
    • Implementation of the Maintenance Planning including the inventory of spare parts and purchase.
    • Developed Software to manage the history and replacement of the thousands of Reserve Osmosis membranes. This Software has since been implemented in 5 different Australian sites as well as Fujairah and Aruba.
  • Veolia Water - Control System Engineer (Ashkelon, Israel)

    Paris 2006 - 2007 • Member of the operations team in charge of the control system.
    • Improvements and upgrades on the SCADA system, setup of new network architecture for optimal reliability.
    • Process problems diagnostics
    • Good knowledge of the reverse osmosis process.
    • Development on the plant’s historian database, storing short and long-term records of all the plant’s equipment monitoring data.
    • Design of the associated data access Software to provide the operations team with real-time parameters and daily/monthly reports for the client.
    • Created and implementation of a connection between the supervision and the maintenance Softwares (MAXO)

Formations

  • ESIEE Paris (Paris)

    Paris 2000 - 2005

Réseau

Pas de contact professionnel

Annuaire des membres :