Salem HADRI

WAHRAN

En résumé

Mes compétences :
Piping Materials
technical support
dynamic planning
Quality Control
Procurement
Painting & Coating
Engineering development
temporary support
technical bid analysis
supervision of the client TOTAL/ REPSOL project ma
supervision of Bechtel and Kellogg
quality management
preventive maintenance
mechanical design
hydro testing
control planning
budgets
Total Experience
Responsible for field engineering
Quality Assurance
Pipeline Design
Pipe Support
Nondestructive Testing
Microsoft Office
Manage the design works
ISO 900X Standard
Bid analysis
Audit
Administration

Entreprises

  • STROC Industries - Piping Superintendent Consultant

    2012 - maintenant As piping technical Consultant for Piping and mechanical Construction at OCP ( phosphorous complex) at JORF LASFAR MOROCCO with Contractor STROC Industry-in charge of developing all piping construction procedures and QA/QC procedures, reviewing all Client engineering documents , supervising shop fabrication of piping spools and condensate tanks , preparing drawings and technical procedures for performing tie-ins to existing plant ; check the isometrics drawings before starting fabrication ;define the NDT required , the welding procedure WPS to be used , inspect and prepare Test packs for the tie*ins spools define the hydrostatic test to be applied once piping assembled and mounted with temporary support, assure Bid analysis for valves and special parts such as jacketed pipe and fittings assuring the HSE and safety during shop fabrication and during erection work ,daily check if TSTI meeting be done correctly, prepare dynamic planning and progress work & check the QC for the welding joints , verify the WPS and follow PQR before starting welding spools ,assist weekly meetings with Client UHDE and JACOBS related to Quality and progress. Ensure and inspect piping erection activities, prepare the as built drawings once final reception by client approved.
  • Entrepose Algeria- LNG - Piping Superintendent

    2011 - 2012 As Piping Superintendent at LNG Skikda -Algeria in charge performing 150 tie-ins to existing plant with Contractor KBR ; preparing all shop fabrication spools according to isometrics drawings ;perform NDT and Test packs for the tie*ins spools ,check and prepare the required material fittings ,pipe spools, valves and all instrumentations equipment preparing pneumatic and hydrostatic pressure tests related to KBR procedures, monitoring the warehouse assuring the HSE and safety during Construction work ,assist daily to TSTI meeting, prepare dynamic planning and progress work & check the QC for the welding joints , verify the WPS and follow PQR before starting welding spools ,assist weekly meetings with KBR related to Quality and progress. Prepare the as built drawings once final reception by client approved.
  • TOTAL E&P - Engineer

    2009 - 2010 Job title: Senior engineer and lead piping engineer for KHARIR/ ATUF oil projects
    For CCU and CPU Stations at oil treatment for KHARIR OIL PLANT
    In charge of
    Of generating PVV engineering deliverables for construction such datasheet for valves ,strainers ,check valves ,pipes and all related fitting according to TOTAL PMS applied for projects , engineering MTO, requisitions for material , datasheet for static equipments , condensate tanks, water tanks , hot oil exchangers , safety valves , relief valves , define material for insulation ;painting & coating

    * Ensure the quality engineering documents when are prepared by our Contractors ;
    * Review and comments if any all prepared documents by Contractors or from head office of TOTAL/France including specific equipments for the project ;
    * Ensure that all engineering documents ( deliverables) received to be in conformity with TOTAL specifications , standards and to respect all governmental laws/regulations
    * Define and identify any deviations to TOTAL Referential and inform by report to Engineering manager and ask Contractor to correct the engineering documents according to the required TOTAL Company specification or standards ( mostly for codes of construction , tests to be performed , material etc) ;
    * Make sure that all package engineering documents are checked reviewed by all disciplines before sending it for approbation by Manager then sent copies to Construction site for any eventual comments before stamping it for `' Approved for construction'' ;
    * Supervise and verify the engineering construction activities such as the layout , isometric dwg , MTO and MOC , SOW , MR , piping supports , the quality procedures related to lifting welding shop fabrication , fabrication of supports, hydro testing , NDT equipments installation piping erection ,scaffolding and safety procedures, datasheet of, valves , Safety valves , relief valves , strainers vessels , painting material , insulation material and all static equipments to be mounted to the projects such as hot oil exchangers, small water tanks , filters etc


    * Verify with the construction team the lifting means to be applied during erection at site


    * Assist all meetings with our Contractors during engineering phases discuss the technical questions related to equipments and valves


    * Assist to factory acceptance test FAT for 16 corrosion inhibitor units in SINGAPORE for KHARIR projects


    * Weekly meeting with Construction manager for evaluating work progress and planning


    * Ensure that the TOTAL HSE Policy been followed and understood by the construction team or the sub contractors involved at site for the projects


    * Participate and ensure interface between all engineering crafts for any change of scope , modifications to existing plant , change of planning or review of budgets


    * Liaise with E/I team for the hook-ups as well with other disciplines.


    * Preparing technical bid analysis TBT for all piping materials, valves.. and equipments in order to proceed material purchase


    * Site visit for construction progress, attending periodic work meetings with Contractors
  • UTE DESALEMENT ESPAGNE - Project manager

    2007 - 2009 * In charge of the management of the project in all phases Engineering, procurement and construction until the start-up. ;
    * Responsible for field engineering & all technical documents, control -quality control and administration - control planning, cost estimating & cost reporting -budget ;
    * In charge of the work organization and taking decisions for the activities in the field ensuring the safety to be implemented and applied during construction activities.
  • SONATRACH/TOTAL/REPSOL - Facilities engineer

    2006 - 2007 GTFT- GAS TREATMENT PLANT- HASSI-MESSAOUD
    Job title: with contractor SPIE and as senior piping / pipeline and facilities engineer work under the supervision of the client TOTAL/ REPSOL project manager:
    Main tasks carried-out

    * in charge of all work regarding field engineering related to development/installation of all facilities , mechanical equipment , piping & pipeline of related project works ;
    * Develop or ensure that high class engineering specifications, drawings, isometrics, standards civil & piping/pipeline and technical procedures are developed maintained and implemented by Contractor in all phases of projects being executed by the Projects Group to achieve that the facility delivered to end users are safe, reliable, operable and maintainable. Bid analysis for the choice of the sub-contractors. ;
    * Regular contacts with Shareholders, Consultants, Contractors, Vendors and managements for coordination of projects Engineering works and to keep abreast of development in the field of Engineering Development of Projects related work. ;
    * Frequent contacts with other Company's Departments outside Projects Group for provisions of interface technical support and administrative affairs. ;
    * Develop & frequent meeting regarding HSE to all personals and as well to subcontractors personals. ;
    * Conversant with the local regulation , DPP REGLEMENTS , ASME B31.3 , ASME B31.4 & ASME B31.8 , API 570 ...
  • Sonatrach - EDV/ENG & lead senior piping engineer

    1994 - 2006 Company downstream in engineering direction EDV/ENG: as lead senior piping engineer
    .

    * - In charge of all work regarding engineering related to piping, valves, of the assigned projects. Such as EPC helium project at Skikda , desalination plant at Arzew , world scale LNG plant , refinery at Adrar , condensate topping at Skikda , feasibility study for olefins plant , add new train of LPG... for their all phases ( basic , detailed engineering , procurement , construction . Until the start-up ) ;
    * As well I was- responsible to ensure the developments of all engineering design in regard area of work are at optimum levels, standardized and compatible. ;
    * Ensure that a state of the art technology is applied in the selection piping materials and associated auxiliaries while participating in all phases of projects ;
    * Develop technical specifications related to coating, paint, hot and cold insulation of pipes and equipment and ensure that engineering specifications, standards and procedures are applied and implemented by Contractor during construction. ;
    * Ensure that the works done are safe, reliable, operable and maintainable ;
    * Frequent contacts with the contractors & sub-contractors to obtain approvals and coordinating matters to various piping works. ;
    * - review bidders lists, bid documents for purchase of piping material , insulation& painting provisions ;
    * Frequent contacts with other Company's Departments outside Projects Group for provisions of interface technical support and administrative affairs. ;
    * Manage the design works, calculate the MTO & MOC regarding pipe, fitting, valves, insulation, painting and coating necessary to ensure that they are in accordance with the Scope of Work ;
    * Reviews/approves drawings, specification, datasheet and other technical documents related to piping for all types of projects incorporating the comments and requirements of the operating entity.. Audits and manages the work of Project Management Consultant's specialists and ensures that quality and standards are maintained and cost effective solutions are adopted. ;
    * verifies the quality of work done by the sub-contractors related to insulation and painting work ;
    * Witnesses pre-commissioning and commissioning of piping installation are in accordance with Company specification for critical equipment.
  • Sonatrach - Maintenance engineer

    1977 - 1994 Company / under the supervision of Bechtel and Kellogg.
    I worked for the LNG1 and LNG2 Plants.
    Job tile during this phase: maintenance engineer:

    * Maintenance working under the supervision of Bechtel Company during the first two years of warranty of LNG1 plant and at LNG2 under supervision of PM Kellogg ;
    * I was involved in pre- commissioning and commissioning of 8MTPA of LNG plant. ;
    * In charge to follow up maintenance work planning activities (overhaul &preventive maintenance) ;
    * participating in the repairs of vital equipment , alignment of Motor-pumps and turbines ;
    * Assist and help the maintenance personnel during the shut-downs of the plant.


    b) Papers /Seminars:
    -vibrations & vibration analysis

    * bearing & roller bearings ( journal bearing) ;
    * balancing shafts of equipment ;
    * corrosion & selection of appropriate materials ;
    * cathode protection of pipes ;
    * quality management systems (QMS) as to ISO 9000/2000 ;
    * Welding practices.
    * Non-destructive examination NDE. ;

Formations

  • Salford University (Manchester)

    Manchester 1973 - 1978 BSC.

    10. Languages: Very Good Speaking and Writing of 3 Languages: English/ French /Arabic